Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June 10-11 & 13, 2013.

Slides:



Advertisements
Similar presentations
The Committee and Research – Where are we and where might we be going?
Advertisements

Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Sustainable Construction
Overview History of the PDWG Three Steps to Renewable Water –Efficient Use –Sustainable Use –Reliable Use Conclusions.
A Sustainable Environmental Programme Enel Maritza East 3 Mike Foster CEO Enel Operations Bulgaria.
KING COUNTY & BROWN GREASE Local sewer agencies have a need to address restaurant grease trap waste. In response, there is the potential of a renewable.
Part III Solid Waste Engineering
© OECD/IEA 2013 Annual Renewables Questionnaire Overview IEA Energy Statistics Training Paris, 4–8 March 2013 Rachael Hackney, Georgios Zazias Annual Renewables.
Mike Hightower, Sandia National Laboratories Tom Jennings, Bureau of Reclamation New Mexico Water Research Symposium August 13, 2002 Feasibility Study.
Twelve Steps to a Sustainable High School “ It ’ s not easy being green! ” Kermit T. Frog.
SRC/OAS Project Environmental Performance Presenter: Julia Louise Brown.
Geothermal Energy: An Overview Kenneth M. Klemow, Ph.D. Wilkes University Kenneth M. Klemow, Ph.D. Wilkes University.
Cleaner Production Assessment (Chapter 4)
Renewable Energy Generation Geothermal Energy Systems Photovoltaic Systems Biomass Systems Landfill Gas Microturbines Wind Turbines Solar Water Heaters.
Foreign Affairs Security Training Center
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
Engineering Technology Division
Fremont County – Green Spring 2012 Research Team: Jacob Tolman, Justin Andersen, Thresia Mouritsen, Joseph Huckbody, John Beck Feasibility Study.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Community Infrastructure: Is your town ready for change? Presented By: Shanna Ratner Yellow Wood Associates.
Conversion Technologies as part of a Sustainable Solid Waste System A Presentation to the Commission on Local Governmental Services Department of Public.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
2 nd Public Meeting - Options March 30, Agenda  Overview of Water Issues  What is a WIRP?  Purpose of WIRP  Evaluation Process  WIRP Objectives.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
City of Brisbane Open Space & Ecology Committee April 27, 2006 Baylands EIR Scoping.
California Venue and Event Recycling Legislation Review of AB 2176 Model Ordinance For Waste Reduction at Venues and Events.
Fort Bliss Army Growth and Force Structure Realignment Draft Environmental Impact Statement Public Meeting November 2009.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
BMT Designers & Planners 1 Wind Farm Technology: Is it the Answer? National Defense Industrial Association (NDIA) 30 th Environmental and Energy Symposium.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
Phoenix Convention Center Phoenix, Arizona Net Zero for the Army Reserve Sustainability Track Getting to Net Zero: Energy, Water and Waste Amy Solana Pacific.
Regional Water Council Planning Update Dargan “Scott” Cole Hall Booth Smith & Slover, P.C. 191 Peachtree Street, Suite 2900 Atlanta, Georgia
Phoenix Convention Center Phoenix, Arizona Federal Water Efficiency Sustainability TrackWater Efficient Operations Kate McMordie Stoughton Pacific Northwest.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Assistant Secretary of the Army (Installations, Energy & Environment) DRAFT DECK Current issues Potential challenges and Opportunities Hon. Katherine Hammack.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
Phoenix Convention Center Phoenix, Arizona Army’s Net Zero Initiative Sustainability Getting to Net Zero: Energy, Water and Waste Alicen Kandt National.
Agenda 6:30 – 7:00 p.m. Open House 7:00 – 7:20 p.m. Presentation Welcome Introductions Project Overview Meeting Purpose Environmental Review Process Other.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Approaching Water Sustainability through Water/Wastewater Reductions William Fifty and Laura Lokey-Flippo USACHPPM - Surface Water and Wastewater Program.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
SEA - National plan Electricity Supply Arend Kolhoff Netherlands Commission for EIA Jordan - September 2003.
Environmental Toolbox. Technical Module Introduction.
1 Water Use in Oil and Natural Gas Production ConocoPhillips Canada Water in a World of Seven Billion Conference May 10,
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
Renewable Energy Potential at Contaminated Lands and Abandoned Mining Sites ConSoil 2008 June 5, 2008 Milan, Italy.
ERCOT Generation Drought Best Practices Workshop Water Conservation Practices for Texas Generators February 27, 2012.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
US Army Corps of Engineers BUILDING STRONG ® Greg Mellema Hydropower Master Plan (HMP) Operations Division Omaha District 08 Dec 2015.
What is a Green Job & Where Can you Find One? Kevin Fleming Riverside WIB. April 21, 2010.
Work Session Water Issues and Water Rate Study Topics: Fundamental Assumption Key Issues Areas of Concern / Focus Water Audit Water Meter Audit Water Rate.
28Feb08 Our Mission: A professional team of teams dedicated to sustainable hometown management, community well-being, and mission readiness Leading Change.
“The focus of the FORSCOM Installation Sustainability Program is to answer this question at each installation: How do we decrease the total regional environmental.
MS4 Permit – Meaning, History, and Annual Report Results Watershed Partners 4/13/
Biodiesel Production from Grease Waste February 3, 2011 IBR & Infrastructure Platform Tony Pack Eastern Municipal Water District.
Do you know? By 2015, an estimated 40-48% of new non-residential construction by value will be green, equating to a $ billion.
About Us Overview Off Grid Technologies is a premier engineering & consulting firm that specializes in renewable energy projects in commercial, industrial,
Entrepreneurship for the Renewables Sector A Key Driver of Economic Growth Razieh Ebrahimi Founder & Managing Director Middle East Investment & Management.
Program for installing heating systems using renewable energy, including the replacement or completion of classic heating systems Between July 15, 2010.
Sustainable Remediation Case Studies
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
Water Reclamation Plant Feasibility Study Update May 28, 2014
Development of Solar PV Projects on Brownfields
Water Reclamation Plant Feasibility Study Update
Planning Directors Meeting
City of Sunrise Wastewater Reuse Program
Solid Waste Alternatives King County Councilmember Kathy Lambert
Presentation transcript:

Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013

Fort Bliss Garrison Commander and EIS Lead Project Personnel COL Brant Dayley, Garrison Commander, Fort Bliss BJ Tomlinson, DPW Renewable Energy Manager, Fort Bliss Pamela Klinger, Army Environmental Command Jill Reilly, Army Environmental Command John Kipp, DPW Environmental Division, Fort Bliss

Purpose of Today’s Meeting Inform the public of the availability of the Army's Draft Environmental Impact Statement (EIS) for implementation of “Net Zero” Initiatives at Fort Bliss. Solicit input from the public regarding the alternatives presented and the environmental analysis of sustainable energy, water, and solid waste initiatives at Fort Bliss. Provide the public with an opportunity to obtain information about the project and provide comments regarding the Draft EIS.

Agenda Overview of Army Net Zero Initiative Fort Bliss’s Role in Net Zero Purpose and Need Proposed Action Alternatives Potential Environmental Concerns EIS Timeline Questions

Why Net Zero? Increase energy & water security. Reduce energy and water demand and solid waste generation. Army installations have a mandate to improve efficiencies in energy, water, and waste for the benefit of our current and future missions, quality of life, and relationships with local communities.

Purpose and Need Purpose: To fully implement the Army’s Net Zero energy, water and waste goals at Fort Bliss to ensure the Installation’s critical mission can be sustained in the future. Need: Net Zero is needed at this time to:  Better insulate Fort Bliss from potential disruptions to its energy supply due to vulnerable energy infrastructure;  Address both short-and long-term variations to water supply and quality;  Preserve raw materials for future use;  Minimize solid waste generation;  Reduce operating costs and reduce the demand for services provided by off-Installation providers all while protecting the overall mission of Fort Bliss.

Net Zero Definitions Energy: A Net Zero Energy Installation produces as much energy on site as it uses over the course of a year. Water: A Net Zero Water Installation limits consumption of freshwater resources and returns water back to the same watershed in a manner that does not reduce the quantity or quality of the groundwater and surface water resources of that region over the course of a year. Waste: A Net Zero Waste Installation reduces, re- uses, and recovers waste streams, converting them to resource values with zero landfill requirements over the course of a year.

Proposed Action The Proposed Action is to implement the Army’s Net Zero waste, water, and energy goals at Fort Bliss. Fort Bliss would evaluate and implement where feasible:  (1) producing as much renewable energy on the Installation as it uses annually;  (2) limiting the consumption of freshwater resources; and  (3) reducing, reusing, and recovering waste streams, converting them to resource value with zero solid waste landfilling.

Alternatives Six Action Alternatives, and a No Action Alternative were considered for evaluation in the EIS. Alternative 1 is the No Action Alternative Alternative 2 maximizes conservation practices to reduce resource consumption and waste generation to the maximum extent possible without infrastructure project improvements

Alternatives Alternatives 3-6 will evaluate water conservation, waste reduction, and energy infrastructure. Alternative 7 is a programmatic alternative for future energy development projects that may support Fort Bliss Net Zero initiatives. The Army may elect to implement more than one alternative, or a combination of proposed alternatives to best implement Net Zero sustainability initiatives at Fort Bliss.

Proposed Project Locations

Alternative 3 – Water Reclamation Pipeline  A “purple” water pipeline system would be extended onto Fort Bliss from City of El Paso wastewater treatment plants.  The reclaimed water would be available for installation secondary uses including landscape irrigation, golf course irrigation, central cooling towers, and central wash facility for cleaning tactical vehicles returning from training in the field.

Alternative 4 - Waste-to-Energy (WTE) Plant  Construction and Operation of a 45 MW WTE Plant  Two site alternatives have been identified for this Alternative; one in the southern portion of the South Training Area and the other, somewhere adjacent to Railroad Drive.  Land for development would be conveyed to the City of El Paso or a private developer for construction and operation.  WTE Plant will require utilization of municipal waste from the City of El Paso, delivered via collection trucks.  percent of the waste tonnage would become ash and disposed of in an off-post landfill. This includes all non-combustible materials received.  Scrubbers, baghouses, catalytic, and non-catalytic emissions control equipment would be included as part of the WTE.

Alternative 4 - Waste-to-Energy (WTE) Plant

Construction and operation of a geothermal energy facility at Davis Dome (McGregor Range Camp) in New Mexico, with a maximum generating capacity of 20 MW. Possible construction and use of a concentrating solar thermal (CST) system to support the geothermal resource. Alternative 5 – Geothermal Energy Facility

CSP systems, such as the parabolic trough, would cover approximately 300 acres in the South Training Area, with a maximum generating capacity of 50 MW. The CSP system would use a dry-cooling technology to conserve water. Alternative 6 –Dry-cooled Concentrating Solar Power (CSP) Technology

Alternative 7 - Implementation of Additional Renewable Energy Development within Future Compatible Net Zero Footprints Involves biomass, geothermal, wind, or solar resources in compatible footprints across the installation. Would allow Fort Bliss to use this EIS for future projects which fit within the scope of the environmental analysis. Additional projects would need to meet the alternatives screening criteria and environmental criteria presented in the DEIS.

Potential Impacts of Renewable Technologies

EIS Timeline Fort Bliss is in the middle of the NEPA process (Public DEIS Meetings). The Comment Period ends July 1, The Final EIS will be prepared after comments have been considered and anticipated to be published in August, A Record of Decision issued in October, 2013.

Questions?