24 Sept '02Page 1 FANS-1/A Accommodation in an ATN Environment.

Slides:



Advertisements
Similar presentations
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Advertisements

FANS (Future Air Navigation System) Flight Crew Procedures
LINK2000+ Status Søren Dissing
Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines.
Rob Mead PETAL-II Trials Manager Eurocontrol, DIS/ATD
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Data-link Elements and Role of Stakeholders – Reflections of an ANSP
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001.
FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1,
24/25 September 2002ATN2002 (London)1 Delivering CNS/ATM Services to the Aircraft Presented by Forrest Colliver A discussion of the FANS/ATN accommodation.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
ATN/VDL Mode 2 Implementation Status
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
ATN 2002, London - 24 Sep 02 1 OPERATIONAL DATA LINK AT MAASTRICHT UAC P2L PETAL TO LINK Gustaaf Janssens Maastricht UAC Project Manager P2L.
IP-v6 Drivers for Aviation & Usage Concepts Terry L Davis Boeing Commercial Airplanes (Advisor to the North America IPv6 Task Force)
20 FLIGHT OPERATIONS TECHNOLOGY Innovations in flight FANS-1/A involvement and future Captain Joe Burns Director – Flight Operations Technology.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
Data Link Communications
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
Rob Mead PETAL-II Trials & Project Manager Eurocontrol, DIS/ATD
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
International Air Transport Association Transition to the new CNS/ATM ATN 2000, September 2000, London Günther Matschnigg IATA Vice President Operations.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
ACARS Media Management Prepared for DCIT #23 Systems Integration Working Group.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
10 Dec 15 COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada January 2016 AEEC IPS Update (Prepared by Luc Emberger, Greg Saccone)
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
Presented by Thales Avionics ATN 2003 London, UK September 2003
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
The Air Ground Datalink Server (AGDS)
ATN/VDL Mode 2 Implementation Status
FANS (Future Air Navigation System) Flight Crew Procedures
International Civil Aviation Organization
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
Ground System implication for ASAS implementation
Presented at ICAO ACP WG-I By Robin Hughes
15-19 Nov 2010 Rockville, MD – Lockheed Martin
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
DATA LINK IMPLEMENTATION IN EUROPE
Presentation transcript:

24 Sept '02Page 1 FANS-1/A Accommodation in an ATN Environment

24 Sept '02Page 2 Topics The Problem Progress to date Can It Work? What needs to be done next?

24 Sept '02Page 3 The Problem

24 Sept '02 Legend: CPDLC/ADS CPDLC Only CADS Planned or Trials ZNY Operational but not used ATS Datalink TodayATN ATN

24 Sept '02Page 5 Our Problem Goal: Harmonized procedures & systems - benefits air and ground Oceanic Air & Ground Systems, Procedures, Investments, Training Continental Air & Ground Systems, Procedures, Investments, Training Integrated FANS-1/A Non-integrated ATN

24 Sept '02Page 6 Oceanic Operations Domestic Operations Oceanic & Domestic Operations ATN   FANS-1/A   If you're implementing datalink, this is your problem Many believe the current ATN solution supports oceanic ops (it doesn't). This is delaying air and ground datalink deployments and benefits. A lot of people think you can do the far-right column (you can't).

24 Sept '02Page 7 Why Is It an ATS Provider Problem? If you are FANS ground system in remote airspace, you don't really have a problem –You also have no reason to implement ATN If you use only ATN: <1% of movements for 5+ years will be datalink equipped –5 years is a very optimistic date –This means there is virtually no ground business case –This means there is a serious controller training problem Or 'dual stack' and use FANS to leverage all parts

24 Sept '02Page 8 Is There Any Progress?

24 Sept '02Page 9 Ad Hoc Task Force Set-Up (IRRF) Airframe suppliers (Airbus, Boeing, DOD suppliers) Aircraft Operators –Air Canada, DOD, IATA, and Qantas (in attendance) –Active remote support, with written statements, from several others (UAL, CAL, DLH, etc.) ATS Authorities (LINK2000+, STNA France, Maastricht) Systems providers (ATNSI, Honeywell, Smiths, Thales) Datalink Service Providers (ARINC, SITA) FAA Regulation and Certification EUROCAE and RTCA

24 Sept '02Page 10 IRRF Work Plan Establish the context and assumptions (see next) Establish how to achieve use of FANS-1/A in domestic airspace (e.g. LINK2000+, Build 1A) –Catalogue issues preventing the above –Catalogue solutions (e.g. VDL2/AOA, FANS-1/A work-around, procedural change, FANS-1/A+, long-term upgrade) Lay issues across feasible implementation packages –Aircraft changes –Potential ground-based architectures Add potential aircraft numbers for the ground business case

24 Sept '02Page 11 Key IRRF Working Guidelines Safety assessment was known to be critical –We expect any results to be subjected to the same safety material as ATN Iif anything, it is more mature than ATN Operational acceptance is known to be critical –An essential premise of the designs –You need to verify this for your facility Options are provided; facilities need to select (or reject) We would be happy to work this with any ATS Provider True top-down approach –we took set requirements, and established how they could be met (or not). Controller transparency was an absolute pre- requisite

24 Sept '02Page 12 Issues Summary 42 issues from all known sources –NATCA, Maastricht, RTCA / EUROCAE, attendees –Anyone who cared to offer issues 25 issues removed because –Did not apply to European use (e.g. US transfer function) –No operational impact could be identified –They were shown to be parts of other problems No issues prevent use of non-profile messages –16 issues have resolutions which allow removal of voice readback for e.g. ACM, squawk, AMC) 1 issue preventing voice readback removal for all messages –avionics software change with no ATS application version management

24 Sept '02Page 13 Results 1: Short-Term FANS-1/A Upgrades (FANS-1/A+) –One essential functional change that would allow accommodation of FANS-1/A aircraft without voice readback for all Link2000+ operations Late message resolution and alerting –Other non-essential functional changes that could be included, to improve accommodation of FANS-1/A aircraft by resolving some additional issues –Allows FANS-1/A aircraft accommodation with transparency to the controllers –No changes required to existing FANS-1/A ground systems. –Acceptable impact on airborne systems

24 Sept '02Page 14 Results 2: Potential Long-Term FANS-1/A Upgrades Catalogue of essential & non-essential functional changes that would allow accommodation of FANS-1/A aircraft without voice readback and other mitigation means imposed by short-term package. Allows FANS-1/A aircraft accommodation with transparency to the controllers Version number change required, major impact on airborne systems No changes required to existing FANS-1/A ground systems electing to remain FANS-1/A. Change required if FANS-1/A ground systems elect to use the new functions

24 Sept '02Page 15 Results Summary ATC high density area ATN aircraft ATC low density area (oceanic, remote) FANS-1/A aircraft Compatibility with current FANS1/A ATC required FANS-1/A+ - avionics mod - no version change  a/c today, worldwide 20 aircraft, worldwide This is the ground business case It also forces convergence Requirements in change Accomodation gateway  FANS-1/A aircraft

24 Sept '02Page 16 Benefits Summary Accommodating FANS-1/A aircraft could, operationally –Provide 5 – 30% additional datalink-equipped movements –Remove a benefits ceiling of 70 – 95% –Provide experienced aircrew for xx% (30%+) of datalink movements Accommodating FANS-1/A aircraft could, management- wise –Increase the rate of benefits achieved –Increase the quantity of benefits though % of movements –Reduce controller training costs through increased familiarity –Increase quantity of benefits through increased usage –Reduce recurring controller training costs We are willing to look at specific centers

24 Sept '02Page 17 Does It Work?

24 Sept '02Page 18 It Works This is running todayUnvalidated alternative

24 Sept '02Page 19 Why Does It Work? Domestic and Oceanic Message Use NOTE: Pacific usage accumulated over an 18 month period Transfer of Voice Comms Flight Level Clearance Route Clearance Heading Clearance SSR Clearance ATC Mic Check Speed Clearance Vertical Rate Clearance ‘Time’ Clearance

24 Sept '02Page 20 Aircraft migrates? But Not All So We Solved Part of It … Initial ATNFANS1A+/PerfFANS1A/Perf VDL M2 ACARS M/S FANS1A/POA ACARS ATS facility ATN R ATN End System ATN FDPS HMI ATN FANS GATEWAY ATN Internet Certification Crew factors Ground factors ATN 2 ? FANS 2 ?

24 Sept '02Page 21 What Needs To Be Done Next?

24 Sept '02Page 22 Cover IRRF Caveats Business case, for all steps –Willing to establish specific aircraft numbers for European ATSPs When enough participants, standardize Reassess issues upon publication of SC189/WG53 domestic Safety and Performance Requirements –New issues? Resolutions still valid? etc. For LINK, final review by –Operational Focus Group –Safety Focus Group –Individual ATSPs Analyze the other ATN Baseline 1 airspace (USA domestic) IRRF could consider supporting all the above, if requested

24 Sept '02Page 23 But Beyond the Detail … ATC high density area ATN aircraft ATC low density area (oceanic, remote) FANS-1/A aircraft Compatibility with current FANS1/A ATC required FANS-1/A+ - avionics mod - no version change  a/c today, worldwide 20 aircraft, worldwide Requirements in change Accomodation gateway  FANS-1/A aircraft This is no light step We need one here

24 Sept '02Page 24 So, How About We … Recognize that there is a convergence problem –And it is as much a problem for ATN as for FANS Recognize that you can use FANS in ATN airspace –And that this is a good thing, not a tragedy Recognize that a significant step is being taken (FANS-1/A+) –Support it, so others can follow