Energy-Intensive Industrial Rate Workgroup Steve Bakkal Michigan Economic Development Corporation November 18, 2014.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
National Demand Response Action Plan Office of Energy Market Regulation Federal Energy Regulatory Commission.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
IPCC Products, Procedures and Processes Amsterdam, 14 May 2010 Dr. Renate Christ, Secretary of the IPCC.
RESOLVE, Inc. National Geothermal Collaborative An Overview January 20, 2004.
Energy-Intensive Industrial Rates Workgroup Information Session Steve Bakkal Michigan Energy Office Michigan Economic Development Corporation March 24,
Public Interest Energy Research –Natural Gas Program Status Presentation to Air Emissions Advisory Committee May 12, 2005 Philip Misemer California Energy.
M ICHIGAN P UBLIC S ERVICE C OMMISSION Cost of Service Ratemaking Michigan Public Service Commission Department of Licensing and Regulatory Affairs.
REPORT TO GRPE 68 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document No. GRPE (68 th GRPE, 9-10 January, 2014,
High-Level Meeting of Regional Energy Regulatory Associations of Emerging Markets Sergey Novikov Head of the Federal Tariff Service (FTS of Russia) April.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
1 Improving Federal Rights-of-Way Management to Spur Broadband Deployment Meredith Attwell Senior Advisor to the Assistant Secretary National Telecommunications.
IAP Day 2 AM: Private sector engagement in DRR – Global and Regional update.
Florida Transportation Commission TEAMFL January 21, 2011 Stephen Reich, Center for Urban Transportation Research, University of South Florida.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
TRANSITION PLAN STAKEHOLDER GROUP CENTER FOR DEAF AND HARD OF HEARING EDUCATION.
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
Senate Enrolled Act No. 369 Update Indiana’s Water Shortage Plan.
Energy-Intensive Industrial Rates Workgroup Update May 22, 2014.
Comprehensive Regulatory Revision Office of Developmental Programs.
Low Income Programs and Consumer Protections Energy Regulatory Partnership Program Abuja, Nigeria July 14-18, 2008 Presented by Robert W. Kehres.
INTRODUCTION TO THE UNIDO/REEEP TRAINING MANUAL ‘SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA’ User Manual.
Legislative Policy Committee ISAC Board approved concept at their meeting in December.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
National Demand Response Action Plan David Kathan Office of Energy Policy and Innovation Federal Energy Regulatory Commission APPA National Conference.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Anglophone West School District Education Council Sustainability Study – Bath Elementary and Middle Schools Executive Summary April 23, 2015.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
ENVIRONMENTAL PRIORITIES PANEL Chris Korleski, Director, Ohio EPA Tom Easterly, Commissioner, IDEM Official Representing New KY Governor Beshear.
Report to the Legislature Required by Senate Bill 2202 (due January 1, 2002) Board Briefing June 13, 2001 Agenda Item 5 Attachment 1.
NARUC/FERC COLLABORATIVE: DEMAND RESPONSE Paul Suskie, Chairman, Arkansas Public Service Commission July 15, 2007.
Wisconsin Transportation Finance and Policy Commission Transportation Day at the Capitol February 23, 2012.
Page 1 Emerging Issues and Outreach Working Group Gary Hannaford, Working Group Chair IESBA Meeting September 16-18, 2013 Sydney, Australia.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Business Practices Subcommittee Update Executive Committee Meeting April 29, 2014.
Reusable Launch Vehicle Working Group Commercial Space Transportation Advisory Committee Presented to COMSTAC Meeting George Whitesides, RLVWG Chairman.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
Open Public Meeting February 28, pm – 5 pm 1 Ashburton Place, Boston MassHealth Demonstration to Integrate Care for Dual Eligibles.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
Every Student Succeeds Act January Christopher Woolard Senior Executive Director, Center for Accountability and Continuous Improvement Colleen D.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
CONSULTATION GUIDELINES IMPLEMENTATION UPDATE June 2007.
Towards REF 2020 What we know and think we know about the next Research Excellence Framework Dr. Tim Brooks, Research Policy & REF Manager, RDCS Anglia.
CBP Biennial Strategy Review System
GEOSS Data Sharing Principles
CPUC Rate Proceedings Relevant for TOU
Implementing the Transportation/Land Use Connection Program
CBP Biennial Strategy Review System
Big Game Season Structure
NPA 450/579 (Area Code) Relief in Quebec
DRG Implementation Overview
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
NPA 403/587/780/825 (Area Code) Relief in Alberta
Big Game Season Structure
Development of energy balance statistics
Grace Anderson Chair, Budget Work Group May 16, 2018
Customer Satisfaction Measurement Work
Grace Anderson Chair, Budget Work Group May 16, 2018
Bannock County Comprehensive Plan
Presentation transcript:

Energy-Intensive Industrial Rate Workgroup Steve Bakkal Michigan Economic Development Corporation November 18, 2014

On December 19, 2013, Governor Snyder held a media roundtable outlining his vision for a "no regrets" energy future by 2025.media roundtable

Objective of Workgroup: Develop non-legislative options that can reduce electric rates for energy intensive companies, abiding by existing policies and cost-of-service principals.

Generally, for energy-intensive companies, energy costs are significant portion of company's operating costs. This can apply for small and large users. For these companies, energy costs are one of the top factors used for investment and location decisions. Applies to existing businesses in Michigan and those interested in locating in Michigan. Why focus on energy-intensive businesses?

Deliverable – Inform Decision Makers: A final report of options that will be used to inform the Governor, legislative staff, MPSC, and stakeholders. This report will detail how various options will impact all ratepayers. Final report will be issued by the workgroup and should not be construed as being reviewed or approved by MPSC commissioners

Workgroup Scope Workgroup is not replacing existing regulatory process or procedures. Focused on cost allocation, rate design, and other rate options that can be implemented without new legislation.

The workgroup is chaired by Steve Bakkal (MEDC) and consist of participants representing: (2) Large utilities (1)Small utility (1) Regulated Co-op (2) Legislature (house and senate staff) (2) MPSC staff (Up to 10) Energy intensive business customers representing broad range of industries and geographic locations Workgroup Participants

Workgroup Selection Process Held information session at MPSC offices on March 24 th, Utility, legislative, and MPSC staff selected with direct outreach Business customers nominated themselves or other businesses by 5pm March 31, 2014 on Businesses were asked to submit the following: -Brief description of relevant experience/general knowledge of topics and the regulatory process. -Knowledge of respective industry needs, challenges. Members selected were contacted directly by April 2, 2014 and posted on under the Workgroup page.

Commitment to meet with the workgroup bi-weekly on 9:00am in Lansing or by phone starting April 7 th through end of May. Active participants at the meetings, offering suggestions and providing input from own company experience and industry peers. Members encouraged to get input from peers, associations, industry experts, etc. outside of meetings if necessary. Businesses Customer Participant Roles & Expectations

MEDC & MPSC Steve Bakkal – MEDC Steve McLean - MPSC Dan Blair – MPSC Business Customers Mike Binion - Gerdau Special Steel North America David Stoner - United States Steel Corp George Andraos - Ford Motor Company Steve Brooks - Verso Paper Corp Keith Tyson Kenebrew - Dow Chemical Company Gerrit Reepmeyer - Severstal North America Jennifer Steiner - Burner - Marathon Petroleum Daniel Voss - General Motors Company Richard Nelson - Praxair, Inc. Rod Williamson - Dow Corning Corporation Utility Representatives Don Stanczak – DTE Stephen Stubleski – CMS Jim Ault - MEGA Kim Molitor - Wolverine Power Legislative Staff Greg Moore – Senate Dan Dundas - House Workgroup Members

Workgroup Timing March 13 th – Press Release announcing workgroup process and meeting at MPSC March 31 st – Deadline for business customer nominations April 2 nd – Workgroup members announced April 7 th - May 19 th – Workgroup meetings at MPSC May 30 th - June 20 th – Develop draft outline & report July 7th– Post draft report online for public comment July 21 th – Comment period closed August 12th– Issued final report

Utilize a 4CP 100% demand electricity production cost allocator to better reflect cost causation Provide a tariff for time-based rates Explore energy cost allocation and collection that reflect seasonal cost variations Explore rate designs that appropriately compensate customers with loads that can be curtailed during peak periods Calculate load factors as 12 month averages Recovery of surcharges allocated and collected in accordance with all of the cost of service principles outlined in the report should be explored Full report and recommendations available on “workgroup” tab on rightwww.michigan.gov/energy Workgroup Recommendations…

Implementation Options Two Options Utility companies files rate case with new cost allocation or rate design method generated from workgroup MPSC commences a proceeding for each utility to examine cost allocation and rate design methods (PA169 of 2014). New rate established no later than Dec 1, Workgroup report can be used to inform MPSC.

Questions Steve Bakkal Michigan Economic Development Corporation