ENGINEERING GEOLOGY OF THE CHANNEL TUNNEL Richard Rae & Robert Hazelhurst March 2006.

Slides:



Advertisements
Similar presentations
Basic Ground Penetrating Radar Theory
Advertisements

The tunnelling for the “Metro do Porto” By Alex Wilson & Frances Coker Singhateh.
Dublin Port Tunnel Xiaowei Jin, Xinni Wang, Mingqiu Mao.
A3 - dual carriageway link between London and Portsmouth 6.5km new road, 1.77km in bored tunnel £371 million Construction started January 2007 Project.
Measurement for Civil Engineering works
Mantas Enceris Athar Aziz
GROUND TREATMENT WORKS COMPENSATION GROUTING FARRINGDON STATION Client: CrossRail Main Contractor: BFK (Bam-Ferrovial-Kier JV) Site Location: Farringdon.
 Location – Maneri to Uttarkashi, India  Length – 8.56km long, diameter 4.75m  Use – a power tunnel, part of the hydro-electric project on the River.
CONSTRUCTION OF SOIL NAILING WALLS
Yellow River Diversion Project Use of Tunnel Boring Machines to Divert the Yellow River, China John Train & Philippa Reed.
Groundwater Control Affects design of: –Permanent Works –Temporary Works May affect viability of scheme Safety Issues –May cause instability of excavation.
Risk Management Department
DUBLIN PORT TUNNEL CONSTRUCTION CHRIS PAGE & THOMAS SMITH 19/03/2009 H24GGY GEOLOGY FOR CIVIL ENGINEERS Dublin Port Tunnel Project.
The Rock Cycle S E C T I O N
Rocks Sedimentary Rocks Introduction Limestone
Sedimentary rocks form from earlier rocks.
The Chunnel.
The Boulou Fault Zone Its Geology and its Impacts on the Perthus Tunnel project The Boulou Fault Zone Eastern Pyrenees, France Its Geology and its Impacts.
Northumberland Strait Crossing Confederation Bridge New Brunswick, Canada Will Astley Jonathan Richards.
Fossils. What are fossils? Fossils - the preserved remains or traces of animals, plants, and other organisms that lived long ago. When an organism dies,
Geological Problems Encountered and Solutions Implemented
Retsof Salt Mine Collapse Mark Ferguson Manos Adoniadis.
Overview One of the wonders of modern times Longest undersea section of tunnel in the world £12 Billion Cost 35 million passenger vehicles transported.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
The Marmaray Tunnel Project Bosphorus Strait, Turkey
Case Study: Christchurch Bay
Jo Beth Folger Site Conditions / Geotechnical October 12, Site Conditions and Geotechnical Data Presentation Outline.
Jo Beth Folger FAC CF Breakout - April 8, Site Conditions and Geotechnical Data Presentation Outline Site.
Energy Resources and Fossil Fuels
Task Force meeting #29, Lund, November Task 8 1 Some ideas for continuation of Task 8 Task 8 is intended to lead to:Task 8 is intended to lead to:
Geotechnical investigation and risk assessment at Budapest metro line 4 Dr. Tibor Horváth Geovil Ltd. INTERNATIONAL SOCIETY FOR SOIL MECHANICS AND.
Sanitary Engineering Lecture 16
TUNNELS.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
John Osborne GS/SE March 2013
Rock Chute Mike Cox State Conservation Engineer Contractor Certification Training March 2008.
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
Earth’s History Section 4.1
Earth Materials Dwellings
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
Department of Civil Engineering,
Ch 5: Earth’s Energy and Mineral Resources
Ch 5: Earth’s Energy and Mineral Resources
Weathering The process of wind or water breaking down rock into soil, sand and other tiny pieces 4 th 6 Weeks.
Main TBM Projects in Spain. MAIN TBM PROJECTS IN SPAIN Abdalajis Tunnels (9 Km) 2 TBMs Pajares Tunnels (25 Km) 5 TBMs Tunnel del Perthus (8 Km) San Pedro.
Activity from the Catastrophe unit © upd8 wikid, built by cracking science This page may have been changed from the original Catastrophe Damburst 1 Disaster.
To: Prime Minister Gladki From: Minister Brovko Catastrophe Performance task Tunnel SS1 from minister for transport The coast of this area is made.
Analyze the differences. Why they are so different? Rocky MountainsAppalachian Mountains.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Minerals, Rocks, and Soil
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
ROCK ON! Introduction to the world directly beneath our feet.
Formation of the American Southwest (including Nevada) Basin and Range Geology.
Dr. T.N.Singh Professor Rock Mechanics, Natural disaster, Climate change, Mining Research, Surface Mining.
FHI 32: FCC tunnel layout and transferline update Tuesday, 9 February 2016 CE Updates: Comparison of 100km Intersecting and Non-Intersecting options New.
The Leaning Tower of Pisa
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
Journal #13 What are 4 factors that affect the depth of a water table? What is the recharge zone of an aquifer?
Hoover Dam Construction. Geological Context Canyon’s tilted layers of andersite breccias Extrusive igneous rock Minerals - plagioclase, pyroxene & hornblende.
What’s so special about rocks ????? So why are rocks important?
DIAPHRAGM WALLS.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Dams and reservoirs Reservoirs Site selection Leakage from reservoirs
Teaching Aids Service by KRRC Information Section.
RISK ASSESSMENT FCC draft, 2. September 2015.
Tunnelling under lake Geneva
Dams and reservoirs Reservoirs Site selection Leakage from reservoirs
Layers of Earth.
Unit 3: Natural Resources
Presentation transcript:

ENGINEERING GEOLOGY OF THE CHANNEL TUNNEL Richard Rae & Robert Hazelhurst March 2006

Contents Geology beneath The English Channel Selecting the best location for a tunnel Successful tunnel construction ( )

ENGLAND FRANCE SECTION LINE

The Weald Sediment laid down when area was underwater Dome arose in Miocene period (~60m years ago) Dome weathered away over time

Tunnel Location Lower chalk layer –soft but stable – easy to excavate, but will stand up even without supporting walls –impermeable – comprises 80+% chalk, with some clay mixed in –depth and thickness of layer acceptable for a tunnel –layer continuous across whole width of channel Section through chalk layer beneath English Channel

Route Tunnel construction began in 1883 – abandoned for military reasons 1980’s – advanced oil techniques used 4000km of geophysical surveys 116 marine and 68 land boreholes Buried valleys presented major hazard – route had to stick to rock

Construction 8.2 m diameter TBM’s, met in middle English machines - 'open face' (faster) French - 'earth pressure balance'

Construction Tunnels are 51 Km in length, of which 37.5 Km is undersea 2400 tonnes/hour spoil = 4 million m 3 360,000 m² of land reclaimed TBM placed segmental concrete linings Gasket or grout to prevent water ingress 150 year design life

Problems Surveys only provided samples – in between unknown. e.g. aquiclude at crossover Water ingress caused TBM breakdowns on English side Poor ground conditions on French side But, generally highly successful - up to 426m per week – completed ahead of schedule

Thank you