05/14/2014 Flexibility Methods Workgroup. 2 © 2014 Electric Power Research Institute, Inc. All rights reserved. Overview/Agenda Discussion of Literature.

Slides:



Advertisements
Similar presentations
Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
Advertisements

NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Software Analysis Tools
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Technical Conference Avoided Cost Modeling January 6, 2015.
A Summary on Probabilistic Workshop held on September 9, 2014 Milorad Papic (RAWG Chair) Salt Lake City, January 13, 2015.
Secure System Scheduling with High Wind Penetrations J. Kennedy March 2009.
Capacity Valuation.
Full Monte Cost and Schedule Risk Analysis
Engineering Economic Analysis Canadian Edition
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
03 July 2015Course Overview1 Energy Project Evaluation RES Course ESP606 Goal: To build up knowledge to so that participants will be able to assess if.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
Least Cost System Operation: Economic Dispatch 1
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
CCU Department of Electrical Engineering National Chung Cheng University, Taiwan Impacts of Wind Power on Thermal Generation Unit Commitment and Dispatch.
Julia Matevosyan, Resource Adequacy January, 2014 Application of KERMIT in the DOE LTS process.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
Engineering Economic Analysis Canadian Edition
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Loss of Load Probability (LOLP) Project October 16, 2009 Resource Adequacy Technical Committee Meeting.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
Comparison of LOLP Practices Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23, 2009.
© 2015 Electric Power Research Institute, Inc. All rights reserved. Matthew Rylander EPRI April 20, 2015 Streamlined Method for Determining Distribution.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
A New Approach to Assessing Resource Flexibility Michael Schilmoeller Northwest Power and Conservation Council May 2, 2013 Portland, Oregon.
Michael Schilmoeller Wednesday, June 27, 2012 Quantifying Imbalance Reserves and Requirements.
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
IRP Review  IRPs with Significant Detail on Flexibility Assessment  Portland General Electric  Puget Sound Energy  Other IRPs.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
INTEGRATING WIND ENERGY WITH ELECTRIC SYSTEMS ERIC HIRST Consultant in Electric-Industry Restructuring Bellingham, WA December.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
© 2016 Electric Power Research Institute, Inc. All rights reserved. Aidan Tuohy EPRI Grid Ops and Planning Iowa State University.
Understanding Value of Short-Duration Resources CPUC RA Workshop March 5, 2016.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Variable Energy Resource Capacity Contributions Consistent With Reserve Margin and Reliability Noha Abdel-Karim, Eugene Preston,
Erik Ela, Eamonn Lannoye, Bob Entriken, Aidan Tuohy
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
GENESYS Redevelopment Strawman Proposal
Risk Assessment and Probabilistic Transmission Planning Methods
Michael Schilmoeller Friday, January 25, 2013
penetration of wind power
Transmission Planning in a Modern Market Environment
Vetting the GENESYS Model
Additional clarifications on economic and adequacy running hours
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
GENESYS Current Functionality
Planning Reserve Margin
Jim Mcintosh Director, Executive Operations Advisor California ISO
Base on maximum operating wind capacity at end of planning period
Ciara O’Dwyer Damian Flynn ESRI/UCD conference 17/09/2019
Presentation transcript:

05/14/2014 Flexibility Methods Workgroup

2 © 2014 Electric Power Research Institute, Inc. All rights reserved. Overview/Agenda Discussion of Literature Review: 45 mins Data Needs and potential datasets: 30 mins Method discussion: –Flexibility Requirements – 30 mins –Flexibility Provision – 45 mins –Hydro Modeling Assumptions – 30 mins

3 © 2014 Electric Power Research Institute, Inc. All rights reserved. Assessing Flexibility Increased ramping expected: –Wind and Solar –Potential for uncontrolled DER Need to be able to ensure sufficient capability in the system to provide operational flexibility Methods need to do some or all of following: –Measure requirements for flexibility –Assess whether system can meet requirements –Complement existing or altered IRP process Flexibility Requirements Availability of Resources

4 © 2014 Electric Power Research Institute, Inc. All rights reserved. Flexibility Requirements - methods 1. Historical or simulated data and a risk preference –Cover a certain percentage of historical or simulated data based on risk preference E.g. Cover all historical wind data based on 95 th percentile, chosen to represent CPS2 score –Sometimes based on expected conditions, e.g. need is higher in mid- point of wind output –Can be captured for different datasets relatively easily and well verified with numerous studies –Notable examples: NREL, PNNL, Doherty, NERC IVGTF 2. Run full unit commitment and economic dispatch study –Alter constraints to reflect need for flexibility –Use metrics which track violations –Examples: Bouffard, E3 REFLEX, Da Silva –More detailed simulation needed, but may better reflect reality if system operations known

5 © 2014 Electric Power Research Institute, Inc. All rights reserved. Flexibility Requirements (ctd) Methods will examine different time scales –<5 mins, 5 mins, 10 mins, 1 hour, 3 hours May capture locational aspects if required Can be based on dynamic procurement or static number Never try to capture 100% of all potential outcomes –NERC scores don’t require this

6 © 2014 Electric Power Research Institute, Inc. All rights reserved. Assessing flexibility adequacy Multiple levels can be used Screening Maximum Available Ramping Economic Dispatch Generator state estimates Generation characteristics Full Study w/ Flex constraints Level of detail May want to combine some of these

7 © 2014 Electric Power Research Institute, Inc. All rights reserved. Screening Methods Highest level: Assess ramping capability of system without regard to availability of resources –Example: IEA FAST1 – assess ramping capability against a number of snapshot points in time –Overly simplistic and misses generation limitations More detail: PGE IRP –Quantify required flexibility up to one hour –Examine available by turning on all capacity and moving to max capacity as soon as possible –Compare with required capacity Kirschen/Ma –Dependent on start time, ramp rate and operating range –Flexibility index presented for units and system –A means to measure and compare flexibility across resources

8 © 2014 Electric Power Research Institute, Inc. All rights reserved. Intermediate assessment Schillmoeller/NWPCC: Requirement for and provision of imbalance reserves –Calculates cumulative ramp duration curve –Orders resource over different time scales –Ability of capacity to recover over the course of a net deployment is then described  path –Requirement  minimum resource required meeting all of the paths IEA FAST v2: Basic dispatch stack –Examines optimistic and pessimistic assumptions Optimistic: Commit excessive capacity Pessimistic: Do not account for various constraints –Examine 1 year and compare requirements and available resources –Calculate number of periods when flexibility is short –Extensive data required, but not computation EPRI (2013) –Levels 1 and 2 of InFLEXion flexibility assessment tool –Level 1: Variability based on historical analysis (similar to other methods) –Level 2: Ramping capability, standing start of fleet, etc – similar to other methods above –Min gen available per hour of year (curtailment) –Up ramping similar to PGE methods

9 © 2014 Electric Power Research Institute, Inc. All rights reserved. Detailed Assessment Insufficient Ramp Resource Expectation (Lannoye) –Similar to LOLE, but for ramps –Probabilistic method to calculate frequency of deficits –Dependent on production cost modeling –Applied to up and down in multiple time intervals EPRI methods - extension of IRRE –Probability of flexibility deficit and expected unserved ramping: Deterministic metrics looking over 1+ year at various percentiles –Well being analysis combining these metrics E3 REFLEX tool: Detailed Monte Carlo simulation under a range of operating conditions –Availability of resources determined using conventional production simulation tools –Large number of 3-day scenarios simulated, energy and reserve violations tracked –Shapes determined to be used with tools based on flexibility required with penalties for not meeting energy or reserve

10 © 2014 Electric Power Research Institute, Inc. All rights reserved. Detailed Assessment (ctd) Menemenlis: Effect which operational processes have on the deliverability of the flexibility available from generators –Not the technical capability of a system’s resources –More suited to operations than planning Studarus: Operational flexibility of hydro fleet –Time series of flexibility available –Compares deterministic representation of flex available based on confidence intervals with deterministic representation of requirements –Can be used to visualize time periods into the future –Detailed operational flexibility assessment SERVM/EPRI study: Resource adequacy/production cost tool –Adopted to assess ability to meet uncertainty –Large number of draws of system operations –Can quantify impacts of variability and uncertainty on LOLE

11 © 2014 Electric Power Research Institute, Inc. All rights reserved. Conclusions Range of methods is quite large –Categorized here based on detail Need to base method used on goal of study –Detailed operational or resource planning? –New resources, or check for reliability of system? Levels used should also be based on data and resources available to do study

12 © 2014 Electric Power Research Institute, Inc. All rights reserved. Data Requirements All methods will require time series –Wind, load, solar, other non-dispatchable generation –High time resolution (1 min desired) –Spatial resolution depends on system studied –For scenarios, need to capture geographical spread etc. Data on resource also important for most methods: –Max and min stable output –Ramp rate, start time, min up and down times –Outage rates –Must run/availability constrained periods –Useful to have historical data as guide Hydro is important – later discussion

13 © 2014 Electric Power Research Institute, Inc. All rights reserved. Case study system Want to demonstrate chosen methods against useful system –Represents challenges of NW, e.g. hydro, wind and multiple regions –Needs to be simple enough to put together with existing data Four main options –BPA as is –BPA, with addition of additional thermal to represent other areas –Either of first two, split into 2 regions –IEEE test system

14 © 2014 Electric Power Research Institute, Inc. All rights reserved. Hydro Treatment Very important here Need to come up with a method which captures limitations on hydro fleet but also flexibility available Considers day ahead vs. real time available flexibility –Requires existing hourly dispatch from other tools Potentially: hold some MWh out and allow to go to machine limit for very short amount of time –Balance an “account” hourly, daily or weekly –Some amount held for energy, some for reserves 80 years should be used

15 © 2014 Electric Power Research Institute, Inc. All rights reserved. Discussion What types of requirements should be covered? What percentile of requirements covered? How should hydro be modeled? How should flexibility available to meet requirements be calculated? How should we measure deficiencies? What should the target be? What system should we use to demonstrate methods? How do we ensure the methods are suitable? Sensitivities? What data needs to be included?

16 © 2014 Electric Power Research Institute, Inc. All rights reserved. Summary Methods vary from simple screening to detailed UC/ED study –Need to examine 1 or 2 which capture important aspects of NW Demand for flexibility methods: –Historical analysis – use NREL or PNNL methods Supply of flexibility –Larger uncertainty – ensure we can adopt method to pessimistic or optimistic assumptions