Footer Text STATE HIGHWAY 45 SW Carlos Swonke, PG Director of Environmental Affairs TxDOT.

Slides:



Advertisements
Similar presentations
Responsible Use of Resources. Downtown Oak Hill TxDOTs Proposed Super Highway.
Advertisements

Credentials Bruce Melton, P.E. Texas A&M 1983 Diversified experience: Environmental, land development and hydrology Haynie & Kallman 1984: Land Development,
TxDOT Strategies for Phase II MS4 Stormwater Compliance
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
I-66 Corridor Improvements Outside the Beltway CTB Briefing
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Roger Williams Park Ponds Restoration Project. Project Update Concept Plans Developed for Structural and Non- Structural Best Management Practices Draft.
KELLY HART & HALLMAN LLP MATRIX OF LEGAL AUTHORITIES Home Rule Cities (Austin; Kyle) General Law Cities (Dripping Springs; Bee Caves; Rollingwood; Buda;
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Local Programs Update July 24, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
CALIFORNIA ASSOCIATION OF RESOURCE CONSERVATION DISTRICTS SHANNON SWEENEY, WATER RESOURCES MANAGER, CITY OF SANTA MARIA ANNE COATES, CACHUMA RESOURCE CONSERVATION.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Longmeadow Parkway Fox River Bridge Corridor
Improving Austin Streams Developing an implementation plan for four streams: Walnut Creek Waller Creek (abv. 15 th St) Spicewood Trib. To Shoal Crk Taylor.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Community Development Department DEVELOPMENTS OF REGIONAL IMPACT (DRIs) Summary.
West Texas Legislative Summit ENVIRONMENTAL ISSUES Environmental Regulations Affecting Transportation Carlos Swonke Director, Environmental Affairs Division.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Proposed DRAFT New City Ordinance for Water Use in Landscaped Areas Public Meeting September 15, 2009.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
2005 RWQPP Initiative Related Travis County Implementation.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Comprehensive Transportation Plan Burnet County Transportation Plan Overview Presented to Burnet Transportation Committee on June 18, 2008 by Brian.
Dallas County Area Transportation Projects Update Dallas County Commissioner John Wiley Price.
Edwards Aquifer Protection Program
DRAFT Proposed Adjustments to the FY SYIP, CTF and VDOT Budgets Laura Farmer Director, Financial Planning Division September 16, 2014.
Status Report of the Alamo Regional Mobility Authority October 25, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Wastewater Discharges to the Barton/Onion Creek Watersheds Barton Springs/Edwards Aquifer Conservation District.
Comprehensive Policy Plan Amendments Wekiva Parkway and Protection Act December 18, 2007 Comprehensive Policy Plan Amendments Wekiva Parkway and Protection.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Measure M2 Environmental Cleanup Allocation Program.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Board of County Commissioners October 14, 2008 Vinzant Landing Swallet Santa Fe River.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
Pre-Proposal Meeting January 16, 2008 US 95, Garwood to Sagle, Bonner County, Sagle KN US 95, SH-53 to Ohio Match Road, Kootenai County KN
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
RIVERSTONE CONNECTION STUDY Task Force Meeting #4 June 19, 2013.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
1 California Water Plan Update 2009 Assumptions and Estimates Report.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Four Winds Condominium Association August 2, 2017
City Council Meeting November 7, 2016
The Oakton Condominium Association September 12, 2017
Development Charge Public Meeting October 23, 2017
URBAN TRAIL PROJECT UPDATES
SHOAL CREEK WATERSHED ACTION PLAN Stakeholder Meeting: August 15, 2019
Stormwater Construction General Pemit (CGP) TXR150000
SHOAL CREEK WATERSHED ACTION PLAN
Presentation transcript:

Footer Text STATE HIGHWAY 45 SW Carlos Swonke, PG Director of Environmental Affairs TxDOT

Footer Text  Improve system connectivity  Improve local mobility  Provide an alternative route to congested local roadways  Improve travel times *SH45 is identified in the CAMPO 2035 Regional Transportation Plan as a four-lane divided tollway between Mopac and FM 1626 (location shown here) 2 SH 45 SW Project Purpose

Footer Text 3 Peak HourRoute CAMPO No Build Model CAMPO Build Model 2035 Projected Total Travel Time (minutes) AMSH 45 SW-Mopac-11.6 AMFM 1626-Brodie-Slaughter-Mopac PMMopac-SH 45 SW-10.4 PMMopac-Slaughter-Brodie-FM Travel Time Improvement (preliminary data) The estimated 2035 travel from FM 1626 at future SH 45 to Mopac, via Brodie Lane and Slaughter Lane, would be reduced from 38 minutes to 12 minutes, for a reduction of 26 minutes (during peak AM hours).

Footer Text 4  December 2013-Continuation of public outreach  December 2013-Biology and karst technical workgroup meeting  November 2013-Water quality/engineering technical workgroup meeting  December 2013 to present – analyses and report preparation, including additional karst survey  Reviewing and revising the preliminary Draft EIS  Preparing schematic-level design plans  Preparing for the next technical workgroup meeting – May Project Status Update

Footer Text  Draft EIS approval – June 2014  Anticipated Notice of Availability - June 2014  Anticipated Public Hearing – August 2014  Finalize schematic-level design plans  Complete Environmental Review– January 2015 (est.) 5 Next Steps

Footer Text  Texas Department of Transportation  Central Texas Regional Mobility Authority  City of Austin  Barton Springs/Edwards Aquifer Conservation District  Hays County  Travis County  US Fish and Wildlife Service  Texas Parks and Wildlife Department  Capital Metro  Texas Historical Commission 6 Lead and Participating Agencies

Footer Text 7 Karst / Biology Technical Workgroup Formed to provide input on karst and biology issues and survey methods Members: City of Austin Barton Springs/Edwards Aquifer Conservation District Hays County Travis County US Fish and Wildlife Service Texas Parks and Wildlife Department Texas Department of Transportation Central Texas Regional Mobility Authority

Footer Text 8 Water Quality / Engineering Workgroup Formed to identify Best Management Practices for construction, maintenance, and operation of SH 45SW. Members: City of Austin Barton Springs/Edwards Aquifer Conservation District Hays County Travis County Central Texas Regional Mobility Authority Texas Department of Transportation

Footer Text SH 45 to be constructed as a parkway –Access points only at either end (Mopac and FM 1626) and at Bliss Spiller Road –Restricts future development associated with the road Further restriction of future development near the road is limited by COA water quality protection lands Barton Springs/Edwards Aquifer Conservation District to review design plans Flint Ridge Cave –Footprint of the road would affect about 10% of the surface drainage area of the cave –Runoff from the roadway would be re-directed away from and out of the Flint Ridge Cave drainage basin. 9 Mitigation Measures

Footer Text Construction  Phased construction to limit area of disturbance  Robust system of temporary controls building upon TCEQ requirements  Aggressive maintenance and management  Early installation of permanent water quality features  Prevent natural drainage from outside the right-of-way from mixing with construction runoff  Treat all construction runoff prior to release  Independent on-site environmental inspector Operation/Maintenance  Permeable Friction Course (PFC) asphalt (reduces/slows runoff)  Sedimentation/filtration basins  Hazardous Materials traps  Vegetative filter strips  Grassy swales 10 Water Quality Protection Measures for SH 45 SW

Footer Text 11 Total Suspended Solids (TSS) Comparison (mg/l) Ability to Reduce TSS in Highway Runoff Background / UndevelopedHighway Runoff After application of water quality treatment measures (80% Removal) Danz Creek at SH 45 (upstream) (Barrett 1995) Average of various undeveloped watersheds in Austin (COA 2006) Danz Creek at SH 45 (downstream) (Barrett 1995) Nationwide study from urban highways (Driscoll et al 1990) / 28.4 Water Quality  With use of water quality treatment controls, pollutants in runoff from the roadway will be reduced to less than background levels.  Treatment levels for SH 45 SW are expected to exceed 90%

Footer Text For more information and future announcements… 12 Conclusion  –TxDOT Traffic Forecasting Methodology memo –Public Involvement summaries –Water quality information