NAIC AUSAC Meeting – April 19-20, 2010 Telescope and Datataking status 2010 Visiting Committee Meeting Phil Perillat.

Slides:



Advertisements
Similar presentations
Summary of 74 MHz Test with “Power Down” at Parkes Site ( ) New Data file: _1120_z20s.rpf (apparently no matched load data taken this.
Advertisements

Fundamentals of Radio Astronomy Lyle Hoffman, Lafayette College ALFALFA Undergraduate Workshop Arecibo Observatory, 2009 Jan. 12.
NAIC Visiting Committee Meeting · March 4-6, 2008 FPGA SPECTROMETER COMMISSIONING Spectrometer description How it will be used Where we are at. What needs.
IUCAF SUMMER SCHOOL 2002 MITIGATION TECHNIQUES MITIGATION FACTORS - what is it? what is it good for? by Klaus Ruf.
AOUC committee 03APR14 Telescope status & RFI 2014 AOUC committee Phil Perillat.
NAIC AOUC Meeting – April 25-26, 2012 Telescope and Datataking status 2012 Visiting Committee Meeting Phil Perillat.
SDSS7 - DSP and Backends Intro, 12 Jul 2013 Digital Signal Processing Basics and AO Back-Ends Luis A. Quintero Digital Section Head Electronics Department.
Pore Detection in Small Diameter Bores The University of Michigan, Ann Arbor NSF Engineering Research Center for Reconfigurable Manufacturing Systems.
3mm amplitude test by Cheng-Jiun Ma. Observation Source : Orion SiO Frequency: GHz 256 channels within 64MHz bandwidth Ant 3 & Ant 4 no Tsys correction.
Teachers workshop 21feb09 arecibo observatory The Arecibo radio telescope 2009 teachers workshop Phil Perillat.
RFI shielding and mitigation techniques for a sensitive search for the 327 MHz line of Deuterium Alan E.E. Rogers, Joseph C. Carter, Preethi Pratap M.I.T.
Fundamentals of Radio Astronomy Lyle Hoffman, Lafayette College ALFALFA Undergraduate Workshop Union College, 2005 July 06.
NAIC Visiting Committee Meeting · February 19-21, 2007 Telescope Performance 2007 Visiting Committee Meeting Phil Perillat.
REU-Summer Student Seminars 14-June-2011 Signal Processing Instrumentation (RF / Analog) Ganesan Rajagopalan Electronics Department Arecibo Observatory.
Digital Correlated Double Sampling for ZTF Roger Smith and Stephen Kaye California Institute of Technology The digital equivalent of dual slope integration.
AUSAC Meeting · March 17&18, 2008 FPGA SPECTROMETER COMMISSIONING Spectrometer description How it will be used Where we are at. What needs to be done More.
GBT Spectral Baselines – Tuesday, 11 March 2003 GBT Spectral Baseline Investigation Rick Fisher, Roger Norrod, Dana Balser (G. Watts, M. Stennes)
Puerto Rican Spectrum Users Group Sept 23, 2010 Living with RFI at AO (aka rfi snooping) Puerto Rican Spectrum Users Group 23sep10 meeting Phil Perillat.
ALFA Surveys Workshop: december 2009 CIMA STATUS Rfi update 2009 ALFA Surveys Workshop Phil Perillat.
NAIC AUSAC Committee Meeting · March Telescope Performance and Datataking 2009 AUSAC Committee Meeting Phil Perillat.
Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Antennas in Radio Astronomy Peter Napier.
P.Napier, Synthesis Summer School, 18 June Antennas in Radio Astronomy Peter Napier Interferometer block diagram Antenna fundamentals Types of antennas.
NAIC Visiting Committee Meeting February 15-16, 2005 Telescope Performance Pointing the telescope. Gain curves for all receivers Recent high frequency.
1 1 January 27, 2009 VLBI2010 Proof-of-Concept Signal Chain Arthur Niell MIT Haystack Observatory.
APRPP review committee 24oct13 Telescope status 2013 APRPP review committee Phil Perillat.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
SMT Control System Steward Observatory Faculty MeetingMay 02, 2003 A rizona R adio O bservatory Thomas W. Folkers.
NAIC Visiting Committee Meeting · April Telescope Performance and Datataking 2009 Visiting Committee Meeting Phil Perillat.
Extragalactic Absorption Lines Observed from Arecibo Chris Salter (National Astronomy & Ionosphere Center, Arecibo Observatory, Puerto Rico)
Field Trials of an RFI Adaptive Filter for Pulsar Observations M. Kesteven, R.N. Manchester, G. Hampson & A. Brown Australia Telescope National Facility.
Arecibo Frontiers – 12 Sep Beyond the Frontiers: The Road From Arecibo to The Radio Synoptic Survey Telescope (RSST) Steven T. Myers National Radio.
The Telescope (pointing) Pointing background Current pointing errors. Some problems with pointing. Can we point during the painting project. For more info:
Pulsar surveys at Arecibo and Green Bank David Champion Gravity Wave Meeting, Marsfield, Dec 2007.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
1 Sardinia Radio Telescope, the VLBA and the HSA Luigina Feretti INAF Istituto di Radioastronomia Bologna, Italy.
The Future of the VLBA 27 & 28 January 2011 Arecibo, the VLBA and the HSA Chris Salter Arecibo Observatory (National Astronomy & Ionosphere Center) ‏
Online Session 2: Pulsar Data, Part 2 Sue Ann Heatherly Sarah Scoles.
NAIC’s 2009 Program Plan & Budget Presentation October 2008 RADIO ASTRONOMY AT ARECIBO Chris Salter (for Murray Lewis)
ALFA Installation & Status Steve Torchinsky GALFA Meet3, Arecibo August 29, 2004.
The Green Bank Telescope Frank Ghigo, National Radio Astronomy Observatory 7 th US VLBI Technical Meeting, Haystack, Nov 2009.
AOUC committee 30apr15 RFI issues at AO 2015 AOUC committee Phil Perillat.
AUSAC Meeting March 2-3, 2005 Telescope Performance Pointing the telescope. Gain curves for all receivers Reflector alignment Recent high frequency results.
Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, EVLA Front-End CDR On the Sky Tests.
Ming Zhu FAST Science Group General Technical Specification Spherical reflector : Radius ~ 300m, Aperture ~ 500m, Opening angle 110~120°
REDUCTION OF GALFACTS DATA AND VARIABLE RADIO SOURCES Scott Barenfeld with Tapasi Ghosh and Chris Salter.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Cosmic Microwave Technology, Inc.
RFI Protection Activities in IAA RAS
RFI Protection Activities in IAA RAS
Searching FRB with Jiamusi-66m Radio Telescope
The Development of Broadband VLBI Technologies in SHAO
Haystack Geodesy Program and Technical Development
Pulsar Timing with ASKAP Simon Johnston ATNF, CSIRO
2015 NanoGrav meeting Phil Perillat
GALFA & GALFACTS Chris Salter (NAIC – Arecibo)
ARECIBO ASTRONOMY SURVEYS
EVLA Advisory Committee Meeting System Status
GBT and other Green Bank Capabilities
Rick Perley National Radio Astronomy Observatory
AO Telescope Scheduling
Extragalactic Surveys at Arecibo
Some Illustrative Use Cases
Telescope Performance and Datataking
Prototype Correlator Testing
Feed & Front End PDR—Sys. Reqts
2015 AOUC committee Phil Perillat
Radio Astronomy Program
Correlator Growth Path
RADIO ASTRONOMY AT ARECIBO
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

NAIC AUSAC Meeting – April 19-20, 2010 Telescope and Datataking status 2010 Visiting Committee Meeting Phil Perillat

NAIC AUSAC Meeting – April 19-20, 2010 Talk Outline Telescope performance –Pointing –Gain/Sefd/Tsys:cband,lband, 800 Mhz –New telescope observing limitations Datataking: –Backends –Commensal observing Future –Backends –12 meter Summary Online:  apr10 vc10

NAIC AUSAC Meeting – April 19-20, 2010 Pointing Date Az Err (arcsec) Za Err (arcsec) Total Err (arcsec) 2003 mod mod mod Jul08-feb Mar09-jan Mar10-> Pointing model made dec07/jan08 after painting shutdown.

NAIC AUSAC Meeting – April 19-20, 2010 Mar09-jan10 data before break –Errs vs za –Errs vs az (1 az term y08-09 removed in model) Mar10: after beam repair: –Errs vs za (limits: 3.5 to 12 deg za) –Errs vs az (looks like 1az term..) RmsError: –Before break: 4.9,6.3 (za,az). Tot: 8.0 asecs –After break: 9.0, 10.6 (za,az). Tot:13.9 asecs Pointing Errors: mar09-mar10

NAIC AUSAC Meeting – April 19-20, 2010 Gain,SEFD,Tsys:lband,cband Data mar09 - mar Mhz 5000 Mhz Gain Tsys Sefd Beam width Lband 1400 Cband 5000 Gain K/Jy Tsys K28 K27 K SEFD2.5 Jy3.3 Jy bmWidth202”56”

NAIC AUSAC Meeting – April 19-20, Mhz rcvr Installed jul to dec09. penn state feed –Cooled to 70K, cavity filter in front of lna. –Gain,Tsys: Tsys high.. Cavity filter, over illuminates tertiary. –Sefd,BeamWidth –Rfi: Chn 67 (879 Mhz) LP tv. Helped buy parts for lp dtv so they would go off the air BYU single pol rcvr 5% smaller bm width –Still working on dual pol mode. Running out of time for clean band: –Emg services: , ready to go.

NAIC AUSAC Meeting – April 19-20, 2010 Alfa Alfa tsys measured during survey runs: –4048 measurements mar09 thru mar10. –Each color is a different project: White:A2010 (alfalfa), Red:A2048(ages), Green:A2433(auds), Blue:(A2453) –PolA on left, polB on right. –Beams 0-3 –Beams 4-6 –Beam 2a has unstable Tsys.

NAIC AUSAC Meeting – April 19-20, 2010 observing limitations The weights and distances on az arm. –Za for dome center of mass: 1.9deg below optic axis za –Ratio DomeWeight/ChWeight = 6. For constant moment arm: dzaCh = 6*dzaDome. How we observe: –Ch sits at 8.8 degrees, dome moves in za. –Azarm imbalance changes with dome za. –Elevation rails shimmed high so imbalance tilts receiver in dome, onto the paraxial surface. –3 tiedowns keep the average platform height fixed with temperature (no tilting of platform done by td’s)

NAIC AUSAC Meeting – April 19-20, 2010 The problem: Max allowed imbalance:15000 kip-ft –Various configs for ch, dome motion: BUT: max allowed imbalance depends on td tension –Td tension relieves tension in beams. Td tension used to keep avg platform height in focus. –This is a function of temperature since main cables change length with temp. Examples showing za range vs temp: –Dome tracks: Ch at stow: normal astronomy –Dome tracks: Ch tracks dome above 8.8 deg za –Dome tracks: Ch at 0 (aeronomy az swings).

NAIC AUSAC Meeting – April 19-20, 2010 What we can do: Removing weight from the dome –decreases the unbalanced moment arm Removing weight from the platform – Allows more tension in the tiedowns Installing the tertiary motor drives. –Lets you make the optical axis longer –This lets you increase the td tension (pull down on platform) to get back in focus. 1 platform inch is 2-3 kips per corner 1 deg F is.75 kips per corner.

NAIC AUSAC Meeting – April 19-20, 2010 Datataking: Backends DeviceType/bits# deviceBw MHzPols Interim corCor:3/9lvl4504 WappsCor:3/9lvl81004 GalSpectPfb/fft:8282 MockPfb/fft:122*7*2= DaeronSmp:141 or 210,51 Pfssmp: RISmp:

NAIC AUSAC Meeting – April 19-20, 2010 Datataking:new functionality Mock single pixel observing –7x172Mhz covers 1Ghz IF with 20Khz res. 1 Ghz, 10Khz res. Possible with 2 nd 7x172 set –Different settings allowed for 7 bands: Center freq, channels, bw, config:sumPols, 2pol, stokes. Mock file server upgrade: –3.2 -> 5.5 Tb/server. TotalDisk:14*5.5=70 Tb online. Mock aeronomy sampling system –6 bands: 32Mhz widest, –Example:10 sec clp spectra (ch)

NAIC AUSAC Meeting – April 19-20, 2010 Alfalfa extragalactic search, short integrations, large area Ages – extragalactic search, median integration Auds – extra galactic search: long integration Zoa : zone of avoidance Galfacts: galactic polarization survey Rrl: recombination line survey Togs- galactic survey Palfa: pulsar search. Datataking:Commensal PrimaryCom1Com2 alfalfa/wappTogs/galspectPalfa/mock1* Ages/mock1Togs/galspect Palfa/mock1Zoa,rrl/mock2 Galfacts/mock1Zoa/mock2 Igalfa/galspectGalfacts/mock1Zoa/rrl/mock2 Survey names: Routine survey commensal observing: Example: Igalfa/galfacts/zoa,rrl: may09-sep hour sessions Igalfa- galactic survey galspect, Galfacts: mock,full stokes, 300 Mhz Bw. 65Mb/sec *7 =455 Mb/sec, 4Tb/night Zoa/rrl:mock2, 300 Mhz Bw,.1 sec integrations.

NAIC AUSAC Meeting – April 19-20, 2010 Future:Backends Vlbi: Digital BackEnd: dbe –2: 1 for 305meter, 1 for 12 meter –Has mode to run 500 Mhz bw spectra Aeronomy –Integrate mock device with datataking. Planetary radar with mock: –Needs fgpa programming (or use regular baseband sampling with pdev).

NAIC AUSAC Meeting – April 19-20, 2010 Future:Backends Mock single pixel Baseband sampling: –Need to add functionality to cima –Work on pdev headers. –7 or 14 boxes.. –Bandwith per box: Bits1pol Mhz 2pol Mhz

NAIC AUSAC Meeting – April 19-20, 2010 Future:12 meter 12 meter telescope –Integrate with vlbi station observing using dbe –Allow non vlbi usage of telescope with 305m Needs pointing program IF signal needs to be piped into standard backends. Software to support it.

NAIC AUSAC Meeting – April 19-20, 2010 Summary Telescope performance: –Pointing: rmsError: za: 9.0 az:10.6 tot:13.9 asecs Need to fix 1 az term from tilted platform –Gain,Tsys,sefd,Tsys Sefd:800:13.Jy, lbw: 2.5Jy, Cband : 3.3Jy –Get 800 antenna replaced Tsys alfa K (vs za). fix bm2a. –Limitations: Za 3.5->12, daytime fixed position. Future: –12 meter integration. –Backends: Integrate aeronomy, do planetary radar, mock baseband sampling.