IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.

Slides:



Advertisements
Similar presentations
Potential sources of asbestos in buildings
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Total house building CO 2 emissions Design of a house civil/structural systems wall areas room volumes wall materials foundations framework access roads.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
Hospital of the Future Construction Update as of Dec. 3, 2010.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
U.S. Customs and Border Protection Infrastructure Update Transportation Border Working Group October 27, 2010.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Chapter 7 Metals.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Types of Concrete Foundations. Concrete Piers Foundation This type of foundation is mostly used on buildings with post & beam style construction. It is.
Steel Bar Joists Tyler Wells. Academy Sports Building The building we chose is Academy Sports. It is located in Opelika Alabama. Academy is a sporting.
ASSIGNMENT Begin on page 197 “The Foundation”.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Introduction to a pit installation
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.

Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Anna Moreno, Anna Amato Paul van Exel, David Leal, Magne ValenSendstad Anna Moreno, Anna Amato Paul van Exel, David Leal, Magne ValenSendstad Depuis Workshop.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Building Plans.
Facilities Modernization Program Funded by Measure B Project Report November 21, 2011.
TYPICAL member spot checks & alternate systems design study
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)
Historic Sailing Ship Exhibition Hall Group 6. Clients Requirements  ship must be enclosed and transparent  Appreciate the ship from many angles  provide.
QBC Europe and its facilities. Building purchased – 1 st August 2006 Open for business – 6 th October 2006.
1 Presentation 10: FLOOR SYSTEM COMPONENTS. 2 Framing Methods Platform Framing: –Each floor is constructed and then walls are placed on top.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
1 July 13, 2011 Some morning photos Tank Valve Box.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Orthographic Drawings
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Residential Construction Drawings
1 Planning Change. Painting a Room Select paint 10 days Sand and clean walls 3 days Buy painting supplies 1 day Buy paint 1 day 1 st coat 1 day 2 nd coat.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
Symbols and Room Finishes
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Building for Learning Project Photo Progress Report September 2010 Project commencement 21 st September 2009.
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
Upon completion of this module, you will be able to:
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
San Luis Potosi – New plant April 24th 2015
Multistory Office Building
Potential sources of asbestos in buildings
Decentralised Treatment Facility (DTF)
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Minuteman Vocational Technical Regional High School Progress
Progress Report 11/10/11.
1 Semester Project Design A Multi Story Office Building
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Humanities Matching Final
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Humanities Matching Final
Eaton MEDC, Sutton-In-Ashfield
Presentation transcript:

IWTP Facility

Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011

Building Foundations

Floor Slab Preparation

Backfill Building Foundations

1 st Column Erection

Steel Erection & Roof Girders

Building Ready for Cladding

Inner Skin Complete, Start Exterior Cladding

IWTP Cladded & Roofed

Piping Installation

Mechanical Installation

Equipment Placement

Electrical Control Room

Settling Pond – Wall Liner Application Wall Liner Application

Settling Pond – Wall Liner Application Wall Liner 2 nd Coat

Settling Pond – Floor Liner Application Floor Liner 1 st Coat

Settling Pond - Complete

Settling Pond & IWTP IWTP Settling Pond

Completed IWTP and associated infrastructure Completed IWTP Settling Pond Sludge Pit Exfiltration Pond Power Generator & Diesel Fuel Tanks Portal Creek Diversion