New I-65 Interchange at Worthsville Road Welcome!.

Slides:



Advertisements
Similar presentations
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Advertisements

Fern Valley Interchange Public Hearing November 3, 2010.
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Harlan to Hazard Study Public Workshop #2 Harlan to Hazard Study Public Workshop #2 Harlan, Leslie, & Perry Counties, KY December 2003 Harlan, Leslie,
FDOT R/W Guidelines Use of License Agreements
1 C E T A S Range of Alternatives Presentation Date Project Name Project location (city, county) ODOT Key Number:
U.S. 33 Northern Connector Alternative
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
The US 101 Mobility Study will -  Examine current and future conditions, identify key deficiency areas and propose multi-modal improvement packages along.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Longmeadow Parkway Fox River Bridge Corridor
Purpose of the Standards
I n t e g r a t I n g C S S Practitioner Module 3 Module 3: CSS and Livability In Area Wide Planning.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
New I-65 Interchange at Worthsville Road April 11, 2013 Welcome!
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Metro South Planning MetroLink in South St. Louis County Metro South MetroLink Extension Alternatives Analysis and Draft Environmental.
Andrew Winga, P.E. – WisDOT Project Manager.  Background on numerous Transportation Studies  What is a Planning & Environment Linkage Study  Problem.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
USA Parkway Project Welcome Public Information Meeting to the
Policy for New/Modified Access to Controlled Access Facilities.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
Context Sensitive Solutions Focus Group Session Lynn Purnell Parsons Brinckerhoff Prosperity Church Road Corridor December 8, 2005.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
In the ideal world… Transportation planning addresses NEPA principles. Collaboration/involvement starts in transportation planning. Planning leads to early.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
0 Freight Activities: Year in Review Dec. 12 th 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
All information presented is preliminary and subject to revision I-515 Alternatives Development Study Public Information Meeting March 31, 2016 Welcome.
Central Polk Parkway PD&E Study
Willow Meadows Civic Club Meeting September 13, 2011
US 181 Harbor Bridge Project
Public Workshop #1 August 18, 2010.
2040 Long Range Transportation Plan Update
Technical and Public Advisory Committee Meeting #3
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
S.R. 26 Road Rehabilitation in Clinton County
U.S. 20 at State Road 2 New Interchange
Presentation transcript:

New I-65 Interchange at Worthsville Road Welcome!

STUDY AREA Where is the Study Area?

Study Process: What is IJR? The Interchange Justification Report (IJR) is a stand-alone document which constitutes a request from INDOT for FHWA approval of new or revised access to the existing Interstate System. The document will demonstrate that reasonable care has been taken in addressing the criteria described in the Federal Register of February 11, 1998, confirming that future traffic operations along the affected Interstate corridor will not be adversely affected by the proposed action. IJR = Interchange Justification Report

Study Process: What is NEPA? The National Environmental Policy Act (NEPA) requires federal agencies to integrate environmental values into their decision making processes by considering the environmental impacts of their proposed actions and reasonable alternatives to those actions.

Project Timeline Data Collection Interchange Justification Environmental Documentation Alternative Selection Detailed Design Right of Way Acquisition Begin Construction Summer 2012 Project Development Process Community Advisory Committee Meeting December 2012 We are here Public Meeting Winter 2012 Public Hearing Spring 2013 Community Advisory Committee Meeting February 2013

What Have Stakeholders Said? Improve East-West connectivity Relieve traffic congestion in the area Coordinate with future land use plans Coordinate with local land owners regarding the Right of Way Acquisition process Enhance economic growth potential in the area

Purpose and Need – What Is It? An important factor in selecting the best alternative is the ability to address the Purpose and Need for improvements. Therefore, it is important to have a good understanding of those needs as we identify possible alternatives. Based on the technical analysis and public involvement findings, five transportation needs have been initially identified. Stakeholder Input Technical Analysis Purpose & Need A concise statement of the transportation problems to be addressed. 1.Improve Roadway Connectivity 2.Enhance Safety in the Corridor 3.Reduce Congestion at Existing Interchanges 4.Foster Economic Growth 5.Maintain Consistency with Local & Regional Planning

What Are the Technical Findings? Improve operations of Main Street interchange by reducing traffic by 30% Improve travel speeds and Level of Service on Interstate 65 Reduce expected crashes on I-65 and surface streets in the area Operate at reasonably free flow with forecasted traffic demands

Land Acquisition Process INDOT priority is to work with the property owners to minimize impacts of all projects. Process may begin after a Record of Decision. Process would include a plat of highway, independent appraisal, an offer, and a period of negotiations. Must propose fair market compensation for needed property Eminent Domain or Condemnation are always considered to be last resorts. What is the Land Acquisition Process?

Express Your Opinion Comment Forms Written and online comment forms Comments received by Dec. 19, 2012 will be reviewed for future consideration and incorporation.

Alternatives Identification & Screening

Alternatives Evaluation Stakeholder Input >Refine >Evaluate Best Blend of:  Improved Travel Performance  Avoid, minimize and mitigate Environmental Impacts  Compatibility with Community Goals Refine Stakeholder Input Evaluate

Cons  Reduces traffic congestion in the study area  Improves safety in the study area  Least conflict points  Provides free west to north movement onto the interstate  Simple bridge structure  Highest overall project cost  Most right of way required  Greatest impact to farmlands  Pond impact in southeast quadrant Parclo A4 Pros

Cons  Reduces traffic congestion in the study area  Improves safety in the study area  Fewest parcels impacted  Minimize impact to property in southwest quadrant  Heavy west to north movement provided by right turn loop  Lowest traffic capacity  Highest crash risk  Most excess right of way required  Largest footprint  Pond impact in southeast quadrant Pros Parclo A2

Diverging Diamond Interchange Cons  Reduces traffic congestion in the study area. Most efficient  Improves safety in the study area. Least crash risk  Provides free movements onto the interstate  Least right of way required  Lowest overall project cost  Avoids pond in southeast quadrant  Fewest impact to farmlands Most parcels impacted Counter intuitive for drivers Lower speed for through movements Pros

Thank you If you have additional questions please find one of our Team Members