Stormwater outfall watershed delineation, land cover characteristics, and recommended priorities for monitoring and mitigation in the City of Pacific Grove,

Slides:



Advertisements
Similar presentations
Simplified Sizing Tool for LID Practices in western Washington Alice Lancaster, PE Herrera Environmental Consultants.
Advertisements

Karst Initiatives/Storm Water Management in Berkeley County Brian Hopkins, Ph.D., P.E. Berkeley County Engineering Department.
Rain Gardens as Flood Control in Austin, Texas By Kiersten Dube.
DETERMINING LAND DEVELOPMENT EFFECT ON SURFACE RUNOFF USING GIS.
Fort Bragg Cantonment Area Background The USGS is working with the U.S. Army at Fort Bragg to develop a Storm Water Pollution Prevention Plan (SWP3). The.
1 Storm Water Management: Using GIS to Direct Non-Point Source Pollution Mitigation Efforts in the Eagleville Brook Watershed Jason Parent
Land Use Change and Its Effect on Water Quality: A Watershed Level BASINS-SWAT Model in West Georgia Gandhi Raj Bhattarai Diane Hite Upton Hatch Prepared.
Upper Brushy Creek Flood Study – Flood mapping and management Rainfall depths were derived using USGS SIR , Atlas of Depth Duration Frequency.
Reading: Applied Hydrology, Sec 15-1 to 15-5
Sustainable Stockton? Erosion and sedimentation into wetlands February 2008 Photos by Jamie Cromartie.
CURVE NO. DEVELOPMENT STEP 8 Soils data, land use data, watershed data, and CN lookup table are used to develop curve numbers for use in the SCS Curve.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
PrePro2004: Comparison with Standard Hydrologic Modeling Procedures Rebecca Riggs April 29, 2005.
Coastal Smart Growth s/index.htmhttp:// s/index.htm
Utilization of the SWAT Model and Remote Sensing to Demonstrate the Effects of Shrub Encroachment on a Small Watershed Jason Afinowicz Department of Biological.
Texas A&M University Department of Civil Engineering Cven689 – CE Applications of GIS Instructor: Dr. Francisco Olivera Logan Burton April 29, 2003 Application.
Urban Storm-Water Management Plan Utilizing Arc View and HEC-HMS College Station, Texas Kara Corcoran CVEN 689.
CEE 795 Water Resources Modeling and GIS Learning Objectives: List the essential data needed for water resource modeling Identify sources of water resources.
Fort Bragg Cantonment Area Cape Fear River Basin LIDAR data have been used to create digital contours and topographic maps. 1.A Digital Elevation Model.
Community-wide urban stormwater planning utilizing LiDAR, the WinSLAMM model and GIS Dan Murphy Rebecca Gronewold UNI GeoTREE Center April 4, 2013.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Water Management Planning An essential component of the MMP
Watershed Management Program Topographic Information Watershed Evaluation Watershed Management Plan Implementation of Best Management Practices Maintenance.
Eric Mohler GIS 582 Spring 2012  Morro Bay is a natural embayment located in San Luis Obispo County, California. A natural sandspit protects the harbor.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
ACWQ Austin Canopy & Water Quality Progress Report: Austin Tree-Canopy Resource, Phase II Spring 2012, Geography 4427, Texas State University April 2,
GIS data sources Data capture and compilation is very time consuming and costly Up to 80% cost of a GIS (Longley et al.) Primary Data – data captured specifically.
ODOT 2015 Geo-Environmental Conference
Development and Land Use Change: Central Potomac River Watershed
Presented by George Doubleday 1. What is The Woodlands Purpose of this Research Build and Calibrate Vflo TM model for The Woodlands Compare storms with.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Patapsco/Back River SWMM Model Part I - Hydrology Maryland Department of the Environment.
Mapping Tile Lines with Remote Sensing and GIS Jim Giglierano Formerly with Iowa DNR - Geological and Water Survey Iowa State University
Southeast Michigan Watersheds SEMCOG Office February 10, 2015 Detroit, MI Green Infrastructure Target Setting Pilot Project.
DIGITAL ELEVATION MODELING GEOG 421: DR. SHUNFU HU, SIUE Project One Steve Klaas Fall 2013.
Urban Water Research Todd Rasmussen Associate Professor of Hydrology The University of Georgia, Athens and Pending Director, Urban Water Research Institute.
Beach Contamination Source Identification Techniques: Physical Characteristics of the Beach and Surrounding Watershed Door County Soil and Water Conservation.
NHD Tools for the Evaluation of Watershed Condition and Management Performance Authors: William Cooter (presenter) Peter Ilieve. Tim Bondelid Mark Bruhn.
Oak Creek Village/ Butler Farms Stormwater Study Group July 27, 2006.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
Building an OpenNSPECT Database for Your Watershed Shan Burkhalter and Dave Eslinger National Oceanic and Atmospheric Administration (NOAA) Office for.
Introduction to GIS in Water Resources David R. Maidment Director, Center for Research in Water Resources University of Texas at Austin CRWR.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
LOCATION OF THE DAM ON KOSI RIVER USING GIS TECHNIQUES By Anil Kumar Hemant Singh Himanshu kashyap.
Modeling Stream Flow of Clear Creek Watershed-Emory River Basin Modeling Stream Flow of Clear Creek Watershed-Emory River Basin Presented by Divya Sharon.
K aren Worcester Staff Environmental Scientist with thanks to M. Thomas, D. Paradies, L. Harlan, and P. Meertens California Central Coast Regional Water.
PATRICK SEJKORA NOVEMBER 17, 2009 GIS IN WATER RESOURCES Yellowstone Fires and Their Hydrologic Effects.
Land Cover Classification and Monitoring Case Studies: Twin Cities Metropolitan Area –Multi-temporal Landsat Image Classification and Change Analysis –Impervious.
Mapping of soil moisture content by SWAT and GIS programming Yuri Kim Jessica Jahnke GEOG 593.
Sanitary Engineering Lecture 4
Storm Water Management Plan Lawrence County, PA Katelyn Zollos CE 549.
Modeling Source-water Contributions to Streamflow
Creating Land Use Datasets for Storm Water Reporting
Raster/Map Algebra/Hydrology
L-THIA Online and LID Larry Theller
National Hydro Data Programs
Watershed Analysis.
Campus Stormwater Management
Sacramento County Stormwater Quality Program
Data Sources for GIS in Water Resources by David R
GIS FOR HYDROLOGIC DATA DEVELOPMENT FOR DESIGN OF HIGHWAY DRAINAGE FACILITIES by Francisco Olivera and David Maidment Center for Research in Water Resources.
Hydrologic Analysis of the Hyrum Reservoir watershed
Regional Hydraulic Model for the City of Austin
Provo River Watershed Modeling with WMS Ryan Murdock.
Rio Blanco County, Colorado
Rainfall Runoff in the Guadalupe River Basin
Data Sources for GIS in Water Resources
Development of a Hydrologic Model for the Wichita Falls District
Prioritizing Watershed Protection in King County
Hydrologic modeling of Waller Creek
Sacramento County Stormwater Quality Program
Presentation transcript:

Stormwater outfall watershed delineation, land cover characteristics, and recommended priorities for monitoring and mitigation in the City of Pacific Grove, California Kathy Pugh Roger Arenas Patty Cubanski Michele Lanctot AJ Purdy Ryan Bassett Jacob Smith Shaelyn Hession Kyle Stoner Gabriela Alberola Natalie Jacuzzi Rose Ashbach Fred Watson Presentation by CSUMB class ENVS 660 to stormwater management staff from City of Pacific Grove, City of Monterey, Monterey Regional Storm Water Management Program, and Monterey Bay National Marine Sanctuary, 20 th Sep 2011.

Field Methods Located outfalls 10” diameter and greater Coordinates & measurements recorded Photographed Field validated GIS delineated watersheds

Delineation Methods Imported storm drain mains data and Digital Elevation Model Reclassified storm drain raster to be binary Subtracted reclassified storm drain raster from the DEM to create “burned” DEM. Imported storm drain outfall location data Hydrology Tools within Spatial Analyst Fill analysis Directional analysis Accumulation analysis Edited outfalls Watershed analysis

Watershed Boundaries

Land Use Land use data source: Monterey County Tax Assessor’s Office and City of Pacific Grove. Impervious cover data source: USGS, NLCD 2006 Impervious Cover

Watershed Characteristics

Potential Mitigation Treatment Wetlands Stormwater inflow Stormwater outflow Treatment Wetland Detention Pond Basic Schematic of Wetland SystemWatershed #8, Greenwood Park

Potential Mitigation Bioretention Image courtesy of Ole Christensen

Potential Mitigation Green concrete alternatives GCA 4-8” Natural Substrate Aggregate Base 1 (1-2”) Aggregate Base 2 (+6”) Surface Runoff Interception Direct Rainfall Interception

Next steps Prioritize delineated watersheds according to mitigation needs Collect data necessary for hydrologic modeling Precipitation local, high-resolution Outfall discharge Key outfalls Soil Characteristics Field verification Continued water quality monitoring Build and calibrate watershed model Greenwood Park given priority Assess mitigation measures feasibility using model simulations Restructure and reassess mitigation designs if needed Implement mitigation measures Continue monitoring

Conclusions/ Questions?