“In House”, Resurfacing of Hatchery Raceways at National Fish Hatchery Casey Mitchel, Jeremy Sommer, Ira Wilson Nez Perce Tribe, Production Division, Dworshak.

Slides:



Advertisements
Similar presentations
The Unit Owners Association of the Madison, A Condominium Building Revitalization (Work Completed & Upcoming Work)
Advertisements

Fall Chinook Acclimation Project (FCAP) Overview Under ESA NMFS lists Snake River fall chinook as threatened in 1992 Co-managers agreed to release 450,000.
Single Coat 100% Solids Tank Linings SPECIALTY POLYMER COATINGS, INC. Single Coat 100% Solids Tank Linings.
DAY ONE - STEP ONE - Preparation Pure Crete is added to a water truck with a spray bar located at the rear of the truck at a ratio of one gallon to 2000.
Q&A Fish Feed Issues LOWER SNAKE RIVER COMPENSATION PLAN HATCHERY PRODUCTION MEETING BOISE, IDAHO - MAY 15 & 16, 2012.
Detachable Modular Flotation System (DMFS)
Calculating Coating Lifetime Costs
Above Ground Storage Tanks &
Permanent Head Gasket & Block Repair w/Nanotechnology, 32 Fl Oz
International Paper - Riegelwood Plant Riegelwood, NC
Pathfinder Plaster Craft Honor. The Steps Step 1 (Preparing) Cover your work surface with a newspaper, vinyl, or plastic. Plaster casting is a bit messy.
Innovative solutions for the rehabilitation of lead service connection lines and adjacent water mains.
Clay. Clay is a naturally material composed primarily of fine- grained mineral and water The combination of the two controls plasticity ((flexibility))
CBCAUTOMOTIVERKCBCAUTOMOTIVERK CYLINDER BLOCK INSPECTION & CLEANING u Chapter 11 u Classroom Manual u Page 259 u Lab Manual u Page 269.
Overview of Current Production Programs Across the Columbia River Basin.
Grouting Ceramic Tile This step comes after the tile is installed and has had time to cure. It is very important to either follow the instructions listed.
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Example of a successful lining Description: Tuff Stuff is sprayed as a protective lining onto a boat hull. The lining with TS provides a high level of.
Onslow Beach Bridge Jacksonville, NC.  This project called for abrasive blasting and protective coating application to the Onslow Beach Bridge, a rotating.
Corrosion Control. ™ Drylar™ * Daclar™ * Vezlar™ * Zavlar™ * Voxlar™ * Nular ™
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
Firestone Building Products EPDM Training. Membrane Attachment.
Ladders Module III. Ladder Construction Materials Metal Wood Fiberglass.
ROOF MATE Step-By-Step Application Over MODIFIED BITUMEN ROOFING Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF.
ABSTRACT The upper Willamette basin from Eugene to Albany was settled by Euro-Americans in the 1840’s. Since then, the Willamette River had been a vital.
Spray Painting. Primer Paint A primer is a preparatory coating put on materials before painting. Priming ensures better adhesion of paint to the surface,
2313 W Sam Houston Parkway NSuite 105Houston, TX77043 (T): (F): ROK Flex C Application Instructions.
Residential Construction Unit 6 Interior finishes Mr. Todzia.
ROOF MATE Step-By-Step Application Over METAL ROOFING Master Guide Specifications List of Materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER.
FRP Door and Frame System. FRP Door and Frame System What is FRP? Fiberglass Reinforced Polyester (FRP) skin Aluminum alloy perimeter extrusions Tie rod.
Rain Barrel Workshop February 11, 2012 By Melissa Merritt.
Chapter 29 Landscaping.
ROOF MATE Step-By-Step Application Over EPDM ROOFING Master Guide Specifications List of Materials: ROOF MATE WHITE ROOF MATE LIGHT GRAY ROOF MATE BUTTER.
Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER GRADE ROOF MATE MESH Optional materials: UCC (United.
Development of Weir-Wall Contour-Matching PIT Tag Antennas for John Day Dam Adult Ladders PTAGIS Field Office Kennewick, Washington April 2015.
The DUCTZ Experience. A Brief Overview of how DUCTZ Cleans a Heating and Cooling System.
ROOF MATE Step-By-Step Application Over CONCRETE ROOFING
Basic Cleaning Tools and Procedures
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
Epoxy Treatment of Centaur Hull Winston Waller W 4337.
Pennsylvania Fish and Boat Commission Division of Trout Production.
Tips and Techniques Used By Professional Painters Ph , URL:
Interior House Painting Techniques Ph , URL:
GLAZING 101 Herron High School. GLAZES There are essentially two types of colorants that we use here — underglaze and glaze.
ISRP Categorical Review January 17-19, 2012 Portland, OR Nez Perce Tribe Resident Fish Substitution Program “Trout Ponds Project” BPA No
Ceramics Clay Life Cycle. Stage 1  Clay is quarried from the earth, processed and packaged for production.
Installing a Backflow Cage. Verify the Backflow and Area.
Introduces yet another South African First – A GREEN way of cleaning wall-splits We have two services The “A” Services done annually The “B” service done.
EZ Wipes ® INDUSTRIAL CLEANING WIPES PURE WELDS START WITH PREPARATION REMOVE PERMANENT MARKER, GREASE AND OTHER CONTAMINANTS WITHOUT ACETONE OR HARMFUL.
IRRIGATION SYSTEMS. OBJECTIVES 1. Describe irrigation & its purpose 2. Explain preparation for irrigation systems 3. Calculate GPM 4. Identify & explain.
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
2016 SUBSTRATE PREPARATIONS. SUBSTRATE PREPARATION METHODS FOR CONCRETE Very Course Profile Scabbling – Suitable for very aged, weak or contaminated substrates.
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
House Painting Checklist – 7 Steps to Prepare Wall Surface for Painting Contact No : Address : 8 parr street, Toronto,
UniBond™ ST Polyester-Faced Adhesive Tape
Elastomeric Wall Coating: Garland’s Tuff-Coat™ Systems
Applying Paints and Enamels
Corrosion Control.
Cost-Effective Opportunity Partnership For Mobile Trailer Maintenance
관상동맥(Coronary artery )
2013 Renovations at Montebello Fish Cultural Station (FCS)
The Steps for Basement Renovations
3 Effective Methods to Repair the Cracked Plastic Radiator of Car.
Best Painting Services in Dubai By Maxicare
Note Taking Strategies
Impacts from elevated TDG Spring 2017
GLOVE BAGGING & PLASTICIZING
Coating Failure at a Gas Compressor Facility
Articulating Concrete Mattresses
Presentation transcript:

“In House”, Resurfacing of Hatchery Raceways at National Fish Hatchery Casey Mitchel, Jeremy Sommer, Ira Wilson Nez Perce Tribe, Production Division, Dworshak National Fish Hatchery 276 Dworshak Complex Dr., Orofino, ID Raceway Pond Material List Description QtyTotal N10A353 Dark Gray R01.8 Formula150$4,375 Haze Grey Epoxy N10A351 MIL DTL 24441c Type 11 F 151 Epoxy 5 gal225$6,563 Hardener N10V351 MIL-DTL-24441C, Type III F.151 Hardener 5 gal375$11,895 Reducer20$401 1" Concrete Anchors750$1,125 Rollers300$450 Paint Brushes50$250 Tyvex Suits1$180 Trowels20$100 Webcrete and Moose Milk1$2,000 Silkaflex Primer45$450 Silkaflex 1A Caulking50$580 Backer Rod250$87 Marine Sealant31$360 Inflatable Bladders15$3,375 Pipe Caps15$2,745 Total$34,936 In 1982 the Army CORP. of Engineers began construction of thirty raceways at Dworshak National fish Hatchery in Orofino Idaho. For the next thirty-one years these raceways were used to rear Coho and Spring Chinook Salmon. After thirty-one years of extensive use of the raceways they were showing signs of concrete erosion, cracks, rock pits, and heavy ware of fish fins. To extend the life-span of these raceways, resurfacing by employees of the Dworshak Hatchery, began in April of The purpose of the resurfacing was to prevent degradation of these rearing structures, provide a better rearing environment, reduce abrasions on the fish, and allow easier cleaning. Professional resurfacing of these ponds is expensive. Bids for a similar project broke down to costing less than 25% using in house labor. Extrapolating the savings to this project and using our own employees we estimated that we would be able to resurface an entire bank of raceways (15 ponds) for under $40,000. Preparations included installing inflatable bladders into our re-use system using a marine sealant to ensure that the raceways were bone dry. The grip strut walkways and aluminum channel was removed and labeled. The ponds were then pressure washed to remove loose concrete and debris. Sheets of Visqueen were placed on pond bottoms to determine moisture content of the concrete. Painters tape was placed over non-movable bolts and channels. Primer and paint were applied in two coats each using paint rollers and covers. About 300 roller covers and 50 rollers were used during the entirety of the project. During mixing of the two part epoxy and primer as well as applying the product to the ponds, respirators were required with a filter cartridge replacement of once a day. Approximately 20 gallons of primer and hardener were applied to each raceway after which 15 gallons of top coat were put onto each pond per coating. A crew armed with painter suits, rollers and respirators took less than two weeks to finish the application process. Another week was spent trying to put Humpty Dumpty back together again. Culture in these ponds has shown successful results for durability, fish health and ease of cleaning. The cost savings and benefits to the facility and fish were such that we have decided to repeat this process in Spring 2014 on 15 more raceways. Thanks Nathaniel Weise.