IWTP Facility
Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011
Building Foundations
Floor Slab Preparation
Backfill Building Foundations
1 st Column Erection
Steel Erection & Roof Girders
Building Ready for Cladding
Inner Skin Complete, Start Exterior Cladding
IWTP Cladded & Roofed
Piping Installation
Mechanical Installation
Equipment Placement
Electrical Control Room
Settling Pond – Wall Liner Application Wall Liner Application
Settling Pond – Wall Liner Application Wall Liner 2 nd Coat
Settling Pond – Floor Liner Application Floor Liner 1 st Coat
Settling Pond - Complete
Settling Pond & IWTP IWTP Settling Pond
Completed IWTP and associated infrastructure Completed IWTP Settling Pond Sludge Pit Exfiltration Pond Power Generator & Diesel Fuel Tanks Portal Creek Diversion