US Army Corps of Engineers BUILDING STRONG ® Louisiana Coastal Area Modification of Davis Pond Study Overview Governor’s Advisory Commission on Coastal.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers Budgeting Process
Advertisements

US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Relevant, Ready, Responsive, Reliable Flood Risk Management and the U.S. Army Corps of Engineers Actions for Change David Moser 1, Martin Schultz 2, Todd.
F1B - 1 BU ILDING STRONG SM Flood Risk Management Module F1: Authorities and Policies.
FDR1 - 1 Flood Risk management History/Mission/Policies.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
KEEPING WATER ON THE LAND Brandon Workshop March 20, 2013.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY 11 LARGE GROUP RESPONSE EXERCISE.
US Army Corps of Engineers BUILDING STRONG ® LOUISIANA COASTAL AREA (LCA) PROGRAM UPDATE June 16, 2010 Presented by: Bren Haase, OCPR Mark Wingate, USACE.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Project Planning with the U.S. Army Corps of Engineers (USACE) Presenter Name Presenter Title.
SMART Feasibility Study Process
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Comprehensive Basinwide Protection Recommendations 13 Primary Principals: 1.Serve as framework moving forward 2.Establish acceptable levels of protection.
 To conserve our remaining natural resources for future generations  To protect a valuable economic revenue stream  To organize management efforts.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
Savannah Harbor Expansion Project
Climate Change: SEAFWA Thoughts? Ken Haddad, Executive Director Florida Fish and Wildlife Conservation Commission September 2007.
US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
NGA CENTER FOR BEST PRACTICES Waves of Change: Examining the Roles of States in Emerging Ocean Policy.
1 Technological Innovations and Future Vision of Technical Support Louisiana Coastal Protection and Restoration and Mississippi Coastal Improvements Program.
Integrated Ecosystem Restoration and Hurricane Protection: Louisiana’s Comprehensive Master Plan for a Sustainable Coast.
LCA Mississippi River Hydrodynamic and Delta Management Study (MRHDMS) Carol Parsons Richards River Studies Manager Governor’s Advisory Commission on Coastal.
Theodore A. Brown, P.E., SES Chief Planning and Policy Division
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Gulf of Mexico Alliance SIMOR Briefing June 9, 2009.
Lakes District At Louisiana State University CAP 206 Project US Army Corps of Engineers New Orleans District.
Land Building Sediment Diversion at Myrtle Grove: Evolution & Status Update Brian Vosburg Geologist Governor’s Advisory Commission Meeting August
Illinois River Basin Restoration (Sec 519, WRDA 2000) Rock Island District Website: Agenda Summary of HQ Com Plan Rest.
EPA and Flood Risk – Programs and Perspectives Rob Wood Acting Deputy Office Director Office of Wetlands, Oceans and Watersheds U.S. Environmental Protection.
OREGON IDAHO WYOMING COLORADO NEVADA NEW MEXICO TEXAS UTAH ARIZONA CALIFORNIA US Army Corps of Engineers BUILDING STRONG ® And Taking Care Of People! Arroyo.
River of Grass Phase I Planning Water Resources Advisory Commission Issues Workshop February 3, 2009.
Large Scale Nonstructural Programs - Louisiana’s Comprehensive Master Plan for a Sustainable Coast – 2012 Update Association of State Floodplain Managers.
Civil Works Transformation Foundations of SMART Planning
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
James C. Gibeaut Harte Research Institute for Gulf of Mexico Studies, Texas A&M University – Corpus Christi Presented to: Coastal Engineering Research.
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.
Managing the Mississippi River’s Sediment, Nutrients, and Fresh Water July 13, 2011.
Recreational Impacts of Coastal Restoration Projects CNREP Presentation Joseph Berlin May 28, 2010.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
US Army Corps of Engineers ® Engineer Research and Development Center Hydrodynamic, Water Quality, and Ecological Modeling to Assess System-wide Impacts.
A Pivotal Moment for Leaders Across the Gulf Coast States and Connected Communities Throughout the Country.
The Science and Policy of Louisiana Coastal Ecosystem Restoration.
Building Strong 1 1 MRGO Ecosystem Restoration Plan Feasibility Study Gregory Miller Senior Project Manager Corps of Engineers New Orleans District October.
STATUS UPDATE FOR CPRA January 26,  Study combines Cong. Boustany Recon with LCA Chenier Plain Effort  Cost Share Agreement signed in Jan
US Army Corps of Engineers BUILDING STRONG ® Boise River Feasibility Study Ellen Berggren, PMP Outreach Coordinator/ Project Manager Idaho Governor’s Roadless.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
South Bay Salt Pond Restoration-- Challenges to Ecological Restoration.
2017 Coastal Master Plan Overview Karim Belhadjali
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
57th Annual Meeting of the GLFC Buffalo, NY June 6-7, 2012 Water Level Regulation in the LO/SLR System Environmental Considerations and Plan BV7.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
Louisiana’s Coastal Protection and Restoration Update
CPRA Program Update ACEC, New Orleans Chapter April 14th, 2016
Expert Panel on Diversion Planning and Implementation: Meeting #3
Louisiana Coastal Area
Michigan Dept. of Environmental Quality Water Resources Division
Davis Pond Freshwater Diversion – Status of MR&T Project and LCA Study 9/11/2012 Status Briefing for BTNEP Management Conference.
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Louisiana Coastal Area Modification of Davis Pond Study Overview Governor’s Advisory Commission on Coastal Protection, Restoration and Conservation Mark R. Wingate, PE Chief – Projects and Restorations Branch April 4, 2012

BUILDING STRONG ® Purpose  To update the Governor’s Advisory Commission on progress of the LCA Modification of Davis Pond feasibility study: ► Planning Objectives and Constraints ► Alternatives under consideration ► Other factors to be considered ► Timeline to completion 2

BUILDING STRONG ® Background One of 15 critical projects authorized in WRDA 2007 “to sustain a larger coastal ecosystem that supports and protects the environment, economy, and culture of southern Louisiana” WRDA language provided sequencing insight Modification of Davis Pond (MDP) - Title VII, Sect 7006(e) – LCA “4” LCA “4” FCSA Signed 5 June 2009 (includes MDP) Next Step – TSP selection (13 April 2012) Chief’s Report to be signed - 1 Nov

BUILDING STRONG ® Planning Goals and Objectives Goal: Identify operational change that maximizes restoration outputs in the Barataria Basin Objectives: Over the 50 yr period of analysis: Objective 1: Decrease the rate of land loss, and where possible, increase wetland acreage Objective 2: Increase the geographic extent and distribution of Davis Pond freshwater, sediment, and nutrients throughout the study area 4

BUILDING STRONG ® Planning Constraints Avoid or minimize negative impacts to T&E (Pallid Sturgeon) Avoid or minimize adverse impacts to habitat Maintain level of flood protection/no induced flooding Avoid or minimize impacts to navigation Avoid or minimize low dissolved oxygen and/or algal blooms Assess only operational changes Other factors to be considered 5

BUILDING STRONG ® Analytical Tools 1)H&H Modeling (TABS) – detailed history and forecast of hydrology 2)SAND Model - estimates sediment deposition rates 3)WVA - estimates restoration outputs 4)IWR - economic analysis on cost effectiveness 5)Trade-off Analysis - Socioeconomic Impacts, EFH 6

BUILDING STRONG ® Modeled Area GRAND ISLE DIVERSION STRUCTURE MYRTLE GROVE 7

BUILDING STRONG ® Alternatives Under Consideration 8

BUILDING STRONG ® Plan Formulation Developed an initial array of 42 alternatives Screened based on criteria Final Array ► 8 alternatives ranging from “no-action” to operating at maximum capacity throughout year 9

BUILDING STRONG ® Future Without Project: No Action -Maintain current operation of structure X X MYRTLE GROVE 10

BUILDING STRONG ® River Stage Dependent/Open Continuous: Alternative 18 -Maximum possible flow throughout year -No Salinity target -No Time constraints X X X X MYRTLE GROVE 11

BUILDING STRONG ® Maximize Sediment Load and Maximize Footprint: Alternative 41 -Maximum capacity operation during sediment peaks -Establish new salinity target during non-sediment peaks X X MYRTLE GROVE 12

BUILDING STRONG ® Major Flow Event (3 Year Cycle): Alternative 17 -Capture maximum sediment for year 1 during sediment peaks -For years 2 and 3, focus on establishing new salinity target -Repeat 3 year cycle X X MYRTLE GROVE 13

BUILDING STRONG ® Major Flow Event (5 Year Cycle): Alternative 40 -Capture maximum sediment from the river for year 1 during sediment peaks -For years 2, 3, 4, and 5, focus on establishing new salinity target -Repeat 5 year cycle X X MYRTLE GROVE 14

BUILDING STRONG ® Maximize Sediment Load With Time Constraint (Jan – Apr): Alternative 42a -Maximize flow during high river conditions -Establish new salinity target for remainder of year X X MYRTLE GROVE 15

BUILDING STRONG ® Maximize Sediment Load With Time Constraint (Jan-Apr): Alternative 42b -Maximize flow during high river conditions -Maintain existing salinity target for remainder of year X X MYRTLE GROVE 16

BUILDING STRONG ® Maintain New 5ppt Isohaline: Alternative 39 -Establish new annual salinity target X X MYRTLE GROVE 17

BUILDING STRONG ® Projected Wetlands in Acres No Action: 45% reduction in landmass over 50 years Alt 18: 43% reduction in landmass over 50 years Approximately 10 square miles difference between Alt 18 and No Action Only assesses operational changes of DP structure *Values Assume Intermediate Sea-Level Rise 18 Project Year No ActionAlt 18Alt 41Alt 17Alt 40Alt 42aAlt 39Alt 42b 0394, ,575360,576360, , ,967324,916325,008324,876324, ,855323, ,268286,562286,563286,336286,302286,277286,246284, ,871255,742255,626255,298255,229255,162255,102252, ,735225,074224,855224,424224,329224,239224,153220,873 Approximate Acres Lost 175,800169,600169,900170,100170,200170,300170,400173,700

BUILDING STRONG ® Wetland Value Assessment Results (Year 50) - AAHU (Average Annual Habitat Unit) – Increased Habitat Quality Alt Habitat (AAHUs) Total Acres Remaining in Basin (50 years) SwampFreshIntermediateBrackishSaline TOTAL INCREASE (AAHU) 1803,4182, ,016225, ,4082, ,658224, ,3002, ,912224, ,2891, ,342224,329 42a03,2161, ,745224, , ,295224,153 42b02, ,106220,873 No Action 218,735 19

BUILDING STRONG ® Other Factors to be Considered  Planning Aid Letter  Environmental effects (adverse and beneficial)  Social effects (adverse and beneficial)  Risks and uncertainties 20

BUILDING STRONG ® Milestone Schedule ActivityFinish Tentatively Selected Plan13 Apr 12 Agency Technical Review (ATR)14 Jun 12 Respond to ATR Comments28 Jun 12 Vertical Team Review12 Sep 12 Alternative Formulation Briefing (AFB)17 Sep 12 Public & Independent External Peer Review15 Feb 13 Mississippi River Commission Prep/Briefing6 Mar 13 Civil Works Review Board3 Jun 13 Final S&A/NEPA Review/Comment Response18 Sep 13 Sign Chief’s Report1 Nov 13 21

BUILDING STRONG ® Questions? 22

BUILDING STRONG ® Backup Slides 23

BUILDING STRONG ® Alt 42b Alt 39 Alt 42a Alt 40 Alt 17 Alt 41 Alt 18 IWR Analysis In thousands

BUILDING STRONG ® Final Array of 8 Alternatives a3942bNo Action Existing 5ppt xx x x New 5 ppt x x x Time Constraint xx xx Sediment Constraint x x x 25