© Copyright 3Dlabs 2004 Page 1 Super Buffers Workgroup Status update, June 2004.

Slides:



Advertisements
Similar presentations
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Advertisements

Doc.: IEEE /0227r0 Submission March 2010 Adrian Stephens, Intel CorporationSlide 1 Adrian Stephens nominee statement for Working Group.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: IEEE Down Selection Process Date Submitted: January 18, 2005.
© Copyright 3Dlabs 2004 Page 1 ARB Roadmap Discussion Sacramento, June 2004.
Doc.: IEEE /0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
© Copyright Khronos Group, Page 1 ARB Update June 2002.
Final Report on Improvements to the RAA Steve Metalitz 5 December 2010.
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #18, London Closing Plenary Date Submitted: January, 2007 Presented.
Status of Collaborative Team work on H.IDscheme, H.ID-RA and H.IRP Chiaki Ishikawa (TTC)
Credit Work Group Update April 4, General  Credit Work Group met on Friday, March 7  Received Ethics Training from ERCOT Legal staff  Reviewed.
© Copyright 3Dlabs 2004 Page 1 Super Buffers Workgroup Status update, December 2004.
© 2013 IBM Corporation OSLC WG Transition **DRAFT** Plan 8 April 2013 Open Services for Lifecycle Collaboration Lifecycle integration inspired by the web.
Learning Objects Metadata IEEE P Learning Technology Standards Committee London, UK March 16, 2000 Chair: Wayne Hodgins.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #17, Dallas Closing Plenary Date Submitted: November, 2006 Presented.
HIT Policy Committee Information Exchange Workgroup Micky Tripathi, Massachusetts eHealth Collaborative, Chair David Lansky, Pacific Business Group on.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group February, 2012 Irvine, CA PWG F2F.
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2010 Lexington, KY PWG F2F Meeting.
Chesapeake Bay TMDL 2017 Midpoint Assessment: A Critical Path Forward Lucinda Power EPA Chesapeake Bay Program Office Citizens Advisory Committee Meeting.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Reusable Launch Vehicle Working Group Commercial Space Transportation Advisory Committee Presented to COMSTAC Meeting George Whitesides, RLVWG Chairman.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Page 1 Future Strategy and Work Plan IESBA CAG Meeting September 11, 2013 New York Ken Siong, IESBA Technical Director.
MSG Direction Needed for 2016 Timeline January 20 th 2016.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
Work Prioritization Model (WPM) Team Status Update Olga Cavalli Chair – WPM Team 10 March 2010 Presented to: GNSO Council.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #20, Montreal Closing Plenary Date Submitted: May, 2007 Presented.
WG Status Report Masayuki Ariyoshi – WG Chair IEEE DySPAN Standards Committee General Meeting December 2011 Scottsdale, AZ.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August, 2010 Bagsværd, DenmarkPWG F2F Meeting.
Doc.: IEEE /263r0 Submission José A. Gutierrez July-2002 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Page 1Wireless World Research Forum (WWRF) September 18, 2001.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Melbourne Closing Plenary Date Submitted: September, 2006 Presented at.
Metadata Working Group Charter Update Jennifer Carlino, Acting Chair FGDC OS/USGS June 13, 2012 Coordination Group Meeting.
Discussion points for 2 nd Interop Event Group Name: TST WG Source: Keebum Kim, TTA, Meeting Date: TP#22.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
Draft for discussion1 OSLC PLM roadmap discussion Aug 30 th 2011 Rainer Ersch Gray Bachelor V0.4 updated at meeting Aug 30th.
Work Prioritization Model (WPM) Team Status Update Olga Cavalli Chair – WPM Team ?? March 2010 Presented to: GNSO Council.
COMET Working Group Progress Report 11/13/03
NR workload management
IEEE TGv March 2010 Agenda Date: Authors: March 2010
Closing (and Final) Report to 802 EC Friday July 22, 2011
IEEE WG Closing Report – July 2006
IEEE 1914 NGFI IEEE RoE TF Opening Report
Work Plan for IEEE m Standard & IMT-Advanced Submission
Sub-1 GHz Study Group Closing Report Sept 2018
IEEE WG Closing Report – July 2006
Submission Title: [ e Closing Report for November 2015 Session]
July 2014 doc.: IEEE /25/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
TGn Editor – Adrian Stephens
Adrian Stephens nominee statement for Working Group Vice Chair
<month year> doc.: IEEE < e> <March 2018>
<month year> doc.: IEEE < e> <January 2018>
July 2014 doc.: IEEE /17/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
TGn Closing Report Vancouver, BC, Canada 802 Plenary
<month year> doc.: IEEE < e> <January 2019>
Next Steps Advisory group debrief call Circulate meeting summary
IEEE MEDIA INDEPENDENT HANDOVER DCN:
<month year> doc.: IEEE < e> <January 2018>
IEEE TGaf DRAFT Meeting Plan and Agenda
802.11F Meeting Report May 2001 Month 1998 doc.: IEEE /xxx
TGn Closing Report Vancouver, BC, Canada 802 Plenary
<month year> doc.: IEEE < e> <March 2018>
Adult Education Survey mandate of the TF AES
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4t (Higher Rate) Opening.
Predicting timelines: the track record
Spec Framework Decision Process Alternatives
Presentation transcript:

© Copyright 3Dlabs 2004 Page 1 Super Buffers Workgroup Status update, June 2004

© Copyright 3Dlabs 2004 Page 2 March 2004 – Workgroup reset Too large of a scope Render-to-texture, render-to-vertex-array, buffer swaps, memory objects, sub mems, validation Could not get agreement in workgroup Competing proposal by NVIDIA / APPLE / 3Dlabs submitted EXT_render_target with focus on render-to-texture functionality

© Copyright 3Dlabs 2004 Page 3 March Results Narrower focus for workgroup Render-to-texture first, render-to-vertex array second Uber Buffers Lite spec from ATI and Render Target new basis for WG Workgroup chair and spec editor not from the same company Jon Leech interim chair Should be policy for all workgroups

© Copyright 3Dlabs 2004 Page 4 April 2004 Both Uber Buffers Lite and Render Target specifications refined Vote called to pick one to move forward Vote resulted in a DRAW UBL: SGI, ATI, Intel RT: IBM, NVIDIA, APPLE Abstain: 3Dlabs Other (7)

© Copyright 3Dlabs 2004 Page 5 May 2004 Lots of discussion on how to move forward Third spec proposed: EXT_Compromise_Buffers Addressing key criticim against both UBL and RT One Contentious key issue identified that set RT and UBL / CB apart RT: indirect handles UBL and CB: Direct handles Vote called on direct vs indirect handles Vote resulted in favor of direct handles (5 against 2) Direct handles: 3Dlabs, ATI, IBM, Intel, SGI Indirect handles: NVIDIA, APPLE

© Copyright 3Dlabs 2004 Page 6 May / June 2004 Workgroup decided to use the EXT_Compromise_buffers spec In favor: SGI, 3Dlabs, ATI, Intel. Abstain: NVIDIA, IBM (5 / 2) Key decision! ATI spec editor 3Dlabs workgroup chair In process of identifying and closing CB spec issues Proposed timeline (open for discussion) Sept 2004 – Draft CB based spec with render-to-texture support Dec 2004 – Final render-to-texture spec. Promoted to ARB Dec 2004 – 1 st Draft render-to-vertex array spec March 2005 –2 nd Draft render-to-vertex array spec June 2005 – Final render-to-vertex array spec. Promoted to ARB status June 2005 – Render-to-texture support added to core No benefit Need 16-bit fp Need 32-bit fp Need 16-bit and/or 32-bit fp

© Copyright 3Dlabs 2004 Page 7 ConclusionConclusion It has been a rocky 3 months Progress is now being made! Thanks to all workgroup participants, especially NVIDIA and ATI for the compromises made and their efforts to keep the workgroup going! Questions ?