The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues.

Slides:



Advertisements
Similar presentations
Mountain Associates Reform of capital expenditure regulation Bruce Mountain Mountain Associates.
Advertisements

The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Meeting with consumers – No 2 30 January 2014.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Opex base-step-trend 8 May 2013.
Better Regulation workshop on Rate of Return Guidelines
New Investment John Howarth Executive Manager Energy Infrastructure VENCorp 2 April 2004 Conference on ACCC Draft Statement of Principles for the Regulation.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines General discussion of draft guidelines 2 September 2013.
22 August 2012 Regulating for productive efficiency – an assessment of the regulatory framework faced by Eskom Presented at the South African Economic.
AER’s Draft Decision for NSW distributors Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.
Benchmarking and efficiency mechanisms Stephen Clark - A/GM Connections & Development Transend Networks.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Interactions with incentive frameworks.
Better Regulation Expenditure Forecast Assessment Guideline 12 February 2013.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Expenditure assessment guideline and process 13 June 2013.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
1 Draft Statement of Regulatory Principles Consultation ‘Fostering a Stable Investment Environment’ Philip Gall, Manager/Regulatory Affairs TransGrid March.
Better Regulation workshop transmission outputs and environmental factors.
Presentation by AER’s Consumer Challenge Panel (CCP) sub-panel 7 David Prins and Robyn Robinson.
ACCC Forum on Draft Statement of Principles for Transmission Regulation – New Investment Roman Domanski Executive Director Energy Users Association of.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Meeting with FNQ consumers/stakeholders 15 January 2014.
Andrew Staniford Commercial Manager GETTING REGULATION BACK ON TRACK Sept 2003.
Better Regulation: Expenditure assessment and incentives 29 April 2013.
Australian Energy Regulator AER Preliminary decision for SA Power Networks 2015−20 Conference 13 May 2015.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER – Sebastian Roberts, General Manager Networks ◦Consumer challenge panel – Robyn.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Applications of Economic Benchmarking Techniques 6 June 2013.
Productivity-based Regulation: The New Zealand Experience Presentation to 8 th ACCC Regulatory Conference 26 July 2007 Denis Lawrence.
Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals December 2014.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
1 ElectraNet SA Draft Regulatory Principles Workshop Asset Base ( Strengthening Incentives for Investment) 2 April 2004 Draft Regulatory Principles Workshop.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦ AER – Chris Pattas, General Manager – Networks ◦ Consumer challenge panel – Ruth.
The Australian Energy Regulator Economic benchmarking TNSP outputs data.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Auditing requirements for RINs and economic benchmarking data 9 October 2013.
Better Regulation workshop distribution outputs and environmental factors.
Getting Ready! Potential issues for consumers Ergon Distribution Network Regulatory Proposal Bev Hughson, Consumer Challenge Panel (CCP) 2 September 2014.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Australian Energy Regulator Public Forum NSW electricity distribution revenue proposals July 2014.
The Australian Energy Regulator TasNetworks Public Forum Revenue Proposal 1 July 2014 to 30 June July 2014.
Total xoserve income £(a)m (ASA services – includes element for transporter funded changet) Transporter funded change budget built into service charge.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Frontier Economics Limited 150 Holborn London, EC1N 2NS The Frontier Economics Network Boston  Cologne  London  Melbourne
The Australian Energy Regulator Economic benchmarking DNSP outputs and environmental factors.
Getting Ready! Potential issues for consumers Queensland Distribution Network Regulatory Proposals Bev Hughson, Consumer Challenge Panel (CCP) 8 August.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Consumer/stakeholder forum – No 4 8 August 2014.
Proposed Consolidation of Albury and Victorian Access Arrangements 10 November 2015.
Demand Management Workshop Mark Wilson Adam Petersen 30 July 2015.
1 ACCC Workshop on the DRP Incentive Mechanisms and Benchmarking.
Public Forum 10 December 2014 SAPN Regulatory Proposal Bev Hughson Consumer Challenge Panel Member.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
15 October 2013 Briefing on draft s 56G report on the effectiveness of information disclosure regulation at Christchurch Airport.
Briefing for financial market analysts 30 April 2013 Draft report on the effectiveness of information disclosure regulation at Auckland Airport.
Economic regulation of electricity and gas network businesses Mark Feather, Acting Executive Director 23 November 2011.
Capex Regulation in Australian NEM NZ Commerce Commission workshop – March 2010.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
Economic Benchmarking vs Financial Incentives – an alternative to incentivising performance in the gas industry? Ashley Muldrew, Gas Speak 2015.
Australian Energy Regulator Public Forum Qld electricity distribution revenue proposals December 2014.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
Draft 2015 electricity distribution price-path reset Briefing for financial market analysts 4 July 2014 Sue Begg Commerce Commission.
Revised draft decision: Initial default price-quality paths for gas pipeline services Briefing for financial market analysts 24 October 2012.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Quality Framework Proposal
Proposed capital expenditure Categories
Overview What we are trying to achieve in regulatory area
LDZ System Charges – Structure Methodology 26 July 2010
Operating Expenditure
April High Holborn, WCIV6DA
Presentation transcript:

The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues

The aim of today’s presentation Inform stakeholders about the expenditure incentive guidelines and receive preliminary feedback 1. Measures for efficient capital expenditure (capex) ◦Ex ante measures  Capital expenditure sharing schemes  Whether to use actual or forecast depreciation to roll forward the RAB ◦Ex post measures  Statement on the efficiency of actual capex  Excluding capex from the RAB 2. Revisiting existing efficiency mechanisms for operating expenditure (opex)

Overarching objectives of the guidelines The expenditure incentive guidelines will cover a number of mechanisms and approaches that, taken together, should: 1.Incentivise electricity network service providers to undertake efficient capex and opex and balance incentives for cost reductions and service improvement 2.Safeguard consumers from paying prices that reflect inefficiently incurred capex 3.Provide for appropriate sharing of efficiency benefits between consumers and NSPs

Current incentives for efficient capex No formal sharing schemes currently apply to capex, but there are incentives for efficiency built into the regime: ◦NSPs can keep the benefit/bear the cost of an underspend/overspend during a regulatory period ◦consumers benefit/bear a share of the costs at the end of the regulatory period when expenditure is rolled into the RAB and new prices are set The current regime provides an average ‘incentive power’ of approximately 17 to 30 per cent, depending on the life of the asset Problems: 1.the incentives for capex may need to be strengthened as incentives decline throughout the regulatory period 2.the current arrangements may not provide sufficient protections for consumers

A capital expenditure sharing scheme (CESS) What is a CESS? ◦Provides incentives for NSPs to incur efficient levels of capital expenditure ◦Shares overspends/underspends between NSPs and their customers What do the rules say? ◦Requirements for a CESS are contained in clauses 6A.6.5.A (transmission) and 6.5.8A (distribution) ◦In developing any CESS the AER must take into consideration: – Principles: rewards and penalties to be commensurate with efficiencies and inefficiencies – The capital expenditure incentive objective (aligns with ex ante capex requirements – i.e. efficient and prudent)

How a CESS could address the issues Initial positions 1.A CESS should provide continuous incentives for capex 2.The penalty for overspending would be greater than 30 per cent, and the reward for underspending would be between 20 and 30 per cent 3.One CESS could apply for all NSPs 4.Sharing ratios would be included in the guidelines to provide greater certainty to NSPs

How a CESS could address the issues Continuity To address declining incentives, a CESS could be designed to provide continuous incentives over the regulatory period  i.e. the incentives would be the same in each year of the regulatory period Continuous incentives have the benefits of: 1.better aligning the incentives between opex and capex 2.providing NSPs with greater incentives to manage their capex programs on a continuous basis Submissions to the AEMC process tended to support a continuous CESS

How a CESS could address the issues Rewards for underspending In light of the existing regime, we consider that a range of 20 – 30 per cent for rewards is an appropriate starting point High rewards for underspending would have perverse outcomes: ◦NSPs might under-invest to the detriment of service levels ◦NSPs might capitalise opex and substitute between opex and capex due to differing incentives between the two classes of expenditure

How a CESS could address the issues Penalties for overspending For the penalty we believe that a higher incentive rate is justified (that is, greater than 30 per cent) Reasons why the penalty should be higher than the reward include: ◦NSPs should usually be able to spend within their allowances ◦We face asymmetries given the non-recurrent nature of capex in setting capital expenditure allowances, meaning that forecasts are likely to be biased upwards ◦The use of ex post revisions will be targeted and focussed ◦There are factors to prevent NSPs from uncontrollable or uncertain events

How a CESS could address the issues A ‘one size fits all’ approach Different schemes could apply to different NSPs based on ownership (government owned or privately owned) or type (DNSP or TNSP) State government owned NSPs might respond differently to financial incentives than do privately owned NSPs There are differences in the nature of capex for TNSPS and DNSPs ◦TNSP capex tends to be associated with larger projects and longer lead times, whereas DNSPs’ capex is usually composed of smaller programs of work We consider that these differences do not justify different schemes but are interested in your views

Key questions on the CESS Key questions Do stakeholders support our initial view that any CESS should support continuous incentives? Do stakeholders agree that the reward for underspending should be between 20 and 30 per cent? Do stakeholders agree that the penalty for overspending should be greater than 30 per cent? Do stakeholders agree with our initial position that one CESS should apply for all NSPs?

Current incentives for efficient opex NSPs are incentivised to undertake efficient levels of opex spending through an efficiency benefits sharing scheme (EBSS) ◦Under the EBSS overspends and underspends are carried forwards for 5 years As well as providing incentives for efficiency, the EBSS allows us to use actual opex in year 4 to set future opex allowances. The EBSS has only been in place for a limited time, but it appears to have worked well to date

Changes to opex incentives Why revisit the current incentives for opex? 1. Capex and opex are somewhat substitutable ◦ It is important to reassess the opex guidelines in light of the new capex incentives framework to limit any distortions 2. We are proposing changes to the opex forecasting methodology (through the expenditure forecast assessment guidelines) and this will change the role of the EBSS

Changes to opex incentives Opex incentives under benchmarking If we use a different approach other than revealed cost to forecast opex, the current EBSS will need to be modified. Under exogenous forecasting approaches, without an EBSS a NSP will have a very strong incentive to reduce its opex ( i.e. a marginal sharing ratio of 100:0) ◦But, there are a number of reasons to dilute the strength of this incentive: ◦ to share efficiencies between NSPs and customers ◦ to balance the incentives of efficiency against service standard improvements ◦ to share the impact of forecasting error between NSPs and customers

Changes to opex incentives Initial position Retain existing form of EBSS where revealed costs approach is used to forecast opex If revealed cost is not used, apply incentive mechanism that achieves similar outcomes as the current EBSS: –Symmetry –Continuity –30:70 sharing ratio

Key questions on opex incentives Key questions Do stakeholders support our initial position that the current form of EBSS should be retained where the revealed cost approach is used to forecast opex? Do stakeholders agree with our initial position that if revealed cost approach is not used, a 30:70 sharing ratio should apply?

Statement on the efficiency of capex What is the statement on the efficiency of capex? ◦An assessment of a NSP’s capex after it has been incurred ◦Outlined in clauses 6.A.14.2(b) (transmission) and (b) (distribution) What the review will address and how ◦Aims to address a pre-existing lack of regulatory scrutiny regarding capex before it is rolled into the RAB ◦The AER is explicitly allowed to preclude inefficient capex above a NSP’s allowance from entering the RAB ◦The review covers the last two years of the previous period and the first three years of current period

Statement on the efficiency of capex The review may be a staged process Stage 1: Actual performance Stage 2: Incentives Stage 3: Project management Stage 4: Detailed review of capex The AER may exclude inefficient capex Selected sample questions by stage Stage 1: How does the NSP’s actual capex compare to its ex ante capex allowance? Stage 2: Does the NSP have incentives to undertake only efficient capex? Stage 3: Does the NSP use appropriate asset management and planning tools? Stage 4: Engineers are engaged to assess a sample of the NSP’s projects to assess these for prudency and efficiency The NSP may be determined to be efficient at any stage in the process

Excluding capex from the RAB Capex exclusions from the RAB ◦Three categories of capex may be excluded from the regulatory asset base: 1.Inefficient overspends 2.Capitalised opex 3.Related party margins Inefficient overspends ◦This will draw on the conclusions of the ex post statement – there will be no double penalty between the CESS and capex removed from an ex-post review ◦While there are ex ante incentives for NSPs to spend within their allowances, some NSPs may not respond strongly to these incentives ◦Without the ability to review a NSPs actual capex, and exclude any inefficient capex from entering the RAB, consumers will bear the majority of the inefficient costs

Excluding capex from the RAB Key questions Do stakeholders agree with our initial positions on the ex post review process?