Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.

Slides:



Advertisements
Similar presentations
MICE Magnetic Investigation of T2 MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
Advertisements

MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
K. Long, 18 April, 2015 Beam-line status — red sky at night?
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Report Chris Booth (for target team) Sheffield 23 rd April 2009.
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
MICE Target Status Chris Booth 30 th March Chris BoothUniversity of Sheffield 2 The challenge ISIS beam shrinks from 73 mm to 55 mm radius during.
Target Status Report Lara Howlett University of Sheffield.
MICE MICE Target Status P J Smith CM 25 Wed 4 th November 2009.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
MICE Target Development Chris Booth Sheffield 8 th June 2006.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
Progress on Target Design Chris Booth Sheffield 14 th July 2004.
P J SmithUniversity of Sheffield1 MICE Target Electronics Paul J Smith University of Sheffield Fermilab 10 th June 2006.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
MICE TARGET WORKSHOP – SHEFFIELD 2 nd December Target vibration and general design issues 2. Simple Vibration - causes and forces. 3. Not so simple.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
Charging System Fundamentals
E2 Motors and Motor Starting
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Target Design – Status and Plans Chris Booth Sheffield 12 th January 2005.
Target Operation and Status Report Chris Booth for Target Team 13 th January 2009 Outline Current target performance Investigation of demonstrator failure.
MICE Target Mechanical Design l Jason Tarrant – STFC »Working on upgrade of Target Mechanics l Contents »Main features of upgrade design »Progress & schedule.
Electromagnetic Induction
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
Target Report Introduction Chris Booth Sheffield 20 th November 2008.
Chris BoothMICE-UK I.C. 16th January Useful meeting held at RAL last Thursday. Representatives of MICE, ISIS & others with Sheffield electronic &
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
MICE Target Development Lara Howlett University of Sheffield.
Status of Target Design Chris Booth Sheffield 28 th October 2004.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Contents »Shaft Bearing Redesign –Cross section shape –Anti-rotation device and location.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
DEMAS ENGINEERING SERVICES LIMITED. The Condition Based Monitoring maintenance Experts Our Vision To be the most sought after provider of high quality,
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Chris Booth Sheffield 29th March 2006
Stator Plan & Schedule Chris Booth 2nd March 2009
Target Installation Plan
P. J. Smith on behalf of the MICE target team.
MICE Target Report Video Conference 29/11/07
Status of Target Design
Presentation transcript:

Target Operation and Status Report Chris Booth for Target Team 20 th October 2008

Chris BoothUniversity of Sheffield 2 At June Collaboration Meeting: Target installed and running in ISIS. Stators rebuilt to address problems with electrical breakdown. Demonstration actuator (plus replacement) to be ready for July/August. Since then: Demonstrator actuator bearings failed after only few days continuous operation (1 Hz). Target in ISIS has continued to run successfully. Programme established to determine cause of failure and prevent recurrence, with increased engineering input.

Chris BoothUniversity of Sheffield 3 ISIS Target – mainly positive! Target operation in ISIS for beamline studies – >120K pulses have revealed no problems. Actuation & control have operated flawlessly – no target drops. Raising & lowering system works fine. Software (DAQ & monitoring) run well, allows remote monitoring. Target behaviour stable and reproducible. System operated by non-experts. Plans for enhanced control system, with computer interface, “on hold”. (Thesis, bearings, …!)

Chris BoothUniversity of Sheffield 4 Electrical Breakdown Issue All coils tested to 1 KV before assembly. Kapton insulation around coils. –Note! This also affects thermal behaviour! Assembled stators re-tested to 1 KV. Switching spikes measured – only 60V (on top of 220V supply). Capacitor bank & power supply split to provide ±110V – lower voltage to ground. Question: Is kapton between coils & cooling shims overkill? Should it be removed to lower temperature (and hence resistance)?? –Was original problem mechanical damage not punch through?

Heating increases resistance, reducing acceleration

Chris BoothUniversity of Sheffield 6 Demonstrator Target Problem Two new target drives delivered to RAL late July. One ran in R78 – failed after ~340K actuations. Serious damage to shaft & bearing surfaces. Significant abraded material, though little or none fell through lower bearing. Same stator had run with old shaft & bearings for >500K actuations in Sheffield without problem. Earlier shafts with DLC coatings ran >5M cycles. Unclear why failed setup was different. Weekly meetings Sheffield/RAL to try to identify cause of problem and best way forward.

Chris BoothUniversity of Sheffield 7 Possible failure causes Misalignment of bearings and shaft. Partial demagnetisation of permanent magnets causing non-axial forces. Distortion of coils causing non-axial forces. Poorer quality DLC coatings on shaft and/or bearings. Dynamic or static distortion of shaft. All the above are addressed in the following slides. Several experts from RAL, Sheffield Materials and outside companies (as well as MICE) have been consulted and provided valuable expertise.

Chris BoothUniversity of Sheffield 8 Tests of possible failure causes (1) Misalignment of bearings and shaft  Bearings have sharp edges. Misalignment of bearings would cause edges to cut into shaft. Metrology at RAL have checked both stators. Both are well aligned. Distortion of coils causing non-axial forces ? With improved electrical insulation, recent coils have looked less uniform. Craig MacWaters/Paul Smith are trying to map field inside stator with (low) DC current. Difficult job – high spatial precision needed. Will take time to complete. But this stator ran well with other shaft! Implies not likely to be a stator problem!

Chris BoothUniversity of Sheffield 9 Tests of possible failure causes (2) Partial demagnetisation of permanent magnets  Field at surface of sectored magnets measured in Sheffield. (Not easy, because of small scale!!) No sign of significant azimuthal asymmetry.

Chris BoothUniversity of Sheffield 10 Tests of possible failure causes (3) Poor Diamond-Like Carbon (DLC) coatings ? Discussions with coating company (TecVac), who have seen photos of failed parts. QC sample indicates adherence normal, but thickness 2-3 μm cf 5-6 μm normal. Could be surface contamination or inadequate polishing prior to coating – most likely explanation according to TecVac. Overall, this may be the most likely cause of failure. Sheffield surface expert: wire erosion damage causes poor adhesion. RAL metrology & Sheffield expert: may be better to have dissimilar materials in contact (not both DLC). DLC coated shaft plus nickel coated bearings may be better.

Chris BoothUniversity of Sheffield 11 Tests of possible failure causes (4) Distortion of shaft ? Static: Metrology will perform precise measurements, but shafts are NOT perfectly straight. Always true? (Ti not rigid enough.) Dynamic: Stephanie Yang/ Wing Lau modelling behaviour under acceleration. Andy obtaining high-speed camera to study present performance. Is Sheffield shock-absorbing mounting a significant difference? (Check: camera.)

Chris BoothUniversity of Sheffield 12 Way forward (1) Some things can be checked reasonably quickly. Others need a detailed study. Two likely problem areas are rigidity of shaft and surface coatings. Required alignment precision is not really known. We have 1 shaft (DLC coated, same batch as failure!) plus spare bearings (coated & uncoated). We have removed sharp edges from uncoated bearing set, and had them electropolished to remove erosion damage then electroless nickel plated – very hard, smooth bearing surface. Plan to run existing shaft + new bearing. Inspect frequently for any start of damage. Preliminary result in one – two weeks. In parallel, several engineering studies aimed at a more robust design.

Chris BoothUniversity of Sheffield 13 Way forward (2) Wing/Stephanie continue FE study of shaft – vibration modes, heat generation in bearings, etc. (Input from and verification with camera results.) Jason Tarrant considering: –Alternative coatings for present shaft and bearings. –Radically different shaft design to improve rigidity, ease of construction. –Shorter shaft, revised bearing positions. Paul Smith (with assistance from Jim Rochford & others) to do FEA study of coil/magnet system, to determine lateral forces as function of misalignments. Adam Dobbs examining effect of target orientation w.r.t. beam on beam loss. Andy – engineering schedule.

Chris BoothUniversity of Sheffield 14 Conclusion Target operation in ISIS shows actuation, control, infrastructure working correctly. Reproducibility of build & quality control (of coatings) are issues. Two-pronged approach adopted: –New bearing coatings to be tried very soon. –Expanded engineering support for target team. –Improved engineering rigour in revised design – mechanical and magnetic FEA etc. –Improved QA for production (electrical, magnetic, mechanical). New target to be tested prior to installation for 15 th January.