TOAST Transient Object Automated Search Telescope Timothy Young Tricia Johnson Chris Milford Rob Czapiewski Department of Physics Michael Sprengeler Concordia.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

HOU in Russia Irina GUSEVA St Petersburg - Central (Pulkovo) Astronomical Observatory of the Russian Academy of Sciences - St Petersburg State University,
Forest Park Astronomy Streaming Video Cameras at Forest Park High School Live Images from the Roof of Forest Park High School Prince William County Schools,
Computer Basics I Course Outline 1: What is a computer? 2: What is an operating system? Using a Desktop Computer 3: What are the basic parts of a desktop.
Optical Astronomy Final Year Double Honours Presentation Eoin Cartwright & John Loughran. Supervisor: Dr Créidhe Ní Shúilleabháin.
Observational Remote Procedures used at CEAMIG-REA – I77 C. Jacques.
Observatory Operation Basics Thomas C. Smith, Director, Dark Ridge Observatory (
Access to Site Even remote sites need some maintenance You don’t want to fly 2000 miles to replace a USB cable Make arrangements with a near by resident.
CESAR Educational Astronomy. Objective CESAR (Cooperation through Education in Science and Astronomy Research) will provide students all throughout Europe.
DarkRidgeObservatory.org1 Eclipsing Binary Star Program, Hardware and Software Thomas C. Smith Director, Dark Ridge Observatory.
Introduction of Lulin Sky Survey (LUSS) T. C. Yang 1, Q. Ye 2, H. C. Lin 1, C. S. Lin 1, W. H. Ip 1 1 Institute of Astronomy, National Central University,
Observations of Active Galactic Nuclei via a Student Operated Remote Observatory Whitney Wills Michael Carini-Faculty Mentor Department of Physics and.
ITE PC v4.0 Chapter 1 1 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Computer Networks  Week 1: Introduction; Computer Hardware and Software.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Expanding Fisheye Webcam Network Now Capable of Monitoring Most of the Night Sky Robert J. Nemiroff (Michigan Tech), Hugo.E. Schwarz (CTIO), The CONCAM.
Construction and Interfacing of a Solar Telescope Jon Turner University of Northern Colorado.
Observatory Automation, Scheduling and Remote Sites Presented by: Thomas C. Smith, Director, Dark Ridge Observatory And Tom Krajci, director, Astrokolkhoz.
Minor Planet Search Using TOAST Abstract: This research project used TOAST (Transient Object Automated Search Telescope) to perform a search for new minor.
_______________ RIT Observatory Data Pipeline & Automation Project: Summer Research ______________________ Presented by: Kevin Beaulieu & Dustin Crabtree.
INSTRUMENTATION AT THE GETTYSBURG OBSERVATORY….And what to do with it. American Astronomical Society 205 th meeting, San Diego, Jan 13, 2005.
The Nearby Supernovae Factory: Spectrograph Calibration Ben Dilday Advisor: Rick Kessler, CfCP Physics 335 Autumn 2003.
DATA BACK-UP ROUTER WEATHER STATION MOUNTCCDSERVICESMOUNTCCDSERVICESMOUNTCCDSERVICES 16 INCH 20 INCH DOME WIDE FIELD PRIMARY PC IMAGES WEATHER DATA.
Planning for a Remote Robotic Observatory in Australia! Due to the time zone differences between Kentucky and Australia, when it is 9:00 am in Lexington,
Planning for a Remote Robotic Observatory in Australia Suketu Bhavsar, Dept. of Physics and Astronomy, University of Kentucky (UK)! Due to the time difference.
Information Technology and banking Dr. Omar Al Jadaan.
ISSAT “Telescope Alpha” Richard Berry Astronomical League.
: : : : : : 300 affordable CCD camera Commercial 14”--32” tel.
Telescope Remote Control By: George Korody / Jeff Thrush.
The KPNO 4m “Mayall” Telescope Arjun Dey (NOAO). National Optical Astronomy Observatory Mission: provide the best ground-based astronomical capabilities.
Introducing Astronomy Education into High School Physics Curriculum Through the Use of the University of North Dakota Observatory Caitlin Nolby Space Studies.
The University of Alabama Observatory - New Visions April 2005.
NEO Research Project in Korea Wonyong Han 1, Yong-Ik Byun 2, Hong-Suh Yim 1, Young-Jun Choi 1, Hong-Kyu Moon 1 & NESS Team 1 Korea Astronomy and Space.
New Mexico Space Grant Consortium Student Launch Program Provide annual access to space for student experiments from Spaceport America.
The Construction and Operation of BOOTES-4 Yufeng Fan Lijiang Observatory, Yunnan Observatories, Chinese Academy of Sciences III Astrorob.
IPD Technical Conference February 19 th 2008 Cable Disk Inspection.
Fick Observatory - Boone, IA. Observatory Automation ongo02e March 26, 2002 Faculty advisor: Dr. John P. Basart Client: Joe Eitter ISU Physics Department.
3rd Integral Bart Work Shop Chocerady - November 1-3, Patrizia Ferrero GRB Too observations in Loiano Patrizia Ferrero (IASF-BO, OACT & Universita’
Move Pictures From Your Mobile Phone to Your PC.  You never know when a photo opportunity is going to arise, which is why having a camera phone can be.
Wilga 2007 π of the Sky Full π system and simulation Janusz Użycki Faculty of Physics Warsaw University of Technology.
Research and Imaging Program for the SVAS. Current Situation Society supports beginners well –Messier Group –Community Outreach programs Monthly star.
Utah Telescope Site Selection 2008 D. Kieda, S. Lebohec, W. Springer, P. Gondolo, K. Martens, P. Gondolo, P. Ricketts, C. Zimmer University of Utah.
Nyrölä Observatory Petri Tikkanen Jyväskylän Sirius ry.
The Space Grant Internet Telescope Network: The Beginning Dr. Paul S. Hardersen Director, ND Space Grant Consortium National Space Grant Directors Meeting.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
WEATHER BY: JENNIFER FAUTH KINDERGARTEN.
V = H + 5*log(  *r) + f(a) where: V = observed relative magnitude of minor planet H = absolute magnitude of the minor planet  = distance between the.
LIGO-G D LSC Meeting Nov An Early Glimpse at the S3 Run Stan Whitcomb (LIGO–Caltech) LIGO Scientific Collaboration Meeting LIGO Hanford.
PHEMU The Bucharest observational campaign Romanian Astronomical Institute of The Romanian Academy - AIRA ADRIAN SONKA, MARCEL POPESCU, DAN ALIN.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
The months of the year January February. The months of the year March April.
Mrs. Jowers’ Class News August 14, Mrs. Jowers’Class News Sept. 25, 2015 Oh my goodness! I can’t believe that I will be writing an October newsletter.
Seaborg Decommission James M. Craw Computational Systems Group Lead NERSC User Group Meeting September 17, 2007.
NASA Herschel Science Center - page 1 PACS NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 ESA AO and NASA Funding Call Phil Appleton and.
Time. Here is a clock. Clocks show us time. This is an hourglass. Hourglasses show us time, too. Click here.
Observation of New Mexico Skies Observatories Asteroids Asteroids DaWoon Jung DaWoon Jung.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Remote observatory ISON-NM Survey of Minor Solar System bodies L. Elenin¹, I. Molotov¹, V. Savanevich², A. Kozhukhov³, A. Bryukhovetskiy³, V. Vlasenko³,
IOTA Plans for 21 August 2017 Eclipse
Remotely Automated Observations of Transiting Exoplanets
Presented by: Kevin Beaulieu & Dustin Crabtree
Can you guess what this lesson is about?
Observational Astronomy Astrometry
Year 2 Autumn Term Week 12 Lesson 1
Texas Tech University Department of Physics and Astronomy
Year 2 Autumn Term Week 12 Lesson 1
Harbour Island Force Main Replacement
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
2015 January February March April May June July August September
Presentation transcript:

TOAST Transient Object Automated Search Telescope Timothy Young Tricia Johnson Chris Milford Rob Czapiewski Department of Physics Michael Sprengeler Concordia Lohit Gaddampolly Department of Computer Science Michael Gerszewski Ryan Kramer Space Studies

Funding Faculty Start-up NASA (match Provost, Physics and Space Studies) AAS (American Astronomical Society) Dakota Science Center Physics Space Studies

Briefly what TOAST is 10” MEADE telescope Dome – Robo-dome Camera – CCD ST-7e Santa Barbara Instrumentation Group Filter Wheel – BVRI, clear Software – TheSky, CCDsoft, DDW, Orchestrate, Lohit-Young software.

Timeline November 2000 – Toast originally was two telescopes combined in a roll-off roof. The proposal was rejected. April CCD Camera and filter wheel purchased. Summer REU – 8” Meade telescope on top of Witmer. Michael Sprengeler. Software – control telescope, camera, and new software to automate the system.

ST-7e 765 x 510 pixels 390, x 4.6 mm

Software Provides connection to telescope Provides connection to camera Coordinates actions of CCDSoft and TheSky

Up on the roof at Witmer

Timeline August 2001 – first test of automation mode. 60 asteroids were observed in a single night. Some in multiple filters. Second test (next night)– focuser went out. Ended the testing

Timeline Summer 2001 – contracted concrete foundation and concrete pier. Design the metal pier. No money for power and ethernet cables, which had to wait until spring.

Side View 40” To Trailer 2 ½ feet ½ foot 4 ½ feet Robo-dome Dome Robo-Dome base Concrete Foundation (to be constructed) Concrete base (to be constructed) Concrete Base (Width 4-5 inches) Top View 10 feet Power Cable & Ethernet 50” Concrete Foundation Telescope pier: Concrete 12 foot with 12” diameter

Timeline September Redesign base. Trips to Witmer basement. Designing a mount without seeing the wedge that sits on it. October 2001 – Dome arrives. Where to put it? PSO was not ready, so Graeme Dewar’s Lab.

ROBO-DOME ™ from Technical Innovations, Inc. Dome automation with be through Digital Domeworks Specifications  Works in cold climates (Fairbanks, Alaska)  Slaves to telescope, fits up to 10” Meade  About 4 ½ Feet in Height  About the same in Diameter

Timeline January 2002, Money for the cables, but had the work order in since Dec. In April I call, never got it. In May they say they are booked until October. I call and say we need it immediately, we get a break and it is completed over the summer.

Timeline Nov 2001 – present: Dome testing. Dome computer board was sent back twice. Relay problem Software incompatibility Dome Azimuth gear wore out. Dome 2 modes of operation, not working. Company changed ownership. UND had gotten the last Robo-dome from the original owner.

Timeline February 2002 – present: Computer 1.8 GHz Pentium IV (2) 60 GB HD 256 SDRAM Projected image down load – 500KB 60 images 5 filters. Fill both drives in 3 months.

Connections: Camera – Parallel port Telescope – serial port Dome – serial port Webcam – USB Ethernet – card Problem – needed to turn off some appliances. Firecracker – remote power switches But needed serial ports.

Timeline February Automation: Needed a program to run the other programs and organize an observing run. Lohit is hired to write software. It access an object database of 88,000 and organizes an observing run based on time rises, sets, limiting magnitude. Then places the data into an appropriate folder at the initiation of the observing run. Lowel Obs.

Timeline March We install all programs. We install VNC We get Hacked and virus We load a firewall

Telescope Meade LX200 10” telescope f/6.3 –Limiting magnitude – SBIG ST-7E CCD –FOV size (10’X15’) CFW-8 filter wheel Johnson BVRI

Timeline June 2002 – AAS - 10” GPS scope arrives July 2002 – Sent back to Meade. August 2002 – Doesn’t work with Dome software. Board for dome gets sent back.During scope test condensation needed to be removed. Dew Zapper.

Trailer Tree18 inch 16 inch TOAST Gate Proposed Site: 1View of the South 2Not too close to road PSO Grounds layout

Timeline November 2002:Finally everything is at the observatory. Barely fits. Computer needs keyboard…. But also monitor? As we change out equipment and do checks we take off the dome. The synthetic fiber track falls off. The top dome part comes back to Witmer and re-glued.

On cold winter nights in the observatory trailer– this is what happens You turn into an elf 1)No insulation 2)A small heater – never heats up 3)No bathroom 4)No water 5)Equivalent to a research station in Antarctica

Motivation Why do this? There are other, bigger telescopes that do this. But there is nothing like having your own.

TOAST First Light Image(remote) Thursday February 27, 2003

Purpose Originally: to automatically obtain follow-up observations on Minor Planets Now: Search for other transients – Supernovae, Novae, Comets, and gamma- ray bursts.

Goals Procedure: 1) Obtain asteroid information from MPC 2) Observe critical/follow-up asteroids 3) Astrometry and Mag. (also bands) 4) Send data back to MPC Research telescope – transient objects Faculty and students

Galatea-74

SN 1999em

Gamma-ray Bursts

Student Involvement -digital image analysis -computer programming -astronomy -problem solving

Sequence of events During the day TOAST calculates an observing schedule Comes online 1 hour after sunset. Lohit-Young program sent to Orchestrate Downloads to local computer 1 hour before sunset the system shuts off. Morning student identifies transient objects.

Discovery Algorithms Automation to be determined: How to put in a repeat observations How to analyze the data in real time. Send out for new object.

Closing remarks Reactions to TOAST Michael Meyer Steward Observatory UofA “We don’t even do that at Kitt Peak, it’s too hard” Alex Filippenko UC-Berkeley “That is really neat, I need pictures of this” Dr. Granzio UofChicago “There are not many of these around, you need to get on the HETE first alert system”