ATLAS at Christmas 2014 LHC Analysis and Physics R+D and Upgrade Max Klein - for the dauntless ATLAS Group - Liverpool 12.12.2014.

Slides:



Advertisements
Similar presentations
Development of super module structures at Glasgow Calum I. Torrie 20 th April 2007.
Advertisements

ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Steve McMahon RAL Towards Phase II tracking at ATLAS
ATLAS Module building at Glasgow
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
ATLAS Tracker Group PPD Staff Talk 28/Nov/ ATLAS SCT Builders Inc Annual Report Mike Tyndel (Group leader & SCT Project Leader) –Richard Apsimon.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Medipix sensors included in MP wafers 2 To achieve good spatial resolution through efficient charge collection: Produced by Micron Semiconductor on n-in-p.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
The ATLAS SemiConductor Tracker Abstract The ATLAS SemiConductor Tracker (SCT) is presented. About silicon micro-strip sensors with a total active.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
WP4 – Plans for next 6 months
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
ATLAS UK Tracker Upgrade AIDA-2020 Transnational Access Facility
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
Liverpool in ATLAS and ATLAS Upgrade Liverpool in ATLAS and ATLAS Upgrade Phil Allport (Liverpool Semiconductor Detector Centre and ATLAS Upgrade) 28/4/14.
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
Sergio Díez Cornell, Berkeley Lab (USA),
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
VELO upgrade news 19 January VELO Upgrade Survey  Not yet filled in, but last answers arriving in the next 24 hours....!  Hope to soon appoint.
UK Participation in phase-II tracker upgrade o Brief Overview of R&D work to date1 slide o Scope of Interest of UK institutes2 slides o Task list & Institute.
Liverpool High Energy Physics Phil Allport 18 th RD50 Workshop 23 rd to 25 th May 2011 WELCOME.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
ATLAS-UK Tracker Upgrade OverviewR.Nickerson Programme StatusI.Wilmut [hat 2] WP2Peter Phillips WP3Bart Hommels WP4Tim Jones WP5Craig Buttar [hat 3] B180Todd.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Page 1 Liverpool January 11th, 2012 LHCb Upgrade Meeting Planar Silicon Detectors I. Tsurin Generic sensor R&D ATLAS-oriented commitments LHCb-oriented.
EC: 7 DISK concept Preliminary considerations
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
SVT – SuperB Workshop – Annecy March 2010
Detector building Notes of our discussion
+ Steve Worm (since Monday)
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Hybrid Pixel R&D and Interconnect Technologies
Mechanics: (Tim).
ITK Strip Module Meeting; 12st October 2015
Constructional requirements from ITk-Strips
WP4 – Plans for next 6 months
Database requirements from ITk-Strips for DAQ loads
Work packages status in Torino and perspectives
Tracker Outer Barrel Silicon
Setup for testing LHCb Inner Tracker Modules
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Updates on the Silicon Tracker 2S Module
Presentation transcript:

ATLAS at Christmas 2014 LHC Analysis and Physics R+D and Upgrade Max Klein - for the dauntless ATLAS Group - Liverpool

new

Leading Roles Liverpool ATLAS in 2014 A Affolder: Strip Tracker Upgrade Convenor, Upgrade (and UK) Strip Module Convenor P Allport: Upgrade Coordinator, Executive Board S Burdin: UK Upgrade Pixel Module Deputy Convenor G Casse: Upgrade Sensor Procurement Group P Dervan: UK Irradiation Coordination M D'Onofrio: SUSY and now Physics Modelling Group Convenor C Gwilliam: Physics Validation Convenor H Hayward: Upgrade Tracker Simulation Convenor, UK Super-symmetry & Exotics Convenor T Jones: Strip Module Mechanical Support Convenor, UK Upgrade Strip Stave Assembly Convenor M Klein: Team Leader, Collaboration Board U Klein: Advisory Board to Chair of the Collaboration Board, LPCC Contact J Kretzschmar: W,Z Working Group Convenor, Standard Model Working Group Convenor P Laycock: Analysis Software Group Convenor, Data Preparation Coordinator A Mehta: Heavy Quark Higgs Group Convenor, Analysis Release Coordinator J Vossebeld: UK Silicon Tracker Project Leader A.Greenall Hybrid electronis I Tsurin Chip and electronics design in 2016 the group will have 4 PhD students and no postdoc

What is leadership? And who can score alone?

ATLAS Hardware

ITk in next 10 years : The BIG picture ITk-IDR APR-OCT YR= ITk-Kick off EB Approval CB Endorse ITk Commission on Surface 2023 Strips TDR Pixel TDR UCG, LHCC, Strip-MOU, RRB Preproduction 3-4 Year Strip Production UCG, LHCC, Pixel-MOU, RRB Integration PIXEL STRIP CB= collaboration board, EB=executive board, IMOU=interim memorandum of understanding, UCG=upgrade cost group, RRB= Resources review board, IDR=initial design review (internal), TDR=technical design report (external) 2-3 Years Pixel Production Preproduction Re-cost ITk 6 S. McMahon : IDR Schedule Cost and Organisation

Reference Layout of the new Si Tracker Four major considerations will lead to new layout: (Helen co-coordinator of the layout simulation) Physics: Extension to larger rapidity for VBF Higgs Pile-up: Reconstruction efficiency Services: Rings instead of Disks Cost: Review in October 2015 Tentatively the UK does: half the barrel strips (128SS+108LS staves = 6136 modules total) one pixel end cap (1250 modules in 25 rings) Liverpool: the leading centre

Pixel - Mechanics Petal design studies. Manufacturing and thermal difficulties lead to ring design Presently: CAD modelling of ring layout, engineering of rings and end-cap support S.Burdin, T.Jones, P.Dervan, H.Hayward, N.Readioff, P.Sutcliffe, Workshop

Pixel Sensors Bias to almost 1kV; New p type Si radiation studies up to n/cm 2 and 1 Grad Thinner sensor superior at high dose (classic e gain is 20k electrons) 4x4cm sensors (n-in-p) 150mm diameter Geometry variations for FE-14 r/o ASIC Mask sets for high voltage performance, reduced edges, various sensor thickness, pixel sizes and assemblies. Beam tests Affolder, Burdin, Carrol, Casse, Dervan, Forsaw, Milovanovic, Tsurin, Wormald

Pixel Test Beam Results Succesful beam test of CPV, first with punch though bias. Stable to -40C, dedicated coolbox. Promising noise performance with AC readout. Efficiency Restored with few 100 V bias after irradiation Burdin, Casse, Dervan Forshaw, Milanovic, Tsurin, Wonsak, Workshop

Strip Sensors n-in-p baseline technology 4 rows of 2.4cm long strips with pitch of 74.5μm Adapted to new 256 ABC130 ASIC Hamamatsu but need 190m 2 - e2v (too low break down voltage) - Infineon? 8” 300μm ? Strips expected to get n/cm 2, i.e. an order of magnitude less than pixels Affolder, Allport, Casse, Dervan, Tsurin, LDSC

Strip Hybrids, Modules, Staves All designs for the hybrids, modules and tooling for barrel and end-cap are Liverpool’s! Kapton multi-layer hybrid glued to sensor, 8 circuits laminated to rigid FG4 carrier 1*10 columns; Powering DC-DC; 4-row bonding demonstrated to be feasible… Affolder, Caroll, Greenall, Jones, Powell, Sutcliffe, Whitley, Wormald, Workshop old 2*10 250nm hybrid

Future Involvement in Si Tracker Upgrade *) Physics Programme Detector and Layout Simulation Strips: Sensor QA, Hybrid and Module Assembly, Stave Core Assembly, Module-to-Stave Assembly Pixels: Sensor QA, Hybrid QA, Module Assembly Carbon Fibre Shells, Assembly of Rings and one End Cap The whole Liverpool Silicon team, its base and the so-called academics *) Coseners house and RG 2015, yet: subject to intra- and international negotiations and developments

backup

Mechanics & Macro Assembly Pixel Detector TASKDescriptionInstitutes 3.1aSensor procurementLiverpool 3.1Sensor QALiverpool, 3.2ASIC QAGlasgow, RAL 3.3Hybrid QALiverpool 3.4aModule assembly managementGlasgow 3.4Module Assembly & QAGlasgow, Liverpool, Manchester/Edinburgh, Oxford 3.53-D Sensor & ModuleManchester TASKDescriptionInstitutes 6.1Ring Manufacture and QA: 6.1b On-disk tapesEdinburgh 6.1c EoS cardsEdinburgh/Manchester 6.1d Carbon Fibre shellsLiverpool 6.1e Foam cutting, ring assembly, QAManchester 6.1f Cooling loop fabricationLancaster, Sheffield 6.2Module Mounting, QARAL, Glasgow 6.3Superstructure procurement, QAQMUL,Liverpool 6.4Type-I service assembliesEdinburgh, Sheffield, Lancaster 6.5Assembly of rings into endcap superstructures, QA Liverpool, Sheffield, QMUL 6.6Delivery of assembled endcap to CERNLiverpool Institute Involvement Module Production 15

Strip Detector TASK Description Institutes 2.1 Sensor QA Cambridge, QMUL, Lancaster, Sheffield, Oxford 2.2 ASIC QA RAL, Glasgow 2.3 Hybrid Assembly and QA Birmingham, Liverpool 2.4 Module Assembly and QA Liverpool, Cambridge, Glasgow, Sheffield, B’ham, Oxford, RAL, Lancaster(QA) TASKDescriptionInstitutes 4.1Raw Materials Batch TestingLiverpool, Sheffield, (+RAL TD?) 4.2Bus-tape testing & co-curingOxford + Liverpool 4.3Cooling pipe manufactureLancaster, Sheffield 4.4Stave Frame ProductionQMUL, Lancaster 4.5Stave core assemblyLiverpool & Oxford 4.6Stave core QALiverpool, Oxford, Sheffield & QMUL TASKDescriptionInstitutes 5.1Module Reception TestingRAL 5.2Stave Core Reception TestingRAL 5.3EoS reception & QAOxford, RAL 5.4Module MountingRAL 5.5Wire bondingRAL 5.6Stave electrical QARAL 5.7Reliability testingRAL, Oxford Module Assembly & QA Stave Core Assembly Module Mounting and QA

17 TASKDescriptionInstitutes 7.2 Barrel support structure component manufacture RAL, Liverpool, Oxford 7.3Type I service module manufactureRAL, Oxford, Sheffield, Lancaster 7.4Stave installation toolingOxford 7.5Cooling connection toolingSheffield Mechanics & Services 17 TASKDescriptionInstitutes 8.2DAQSheffield, Oxford, RAL;UCL 8.3Powering including power boardsRAL 8.4System MaintenanceUCL 8.5Irradiation ProgrammeSheffield, Birmingham, Liverpool Power and DAQ Strip Detector