IPASI Collaboration High Power Targets Chris Densham & Patrick Hurh Targets Working Group Co-conveners 1.RaDIATE Collaboration 2.UK-PASI programme 3. Collaborative.

Slides:



Advertisements
Similar presentations
WG1: High Power Targets PASI 2013 Working Group Sessions Introduction Convened by: Dr. C. Densham (STFC/RAL), Mr. P. Hurh (FNAL)
Advertisements

UKHPT Proposal for continuation of generic high power target studies Rob Edgecock (Huddersfield & STFC) on behalf of the UK High Power Target Group (UKHPT)
RaDIATE Collaboration K. Ammigan, R.B. Jones et al. Proton Accelerators for Science and Innovation 2 nd Annual Meeting RAL, UK 19 May 2013.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Ottone Caretta & Chris Densham Technology Business Unit Rutherford Appleton Laboratory A new idea for NuFact targets and beam dumps BENE Nov 06 – Frascati,
PASI WP1 PASI meeting April 2013 WP1 progress report D.M.Jenkins.
RaDIATE 1 st Annual Collaboration Meeting May Cost-effective Irradiations Discussion Radiation Damage In Accelerator Target Environments.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Fluidised powder target research A potential target technology for both a Superbeam and a neutrino factory CJ Densham, O Caretta, P Loveridge STFC Rutherford.
Fluidised powder as a new target technology: COMMISSIONING OF A NEW RIG Work by Chris Densham, Peter Loveridge & Ottone Caretta (RAL), Tom Davies (Exeter.
Chris Densham RAL High Power Targets Group To be a ‘one-stop shop’ (P. Hurh) for target technology Enable optimum physics performance via sound engineering.
Solid Targets for the Neutrino Factory J R J Bennett Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK
Studies of solid high-power targets Goran Skoro University of Sheffield HPT Meeting May 01 – 02, 2008 Oxford, UK.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
R&D Studies on Solid Targets in the UK J. R. J. Bennett Rutherford Appleton Laboratory
Solid Target Studies in the UK Solid Target Studies in the UK Rob Edgecock On behalf of: J.Back, E.Bayham, R.Bennett, S.Brooks R.Brownsword, O.Caretta,
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
Target Options for a Neutrino Factory Chris Densham, Otto Caretta, Tristan Davenne, Mike Fitton, Peter Loveridge, Matt Rooney Sept. 20, 2011.
Outline agenda for 2 nd RaDIATE Collaboration Meeting (Draft 2) C. Densham P.Hurh.
RaDIATE Meeting February /21/14P. Hurh RaDIATE Feb 2014 Meeting 1.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
UKHPT Proposal for continuation of generic high power target studies Rob Edgecock (Huddersfield & STFC) on behalf of the UK High Power Target Group (UKHPT)
A powder jet target for a Neutrino Factory Ottone Caretta, Chris Densham (RAL), Tom Davies (Exeter University), Richard Woods (Gericke Ltd)
Proton Accelerators for Science and Innovation Workshop at Fermilab
1 Simulations of Tungsten Powder Experiment at HiRadMat CERN Tristan Davenne, Peter Loveridge, Joe O’Dell, Otto Caretta, Mike Fitton & Chris Densham (High.
Thermomechanical characterization of candidate materials for solid high power targets Goran Skoro, R. Bennett, R. Edgecock 6 November 2012 UKNF Target.
T2K Secondary Beamline – Status of RAL Contributions Chris Densham, Mike Fitton, Vishal Francis, Matt Rooney, Mike Woodward, Martin Baldwin, Dave Wark.
RaDIATE 1 st Annual Collaboration Meeting May Welcome and News & Notes Radiation Damage In Accelerator Target Environments.
Lessons learnt at 5 th High-Power Targetry Workshop Fermilab, May 2015 Federico Carra EN-MME ColUSM
RaDIATE Meeting December /13/12P. Hurh RaDIATE December 2012 Meeting 1.
1 Thermo-Mechanical Analysis of ISIS TS2 Spallation Target Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory 5th High Power Targetry.
“Materials for Fission & Fusion Power” Steve Roberts Sergei Dudarev CCFE George Smith Gordon Tatlock Liverpool Angus Wilkinson Patrick Grant Andrew Jones.
FETS*-HIPSTER** * Front End Test Stand **High Intensity Proton Source for Testing Effects of Radiation Chris Densham, Tristan Davenne, Alan Letchford (RAL),
HK Secondary Beam Issues Chris Densham STFC Rutherford Appleton Laboratory.
RaDIATE October Technical MeetingOctober BLIP Irradiation Planning Radiation Damage In Accelerator Target Environments.
RaDIATE March 2015 Admin Meeting P. Hurh Fermilab 20 March 2015.
UKNF 12 January 2005 Target Studies J R J Bennett RAL.
RaDIATE Meeting September /22/13P. Hurh RaDIATE July 2013 Meeting 1.
Tungsten Powder Jet Update Ottone Caretta STFC Rutherford Appleton Laboratory, UK 2 nd Princeton-Oxford High Power Target Meeting 6-7 November-2008.
RaDIATE Meeting July /22/13P. Hurh RaDIATE July 2013 Meeting 1.
Superbeam target work at RAL Work by: Ottone Caretta, Tristan Davenne, Peter Loveridge, Chris Densham, Mike Fitton, Matt Rooney (RAL) EURONu collaborators:
SPL-SB and NF Beam Window Studies Stress Analysis Matt Rooney, Tristan Davenne, Chris Densham March 2010.
RaDIATE Meeting February /20/13P. Hurh RaDIATE February 2013 Meeting 1.
RaDIATE Admin Meeting October /09/14P. Hurh RaDIATE Oct 2014 Admin Meeting 1.
RaDIATE Meeting March /20/13P. Hurh RaDIATE March 2013 Meeting 1.
High Intensity Beam Test of Beryllium for Target and Beam Window Applications Presented by: Brian Hartsell Contributors: Kavin Ammigan, Patrick Hurh NBI.
RaDIATE Meeting May /28/13P. Hurh RaDIATE May 2013 Meeting 1.
FETS-HIPSTER A High-Flux Proton Irradiation Facility Steve Roberts (University of Oxford) Chris Densham (RAL), Alan Letchford (RAL), Juergen Pozimski (Imperial.
Status of UK contribution to LBNF beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew.
HIGH POWER TARGETS AND MACHINE/DETECTOR INTERFACE WORKING GROUP SUMMARY REPORT PASI 2012 Workshop, 1/14/12 Co-conveners: C. Densham, P. Hurh, J. Thomas,
ESSnuSB Target Chris Densham, Tristan Davenne STFC Rutherford Appleton Laboratory 26 th May 2014.
Packed Bed Target Design Concept (for EURONu) Tristan Davenne, Ottone Caretta, Peter Loveridge, Chris Densham (RAL); Andrea Longhin, Marco Zito (CEA Saclay)
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
ORNL is managed by UT-Battelle for the US Department of Energy High Power Targets for Accelerator Based Research Facilities Bernard Riemer Spallation Neutron.
UK contribution to LBNF/DUNE beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew Atherton,
ENG/BENE, ENG Plenary, 16 March 2005 The New UK Programme for Shock Studies J R J Bennett RAL.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
HPT & M/D I WG DISCUSSION SLIDES PASI 2012 Hurh et al.
The Development of Fluidised Powder Target Technology for a Neutrino Factory, Muon Collider or Superbeam Chris Densham Ottone Caretta, Peter Loveridge.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
T2K Target status PASI Meeting Fermilab 11 th November Chris Densham STFC Rutherford Appleton Laboratory On behalf of the T2K beam collaboration.
Chris Densham Figures of Merit for target design for neutrons, neutrinos… Chris Densham Rutherford Appleton Laboratory.
Design and Optimisation of the ISIS TS1 Upgrade Target Dan Wilcox High Power Targets Group, RAL 6 th High Power Targetry Workshop, 12/04/2016.
Irradiated T2K Ti alloy materials test plans
UK Neutrino Factory Conceptual Design
Tungsten Powder Test at HiRadMat Scientific Motivation
Beam Window Studies for Superbeams
Beam Dump outline work plan (UK perspective)
EUROnu Beam Window Studies Stress and Cooling Analysis
SPL-SB and NF Beam Window Studies Stress Analysis
Presentation transcript:

iPASI Collaboration High Power Targets Chris Densham & Patrick Hurh Targets Working Group Co-conveners 1.RaDIATE Collaboration 2.UK-PASI programme 3. Collaborative activities between Fermilab/STFC

1.iPASI: RaDIATE Collaboration (as I understand it) iPASI (international) participants in RaDIATE and other PASI related Target Activities International Fermilab Brookhaven NL Pacific Northwest NL Oak Ridge NL Argonne NL Los Alamos NL FRIB/MSU CERN ESS (?) STFC/RAL ISIS High Power Targets Group Particle Physics Dept ASTeC PASI-UK PASI-UK Universities Sheffield Warwick Huddersfield UK materials community Oxford (MFFP Group) Manchester National Nuclear Lab Baznutec Ltd RaDIATE Collaboration (named on draft MoU)

New collaboration set up after 1 st PASI workshop (Proton Accelerators for Science & Innovation) at Fermilab, January MoU between Fermilab, BNL, Pacific Northwest NL, STFC, University of Oxford - just signed by DoE! More details in Kavin Ammigan and Barry Jones talk in WG1 Session 2

RaDIATE Objectives As proton accelerator particle sources (target facilities) become increasingly powerful, there is a pressing need to better understand and predict the radiation response of structural window and target materials. RaDIATE aims: Introduce materials scientists with expertise in radiation damage to accelerator targets community –recruit and develop new scientific and engineering experts who can cross the boundaries between these communities Generate new and useful materials data for application within the accelerator and fission/fusion communities; –co-ordinate in-beam experiments and post-irradiation examination Initiate, coordinate and exploit a continuing synergy between research in these currently disparate communities

Parameter space for consideration by Oxford RaDIATE materials programme Parameter Space for consideration by Oxford RaDIATE programme ('Whiteboard', Oxford, 20 Aug 2012) (revised 15 Nov 2012: P. Hurh, 16 Nov 2012: T. Davenne, 25 Jan 2013: K. Ammigan) MaterialApplication Facility (startup) Proton beam parameters Samples available (see IMT) Potential experiments/ studies Correlations/Anal ogues Topics of Interest Beryllium Beam windows (vacuum to air) LBNE (2020+) 700 kW; 120 GeV; ~1 Hz; σ rms = 1.3 mm mm thick miniBoone; 1999 NuMI Target Test, SP- 0 Target SEM Windows (FNAL); 2mm thick Be head sheets (CERN) Ion irradiation?, HiRadMat, EBSD?, TEM, APT studies, Micromechan ics Zr? (also HCP) - mechanistic insight Mechanical strength; Thermal conductivity; Fracture toughness; Cyclic thermal stress (+ stress waves); Max operating temperature?; Changes to E and α?; Creep fatigue lifetime; H2 and He embrittlement; Impurities effects on microstructure; Void swelling; Irradiation creep; Stress relaxation; Creep ductility; Irradiation growth; Preferred orientation and oxidation Targets LBNE kW, L = 950 mm, D = 15.3 mm (48 sections) 700 kW; 120 GeV; ~1 Hz; σ rms = 1.3 mm LBNE MW, L = 950 mm, D = 15.3 mm (48 sections) 2.3 MW; 120 GeV; 1 Hz; σ rms = 1.3 mm Graphite Targets LBNE: L = 950 mm, D = 15.3 mm (48 sections) 700 kW; 120 GeV; ~1 Hz; σ rms = 1.3 mm BLIP (180 MeV, 0.1 DPA) NuMI targets; ISIS muon targets? Tomography, Indentation, Microstructur al studies AGR graphite Thermal conductivity; Integrity; Gas production: pores, interfaces; Swelling/Voiding; Cyclic thermal stress (waves); Gamma-damage?; Optimum temperature?; Damage limits? T2K (2008 -) 750 kW; 30 GeV; 0.5 Hz Tungsten Targets ISIS (1980 -) 200 kW; 0.8 GeV; 50 Hz ISIS target (c.12 DPA); W from BLIP; Oxford? ISIS tungsten target for cutting & testing (SCK- CEN, Belgium) Judith shock loading tests Thermal conductivity; Integrity; Void swelling; H2/He embrittlement; Creep/Fatigue; Differentiate failure mechanisms; Impurity effects on embrittlement; Irradiation creep ESS (2020) 5 MW; 3 GeV; 15 Hz Mu2e (2020): L = 160 mm, D = 6 mm 8 kW; 8 GeV; 0.75 Hz; σ rms = 1 mm JRJ Bennett 'little wire' High-T He embrittlement?; Effects of microstructure changes?

RaDIATE news Monthly meetings (5 so far) DPA calculation incorporation into MARS –Necessary for all material studies Scoping study underway by NNL/Oxford (c/o Steve Roberts/Materials for Fission & Fusion Power Group) –Initial report on Beryllium on website (Colin English/Barry Jones/NNL) –Graphite report underway (Graham Hall/Manchester) ‘PASI’ Post-doc recruitment at Oxford awaiting full funding –To work on beryllium & beryllium alloys –Widely applicable for beam windows and low-Z targets –Interesting new research topic 6

RaDIATE news (continued) Graphite in-beam tests at BLIP/BNL University of Manchester now part of URA NNUF (National Nuclear User’s Facility) at Culham (Real news!) –To perform activated materials testing (micro-mechanical) –£5M equipment purchase underway –£10M earmarked next year Hope to include tungsten research in future (seek funding by ESS?) –Testing of unirradiated samples of ISIS tungsten targets at Oxford (MFFP) underway –Collaboration underway with SCK-CEN (Belgium) to perform materials tests on irradiated ISIS tungsten target –Samples would be passed to NNUF for micro-mechanical tests 7

Chris Densham Micro-mechanical testing 1um 3m3m 10  m 4m4m 3m3m Unique materials expertise at Oxford (MFFP Group) Micro-cantilevers machined by Focused Ion Beams Compression tests Tension tests Three Point Bend Cantilever bending

2. PASI-UK Programme (co-ordinator Rob Edgecock) WP1 – ‘Generic’ tools for high power target development and operation (c/o David Jenkins) –Task 1: Monitoring systems – structural, heat transfer, erosion/corrosion integrity + temperature –Task 2: Studies for high Z targets WP2 – ISIS upgrades (c/o Matt Fletcher) –Task 1: Improvements to TS1 target (up to 0.5 MW) -Task 2: ESS contributions -WP3 – Fluidised tungsten (c/o Chris Densham) –Flow rig development –Pulsed proton beam test at HiRadMat facility All topics covered in more detail in WG1 Session 3

PASI-UK community UK Universities Rob Edgecock, Cristian Bungau, Adriana Bungau (Huddersfield University) Ali Ahmed (Sheffield University) John Back (Warwick University) STFC/RAL Matt Fletcher, David Jenkins, Eamonn Quinn, Leslie Jones, Roger Bennett (ISIS) Stephen Brooks (ASTeC) Chris Densham, Tristan Davenne, Mike Fitton, Peter Loveridge, Otto Caretta, Dan Wilcox (HPTG)

ISIS/PASI Target collaboration Image: Target Station 2 10 Hz operation 32 kW power Solid tungsten rod target Water cooled

ISIS/PASI Target collaboration Target Station 1 40 Hz operation 128 kW power Tungsten plate target Image: WP2 Objective: More neutrons from TS1! Target Station 2 10 Hz operation 32 kW power Solid tungsten rod target Water cooled

PASI-UK: Learning the limits of solid tungsten targets TS-2 Mk1 HIP Beam on Beam off Beam on

PASI-UK: generic (tungsten) test equipment in preparation 1.High pressure water erosion test rig – components delivered (Tristan Davenne/Otto Caretta) 2.10 kW, 400 kHz induction heater power supply delivered e.g. for Mu2e or ISIS target testing (Tristan Davenne) Buffer tank Tantalum coated tungsten sample Impinging water jet Pump UV steriliser Water flow meter filter nozzle Chilled water circuit Thermostatic control valve Jet diameter < 10mm Water velocity: 1-50m/s Steady-State Von-Mises Stress Field Tension Compre ssion 3.PSU purchased for high temperature tungsten fatigue (Peter Loveridge, Roger Bennett, Ali Ahmad)

PASI-UK WP3: Fluidised tungsten powder technology Potential solution for applications requiring highest pulsed beam powers e.g. Neutrino Factory New technology demonstrated off-line at RAL In-beam experiment on powder sample carried out at CERN –First experiment to be carried out at new HiRadMat test facility in May 2012 –Collaboration with Ilias Efthymiopoulos, Nikolaos Charitonidis (CERN) 2 nd experiment planned after long LHC shutdown

1 st experiment at HiRadMat, CERN (May 2012) Trough photographed after the experiment. Note: powder disruption Shot #8, 1.75e11 protons Note: nice uniform lift Shot #9, 1.85e11 protons Note: filaments! Lift height correlates with deposited energy

3. Collaborations between Fermilab and STFC/RAL 2.1 st NOvA (ME) target for 700 kW beam 3.2 nd NOvA target under manufacture 5.Be window experiment proposal for HiRadMat 4.Mu2e target design, development & materials testing under way 1.LBNE & NuMI (LE) target studies & prototyping