Brunswick Nuclear Plant Storm Drain Stabilization Pond Tritium Issues.

Slides:



Advertisements
Similar presentations
Question 2 How much of the nutrient should I apply??
Advertisements

PENNSYLVANIAS STATEWIDE SURFACE WATER ASSESSMENT PROGRAM: A Strategy For Evaluating Surface Water Quality Throughout The Commonwealth.
Overview of the EPRI Groundwater Assessment Program
Application Update of ANI Guideline “ Potential for Unmonitored & Unplanned Off- Site Releases of Radioactive Material” William Wendland, P.E. American.
Application of ANI Guideline William Wendland, P.E. American Nuclear Insurers Glastonbury, Connecticut USA Philadelphia, PA June 2007 “ RETS – REMP.
The Changing Faces in Effluent and Environmental Monitoring Douglas Wahl Exelon.
RETS-REMP WORKSHOP June 25, 2012 Greg Jones R. E. Ginna Nuclear Power Plant Constellation Energy Nuclear Group, LLC 1.
17 th Annual RETS-REMP Workshop Philadelphia, PA June 25-27, 2007 Cook Nuclear Plant Experience with Storm Water Tritium Discharges Jason T. Harris Purdue.
BoRit Superfund Site Timeline
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
RETS – REMP Workshop NRC Activities June 25, 2007 Presented by Steve Garry.
The Need For A New Conceptual Site Model Peter Strauss December 11, 2013 CPEO’s Moffett-MEW Community Advisory Board Mountain View, California.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Tritium. Bldg Site of SNAP8ER Reactor Accident.
1 Characterization of Groundwater Contamination at Yankee Nuclear Power Station - Rowe, MA RETS-REMP Workshop June 26-28, 2006 – Mashantucket, CT Dave.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
Braidwood Generating Station
Implications of Tritium Dose Conversion Factors in Deriving Regulatory Limits for Drinking Water and Effluent Compliance Ken Sejkora Entergy Nuclear Northeast.
1 Potential Sources of Groundwater Contamination at Nuclear Power Plants RETS-REMP Workshop Nine Mile Point- Constellation Energy June th, 2004 Eric.
Brunswick Nuclear Plant Storm Drain Stabilization Pond Groundwater Investigation and Remedial Evaluation Presentation Prepared and Presented by: Silar.
1 Fe-55 and Te-125m in Liquid Waste RETS REMP Workshop June 26-28, 2006 Richard Conatser Constellation Energy Group Calvert Cliffs Nuclear Power Plant.
REMP Ramblings 2006 RETS/REMP Workshop Jim Key Key Solutions, Inc.
Atmospheric Sources of Tritium and Potential Implications to Surface and Groundwater Monitoring Efforts Ken Sejkora Entergy Nuclear Northeast – Pilgrim.
Vermont Yankee VSNAP Presentation February 22, 2011 Mike Romeo Director NSA.
RETS REMP 2007 Philadelphia, PA June 25 – 27, 2007 Eric L. Darois, CHP
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
Bob Evans, Director Lexington Field Office Office of Surface Mining Reclamation & Enforcement.
Well Construction Example 1 Screen in Target Confined Aquifer C Confined Aquifer B Proper Well Construction Requirements In addition to the Virginia Department.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
Karen Kim Sr. Project Engineer, EPRI
Storm Water Pollution Prevention Training
Impact of Utility GPI Activities on a State REMP Program RETS-REMP Workshop 6/23/2008 Dale Dusenbury, MSPH,CHP Health Physicist Supervisor NC Radiation.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
FSA Groundwater Flow and Solute Transport Model Presentation to Scottsdale Citizens Group March 19, 1999.
Radiation in Your Environment. Radiation Around You Nature –Cosmic (direct and cosmic-produced radioactivity –Terrestrial (including radon) Medical Consumer.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Outdoor Tanks – Potential Release Issues Vent – for some sites vented to atmosphere Overflow line – to a pit or sump (difference?) – where does it go?
Ronald Warren Ecological & Environmental Monitoring National Security Technologies, LLC Community Environmental Monitoring Program Workshop July 26, 2011.
Tritium in The Demin Water System -- An IE Bulletin Challenge Ken Sejkora Entergy Nuclear Northeast – Pilgrim Station Presented at the 12 th Annual.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Regulatory Framework for Uranium Production Facilities in the U.S.
MPCA Groundwater Roles
Groundwater and NAPL Monitoring Oregon DEQ, Hart Crowser, Inc., and GSI Water Solutions 2010 McCormick & Baxter Annual Report.
USDA Natural Resources Conservation Service “Helping people help the land"
Debra Harrington and Haizhi Chen FDEP Groundwater Protection March, 2005 PROTOTYPE FOR SPRING SYSTEM ASSESSMENTS.
Evaluation Measures for Municipal Storm Water Management Programs Daniel Rourke Fresno Metropolitan Flood Control District October 15, 2003 Counting Raindrops.
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Results of 2001 Barksdale Site Investigation April 2, 2002 Presented by: DuPont Corporate Remediation Group.
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Fort Detrick Installation Restoration Program Area B Groundwater November 1, 2010 Fort Detrick, Maryland A Sustainable Community of Excellence.
Eden North Carolina Coal Ash Spill Initial Emergency Response North Carolina Emergecy Management Conference Sunset Beach, NC, 2014.
RESULTS AND DISCUSSION
Potholes Supplemental Feed Route Project
ASSESSMENT OF CORRECTIVE MEASURES PUBLIC MEETING
Hydrologic Cycle and Watersheds
NRC Cyber Security Regulatory Overview
This photo was taken in August What has changed since then?
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Research and Test Reactor Decommissioning Inspections
The Water Cycle Aka Hydrologic Cycle.
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Brunswick Nuclear Plant Storm Drain Stabilization Pond Tritium Issues

BNP SDSP

History l Stabilization Pond constructed from a spoil pond to provide Brunswick Nuclear Plant (BNP) with the capability to meet EPA effluent storm water release standards l Issuance of RETS. Stabilization Pond identified as a potential liquid effluent release point. l The licensee identified the Stabilization Pond as a previously unrecognized release point for tritium.

History l ANI Inspection Report w In as much as the pond is unlined, the likelihood of nuclide migration (particularly tritium) into the groundwater is relatively high.

History l 2006 – BNP began to analyze water in manholes for tritium and gamma emitters l Tritium was discovered in manholes in vicinity of Storm Drain Stabilization Pond w Values were 75,000 pCi/l to 150,000 pCi/l l 2007 Standing/Flowing water containing tritium was found on the areas outside of the SDSP dike some of which was flowing toward intake canal. w Values were 47,000 pCi/l to 880,000 pCi/l.

History l As part of the expanded monitoring scope, resulting from the discovery of tritium in waters outside of the SDSP, more samples were taken and analyzed at various locations in and around the SDSP area. l Monitoring Wells installed at SDSP area.

MH < LLD < LLD (Well) MH < LLD MH 76,210 MH166, ,800 47, ,100 WP-24<LLD 793, , , ,400 < LLD (well) 565, , , , ,500 36, ,400 93, , ,200 1,511,000 BNP SDSP Manhole and Surface Water Results June 2007

WP-48 (612) WP-49 (409) WP-50 (413) WP-51 (411) WP-52 ND WP-57 ND WP-56 ND WP-55 ND WP-54 ND WP-53 ND WP-26 (281,600) GUM LOG BRANCH NANCY CREEK WALDEN’S CREEK WP-27 (36,050) RECOVERY POND Expanded View of SDSP Area

ESS - 20 B & C Well(s) Complete ESS - 19 B & C ESS - 22 B & C ESS - 21 B & C ESS - 24 A, B & C Monitoring Wells ESS - 23 C ESS - 18 B & C ESS – 17A, B & C Stab Well ESS - 25 B ESS - 26 C ESS – 27A & C ESS - 28 C ESS-NC-1 ESS-NC-2 ESS-NC-3 ESS-NC-4 ESS-NC-5ESS-GLB-1 ESS - 25 C ESS - 31 C ESS - 30 C

Summary of Results l Highest activity taken in shallow wells was ~750,000 p/Ci/L. l Highest activity taken in intermediate wells was ~24,000 p/Ci/L. l Activity was not detected in deep wells.

Immediate/ Interim Corrective Actions l Reduced the primary input source of tritium to the SDSP l Terminated unmonitored releases into the intake canal – instituted compensatory measures w Installed catch basins to route groundwater flow to the SDSP w Installed hard pipe arrangement to release SDSP water to intake canal versus open ditch l Made voluntary notifications to government officials and the community l Installed new ground water monitoring wells around perimeter of SDSP l Performed a complete sample profile of the surface and groundwater at locations around the perimeter of the stabilization pond to define the extent and magnitude of tritium activity

Planned Corrective Actions l Develop and implement a plant modification to stop major input source l Remediate Pond and Groundwater l Conduct a full dose assessment of the impact to the public l Evaluate other potential areas/structures outside the protected area that may exhibit the same characteristics or susceptibility to leakage (extent of condition/cause). l Install additional monitoring wells

Off-site Detections in Surface Water

Other Tritium Related Issues l SDSP tritium evaporation w Accounted for approximately 74 curies in 2007 which yielded approximately 2E-02 mrem inhalation dose to the nearest resident. w Model for transpiration still under development. l Liquid releases from marsh areas w Marsh area releases are to Nancy's Creek w Accounted for approximately 55 curies of tritium which yielded a calculated dose of approximately 7.2E-04 mrem dose from fish consumption and 1.8E-04 mrem from invertebrates consumption (shrimp, crabs, etc.). w Methodology still under development for additional refinement relating to marsh and aquifer releases to surface water.

Planned Future Actions l Focused Groundwater Extraction with Containment and MNA to achieve the RAOs. l Establish a tritium fade and transport model to refine dose calculations. l Establish transpiration model for airborne dose modeling.

Questions