Leah Johanson, Water Environment Services

Slides:



Advertisements
Similar presentations
Trends in Suspended Sediment Input to the San Francisco Bay from Local Tributaries Presented by Setenay Bozkurt Philip Williams &
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
ACWA Stormwater Committee Meeting
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
Stormwater Management for Highway Projects Regulatory Environment And Tools.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Module 5: Storage Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Simplified Sizing Tool for LID Practices in western Washington Alice Lancaster, PE Herrera Environmental Consultants.
LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
UW LID Workshop Bioretention Flow Control Modeling May 2008
INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR LID FACILITY DESIGN Prepared.
Western Washington Hydrology Model Version 3 Vancouver, WA, Workshop October 17, 2007 PM.
1 Quantifying Hydromodification Impacts and Developing Mitigation Using a Four Factor Approach Judd Goodman CASQA Conference November.
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
HYDROLOGIC COMPUTER MODELING Washington Hydrology Society March 2006 Joe Brascher, President Clear Creek Solutions, Inc.
SDHM Hydromodification Overview
Western Washington Hydrology Model Version 3
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
HYDROMODIFICATION: AN INTRODUCTION AND OVERVIEW Presented by Jeffrey Haltiner, Ph.D., P.E. Philip Williams & Associates, Ltd. San Francisco, CA May2006.
WinTR-20 SensitivityMarch WinTR-20 Sensitivity to Input Parameters.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
Bay Area Hydrology Model Doug Beyerlein, P.E. Joe Brascher Shanon White Clear Creek Solutions, Inc.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
ODOT 2015 Geo-Environmental Conference
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Stormwater Treatment and Flow Control Dan Cloak, P.E. Presentation to the San Diego Region Co-permittees Hydromodification Workgroup December 6, 2006 Contra.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Bernie Engel, Larry Theller, James Hunter Purdue University.
Larry Theller Bernie Engel Youn Shik Park Purdue University GLRI Project Corps of Engineers 516(e) Program. May 17-18, 2011.
Hydrograph Modification Management in Contra Costa County Dan Cloak, P.E. Dan Cloak Environmental Consulting.
DES 606 : Watershed Modeling with HEC-HMS Module 4 Theodore G. Cleveland, Ph.D., P.E 29 June 2011.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Countywide Model SUSMP July 17, Topics SUSMP Timeline Goals Approach to Compliance NPDES Permit Requirements NPDES Permit Requirements Model SUSMP.
Western Washington Hydrology Model 2005 AWRA Annual Conference Doug Beyerlein, P.E. Joe Brascher Shanon White Clear Creek Solutions, Inc.
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
Sizing Stormwater Control Facilities to Address Stream-Bank Erosion Control Anthony M. Dubin, PE Brown and Caldwell Anthony M. Dubin,
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
Long Valley Creek: A Rainfall-Runoff Modeling Story Rob Thompson Hydrologist U.S. Army Corps of Engineers Sacramento District
Waterbody Classification Project A project of the Lakes and Watershed Commission, Dane County Department of Planning and Development, and the Dane County.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Christie Beeman and Jeff Haltiner Philip Williams & Associates Hydrograph Modification: An Introduction and.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Hydromodification Compliance in the Bay Area
A Traditional vs. Ecosystem Services Approach to Surface Water Management September 16, 2010 PRESENTED BY Carol Murdock, Clackamas County WES Mark Anderson,
Basic Hydrology & Hydraulics: DES 601
Clear Creek Solutions, Inc. LID Hydrology and Hydraulics Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Christie Beeman, Andrew Collison, and Mike Liquori Philip Williams & Associates Options for Flow-Control Compliance.
WWHM3 LID Stormwater Modeling Snohomish County August 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
Storm Water Management Plan Lawrence County, PA Katelyn Zollos CE 549.
Black Turtle Land Use Change Hydrologic Impact Evaluation Kyoung Jae Lim, Bernard A. Engel, Jin-Yong Choi, Jon Harbor, Larry Theller Purdue University.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
BUILDING AND RUNNING THE HYDROLOGICAL MODEL
Modeling Low Impact Development Techniques and Detention Basins in SWMM CEE 6/5460 David Rosenberg.
HEC-HMS Simulation Adding a detention pond at the outlet
TR-55 Urban Hydrology for Small Watersheds
Hydrologic Simulation Models
Hydrology.
Storm Water Runoff Storm Water Runoff
Northern California LID Hydrology and Hydraulics
Kickoff example Create a new file
Doug Beyerlein, P.E., Clear Creek Solutions, Inc.
What we have developed is…
Presentation transcript:

LID & Detention Pond Sizing Tool to Address Hydro-modification and Water Quality in Clackamas County Leah Johanson, Water Environment Services Andy Thayumanavan, Brown and Caldwell Janice Keeley, Brown and Caldwell Leah

Agenda Background Hydro-modification Tool Criteria Development Low Impact Development (LID) Sizing Tool Detention Pond Sizing Tool User Interface Next Steps Questions Leah

WES Surface Water Program Evolution Past emphasis on meeting regulatory requirements Stormwater management at the “site level” Movement toward goal of improving overall health of the watershed WES can best achieve this through effective and efficient stormwater management Partnering with others on non-stormwater-related activities that will help WES meet this goal Leah

Watershed Action Plans Project Purpose To develop basin specific plans that prioritize District activities and future investments for watershed management

Watershed Action Plans Study Area In Kellogg-Mt. Scott and other highly developed watersheds, hydromodification has likely had a significant impact on water quality, stream habitat, and channel conditions during the last 100 years. Hydromodification impacts have occurred to a lesser extent in Rock Creek and other watersheds that have less development. However the impacts could increase dramatically in the future as these watersheds are urbanized further unless mitigation of new impervious surfaces is effective at maintaining a hydrologic equilibrium with current conditions.

Key Outcomes of WAP Better understanding of the conditions in the watersheds Identification of high priority areas Prioritized CIP/ programmatic changes Early action items Update Stormwater Design Standards

Purpose of Sizing Tool Stormwater design standards updated to promote the use of Low Impact Development (LID) techniques, to promote infiltration and reduce hydro-modification impacts to streams Develop a simplified tool for development engineers to easily size LID and Detention BMPs to implement the new design standards Janice

What is Hydro-modification? The frequency and duration of geomorphically significant flows are the primary factors that control channel stability or instability Geomorphically significant flows range between: Lower Threshold – bed material is mobilized Upper Threshold – channel bank over-topping event Janice

Hydromodification Criteria Development Lower Flow Threshold – 0.42Q2 (ODOT) Upper Flow Threshold – Q10 (ODOT) HSPF Modeling Parameters (2006 SWMP MP, PWR) Rainfall Record Flow thresholds will be a part of WES’s adaptive management strategy.

Sizing Strategy – Flow Duration For flow rates ranging from 42% of the pre-project 2-year runoff event (0.42Q2) to the pre-project 10-year runoff event (Q10), the post-project discharge rates and durations shall not deviate above the pre-project rates and durations by more than 10% over and more than 10% of the length of the flow duration curve. Upper Threshold Flow Lower Threshold Flow

Sizing Strategy – Peak Flow For flow rates ranging from the lower flow threshold (0.42Q2) to Q5, the post-project peak flows shall not exceed pre-project peak flows. For flow rates from Q5 to Q10, post-project peak flows may exceed pre-project flows by up to 10% for a 1-year frequency interval. For example, post-project flows could exceed pre-project flows by up to 10% for the interval from Q9 to Q10 or from Q5.5 to Q6.5, but not from Q8 to Q10. Upper Threshold Flow Lower Threshold Flow

Sizing Tool Computational Methods: Site Hydrology Developer Enters: Site specific infiltration rate Planned impervious area Pre-developed land use Drainage area hydrologic soil group – B, C, D Janice

LID Sizing Tool Facility Types (7 options) Planter (Infil & Fil) Rain Garden (Infil & Fil) Vegetated Swale (Infil & Fil) Infiltrator Janice

LID Sizing Tool Computational Methods: Facility Geometry Rain Garden Example Janice

Sizing Tool Results Finished Product – Web-based interface with underlying look-up table containing sizes for each possible iteration of drainage area land use, soil type, facility type and site specific infiltration rate Janice with intro to Andy

Detention Pond Sizing Approach The detention pond sizing tool performs the following functions Configure pond geometry Design outlet structure Route post-project runoff Compare pre-project and mitigated flow duration Size the facility automatically to meet the WES HMP requirements

Computational Methods: Pond Geometry User inputs initial pond configuration including area, depth and side slopes Alternatively, the tool automatically provides initial pond geometry

Detention Pond Interface

Stage-Storage-Discharge Table

Flow Duration Analysis Flow duration comparison is performed for pre- and mitigated time series hydrograph Complete time series is analyzed Range of interest is between lower and upper threshold flows

Resizing the Pond If flow duration criteria is not met then the pond is resized iteratively The user can use the option to resize by either adjusting the area or depth Pond sizing is completed when hydro-modification performance requirements are met

Next Steps Beta testing Meetings with co-permittees Testing and training ODEQ 319 Grant Funding Web-based tool rolled out with new design standards Continued monitoring and adaptive management

Questions?

Sensitivity Analysis Slope Thresholds Time steps

Computational Methods: Outlet Structure Use pre-defined outlet configuration that include two orifices and an overflow weir. The bottom orifice is sized to discharge lower threshold flow, QLT The orifice is sized to discharge the upper threshold flow, QUT.

Compare Histograms Direct comparison between pre- and post-project durations for each flow bin is performed. A “Pass” or “Fail” result is generated for each flow bin within the lower and upper threshold flows. Results take into account the allowable 10% variance over the length of the curve (0.42Q2 to Q10).

Flow Duration Comparison