Target Status Report Lara Howlett University of Sheffield.

Slides:



Advertisements
Similar presentations
1 MICE Target Status Chris Booth 3 rd March 2004.
Advertisements

MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
The MICE Target Lara Howlett University of Sheffield.
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
MICE Target Status Chris Booth 30 th March Chris BoothUniversity of Sheffield 2 The challenge ISIS beam shrinks from 73 mm to 55 mm radius during.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
April 27th, 2006 Paola Puppo – INFN Roma ILIAS Cryogenic payloads and cooling systems (towards a third generation interferometer) part II: the Vibration.
MICE Target Development Chris Booth Sheffield 8 th June 2006.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
Progress on Target Design Chris Booth Sheffield 14 th July 2004.
P J SmithUniversity of Sheffield1 MICE Target Electronics Paul J Smith University of Sheffield Fermilab 10 th June 2006.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
Target Specifications & History (to avoid reinventing a broken wheel!) 2 nd December 2009 Chris Booth The University of Sheffield.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
DESIGN AND OPERATIONAL EXPERIENCE OF THE MICE TARGET Target Drive The linear electromagnetic drive that has been designed to meet these requirements consists.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Target Design – Status and Plans Chris Booth Sheffield 12 th January 2005.
ISAT 303-Lab3-1  Measurement of Condition: Lab #3 (2005):  List of parameters of condition: –Linear distance, angular displacement, vibration, displacement,
MOTION CONTROL ISAT 303 Typically involves accurate control of distance, speed (angular velocity or both.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Chris BoothMICE-UK I.C. 16th January Useful meeting held at RAL last Thursday. Representatives of MICE, ISIS & others with Sheffield electronic &
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
1 MICE TARGET STATUS 23 rd February 2007 CM17 - CERN Paul J Smith University of Sheffield.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE Target Development Lara Howlett University of Sheffield.
Status of Target Design Chris Booth Sheffield 28 th October 2004.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
Rd07 Conference th June 2007 Florence, Italy 1 High frequency stepdown DC-DC converter with switched capacitors This work is part of the INFN DACEL.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
The Target Drive For The MICE Experiment Control and Infrastructure Optical Readout and Drive Electronics Target Drive A linear electromagnetic drive has.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Fan Assembly Driven by Magnetic Fields
Chris Booth Sheffield 29th March 2006
MICE Target Report Video Conference 29/11/07
CSU-1 Project Updates Mechanical:
INDUCTION MOTOR PROTECTION FOR SINGLE PHASING, OVERVOLTAGE AND OVER TEMPERATURE Submitted by:
Concepts and Requirements for GIMM Structures
Gingin Advisory Committee Meeting 08 Dec 2009
Status of Target Design
ECE 445 Senior Design, Spring 2018
ABOUT ME ….
Ola Ingemansson Electrical & Instrumentation Engineer
Presentation transcript:

Target Status Report Lara Howlett University of Sheffield

Lara Howlett – University of Sheffield Frascati, June 2005 Contents A look at the specs A look at the specs Reminder of Prototype plans Reminder of Prototype plans Meetings with ISIS engineers Meetings with ISIS engineers Testbeam plans Testbeam plans Status of electronics, readout and radiation studies Status of electronics, readout and radiation studies Plans / Timescale Plans / Timescale

Lara Howlett – University of Sheffield Frascati, June 2005 Updated Specs Frequency 1-3 Hz. Higher may be possible but we may be limited by heating Frequency 1-3 Hz. Higher may be possible but we may be limited by heating Target will dip into the beam by 5-10mm Target will dip into the beam by 5-10mm Only the intersection of the beam in the last 1ms is useful Only the intersection of the beam in the last 1ms is useful We wish to intersect as little beam that is not useful as possible We wish to intersect as little beam that is not useful as possible

Lara Howlett – University of Sheffield Frascati, June 2005 Updated Specs 4.4mm 2.05ms

Lara Howlett – University of Sheffield Frascati, June 2005 Updated Specs 7.4mm 2.75ms

Lara Howlett – University of Sheffield Frascati, June 2005 Updated specs 9.8mm 3.35ms

Lara Howlett – University of Sheffield Frascati, June 2005 Overview of Prototype The prototype is currently being built and is expected to be ready by the end of the month The prototype is currently being built and is expected to be ready by the end of the month The design consists of a a magnetic shuttle to which the target rod is attached The design consists of a a magnetic shuttle to which the target rod is attached This sits inside a series of coils which are driven in 3 phase This sits inside a series of coils which are driven in 3 phase

Lara Howlett – University of Sheffield Frascati, June 2005 Prototype ~8 cm

Lara Howlett – University of Sheffield Frascati, June 2005 Target Mechanism

Lara Howlett – University of Sheffield Frascati, June 2005 Meetings with ISIS Several very useful meetings have taken place with engineers from ISIS Several very useful meetings have taken place with engineers from ISIS These have been very useful for beginning to look at These have been very useful for beginning to look at –Safety issues –Vacuum issues –How the target mechanism will be mounted A first set of engineering drawings have also been produced by Stephanie Yang A first set of engineering drawings have also been produced by Stephanie Yang

Lara Howlett – University of Sheffield Frascati, June 2005 Outcomes The diaphragm springs will most likely be replaced by ceramic bearings The diaphragm springs will most likely be replaced by ceramic bearings The target will be mounted on a replacement for the current A frame to reduce vibrations transmitted to the beam pipe by the target The target will be mounted on a replacement for the current A frame to reduce vibrations transmitted to the beam pipe by the target The possibility of replacing the inductive measurement system with an optical system is under investigation The possibility of replacing the inductive measurement system with an optical system is under investigation The possibility of mounting the target using nested bellows with a gate valve which would allow the target to be completely removed from the beam in case of failure is being investigated The possibility of mounting the target using nested bellows with a gate valve which would allow the target to be completely removed from the beam in case of failure is being investigated

Lara Howlett – University of Sheffield Frascati, June 2005 Schematic

Lara Howlett – University of Sheffield Frascati, June 2005 Status of Electronics The electronics consists of two separate integrated circuits The electronics consists of two separate integrated circuits –Control logic –Current controller

Lara Howlett – University of Sheffield Frascati, June 2005 Control Logic Position Decoder/Switching Sequencer Optical Isolators Hex-Bridge Electronic 3 Phase Motor Switch (6 MOSFETS) Hall Switches (Position Sensors) ACTUATOR

Lara Howlett – University of Sheffield Frascati, June 2005 Current Controller Hex-Bridge Electronic 3 Phase Motor Switch (6 MOSFETS) Position Decoder/Switching Sequencer Active Current Control 19.5 kHz Current Transducer User Set Current (8- Bit Resolution)

Lara Howlett – University of Sheffield Frascati, June 2005 Future Plans To test this prototype circuitry with the actuator in order to ascertain its performance Development of a quadrature position sensing system (to replace the hall switches) – This will allow greater control of the switching due to improved position information. To develop an interface that will allow the electronics to be controlled via a PC

Lara Howlett – University of Sheffield Frascati, June 2005 Radiation Studies Simulations of radiation levels have continued Simulations of radiation levels have continued These now include the geometry of the target mechanism These now include the geometry of the target mechanism Radiation levels in the magnet are extremely high Radiation levels in the magnet are extremely high

Lara Howlett – University of Sheffield Frascati, June 2005 Radiation studies Units : Grays/year/ Unit Density

Lara Howlett – University of Sheffield Frascati, June 2005 Status of Readout Problems with the readout board were experienced which caused jumps in the counts which were read out Problems with the readout board were experienced which caused jumps in the counts which were read out After long correspondance with the company who provided the board, and returning the board for tests twice the problem has been resolved After long correspondance with the company who provided the board, and returning the board for tests twice the problem has been resolved The readout system will therefore be ready to be used with the new prototype when it arrives The readout system will therefore be ready to be used with the new prototype when it arrives Sheffield will have a summer student who will be working on this in the coming months Sheffield will have a summer student who will be working on this in the coming months

Lara Howlett – University of Sheffield Frascati, June 2005 Test Beam Plans There are plans to have the prototype ready for a test operation by December There are plans to have the prototype ready for a test operation by December This would involve intersecting a few ISIS beam pulses when the machine starts up in January This would involve intersecting a few ISIS beam pulses when the machine starts up in January Measurements from the scintillators of the Glasgow group will hopefully allow us to gain a better understanding of how far into the beam we need to go and how the beam profile changes with distance Measurements from the scintillators of the Glasgow group will hopefully allow us to gain a better understanding of how far into the beam we need to go and how the beam profile changes with distance

Lara Howlett – University of Sheffield Frascati, June 2005 Backup plans In parallel with the work described two ‘backup’ plans are being investigated in the background In parallel with the work described two ‘backup’ plans are being investigated in the background –The use of a lever to move the actuator away from the target –The use of a cam to provide the motion

Lara Howlett – University of Sheffield Frascati, June 2005 Lever Despite the hope that a lever would provide a mechanical advantage discussions with an engineer indicate that because of the low mass of the shuttle this is not possible Despite the hope that a lever would provide a mechanical advantage discussions with an engineer indicate that because of the low mass of the shuttle this is not possible However the use of a lever would give the advantage of moving the electronics and magnets away from the radiation if this is necessary However the use of a lever would give the advantage of moving the electronics and magnets away from the radiation if this is necessary The other advantage of this arrangement is that the target mechanism is isolated from the ISIS vacuum eliminating any possible problems of contamination The other advantage of this arrangement is that the target mechanism is isolated from the ISIS vacuum eliminating any possible problems of contamination

Lara Howlett – University of Sheffield Frascati, June 2005 Cam The idea of a cam has also been investigated in the background so that in the instance that the em design does not produce the accelerations required a backup plan is in place. This would be used in conjunction with a lever The idea of a cam has also been investigated in the background so that in the instance that the em design does not produce the accelerations required a backup plan is in place. This would be used in conjunction with a lever

Lara Howlett – University of Sheffield Frascati, June 2005 Plans Upcoming milestones: Upcoming milestones: –Prototype should be assembled and ready for tests to begin mid July –Prototype should be sufficiently tested to put in the beam by Christmas –Data from beam tests should be used as input for final design

Lara Howlett – University of Sheffield Frascati, June 2005 Conclusions Work towards the prototype is progressing and we expect to start tests in the coming weeks Work towards the prototype is progressing and we expect to start tests in the coming weeks Several successful meetings with ISIS engineers have taken place and these have been extremely useful in progressing with the design Several successful meetings with ISIS engineers have taken place and these have been extremely useful in progressing with the design Exactly how far we need to go into the beam has significant implications for the design, so we should pin this number down as much as we can Exactly how far we need to go into the beam has significant implications for the design, so we should pin this number down as much as we can