Dynamic Settling/Stability Workgroup – Summer 2013

Slides:



Advertisements
Similar presentations
W ORK G ROUP ON E VALUATION OF NAF R EMOVAL AND W ATER - W ETTING BY S PACERS – S UMMER 2013, W ASHINGTON, DC Deryck Williams – Chairman.
Advertisements

Descriptive Measures MARE 250 Dr. Jason Turner.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
Presented by Wanda Pagonis Lytle ISD Granny or Grandpa on the Ramp! PositivelyAging®/M.O.R.E. 2007© The University of Texas Health Science Center at San.
Chapter 3: Descriptive Measures STP 226: Elements of Statistics Jenifer Boshes Arizona State University.
Measures of Central Tendency
Stat 217 – Day 10 Measures of spread, position (Topic 9)
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
Lab 01 Fundamentals SE 405 Discrete Event Simulation
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
Deryck Williams – Chairman Rick Lukay – WG Lead. Develop a technical report on recommended testing protocols for measuring HTHP rheology of cement slurry.
API Dynamic Settling June 11-15, Project Goals Design four systems for cooperative testing. System 1 Pass API Sedimentation Test Fail Dynamic Modified.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
Leaders Manage Meetings
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
Vertical Scale Scores.
Copyright © 2011 Pearson Education, Inc. All rights reserved. Doing Research in Behavior Modification Chapter 22.
SPEC 13A Sec. 16 Drilling-grade Starch
Doing Research in Behavior Modification
MineralScan Fill Level Signal Examples & Explanations - RNMC Introduction The MineralScan MillSlicer system normally consists of two fixed vibration sensors.
Training Manual and Lab Activities   Overview of manual   How to develop IPAP   Develop lesson plan   Your Lab orientation   Things to Remember.
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Discipline Referrals Presented by: Christine Lee Presented by: Christine Lee.
Electronic Engineering Department Final Year Projects September 2008.
Chapter 5. Adaptive Resonance Theory (ART) ART1: for binary patterns; ART2: for continuous patterns Motivations: Previous methods have the following problem:
Interpreting Data for use in Charts and Graphs. V
Westminster, Colorado June 12, API Cooperative Testing Preliminary Report on Compressive Strength.
Higher PE Preparation of the Body
Title of presentation umanitoba.ca Final Evaluation.
Objectives The student will be able to:  use Sigma Notation  find the mean absolute deviation of a data set SOL: A
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Chapter 5 Describing Distributions Numerically.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
Determination of Fluid Loss Screen Life API SC 10 Scott Jennings 2012 Exploration and Production Standards Conference on Oilfield Equipment and Materials.
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Long Term Integrity of Cement Systems June 19, 2003.
Transportation, Handling, and Testing Standards Update 12/3/14 Bryan Williams Adeola Akinola IOPP Transport Packaging Committee.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Test Cell Airflow Study For Cargo.
Describing Quantitative Data with Numbers
API SC 10, Work Group 13 Update:
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
WG on HTHP Rheology Winter 2016, austin, tx
Please review these important Webinar Etiquette guidelines
API SC 10, Work Group 3 Update:
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2016 Summer Meeting Report.
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2017 Summer Meeting Progress Report.
2017 Exploration & Production Winter Standards Meeting
Reasoning in Psychology Using Statistics
Reasoning in Psychology Using Statistics
Luxembourg 30 January-1 February 2006
SC-10 Oil Well Cements WG-08; Static Gel Strength Testing Phase IV
Warm – Up Find the Mean, Median, Mode, IQR and Standard Deviation of the age of a room containing 5 people. Ages: 16, 18, 17, 16, 19. Calculate all values.
2016 Exploration & Production Standards Conference Subcommittee 10
Proposed Ozone Monitoring Revisions Ozone Season and Methods
4 Labs, 1 Period Ready? Set?.
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 2017 Exploration & Production Standards
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2018 Winter Meeting Progress Report.
Reasoning in Psychology Using Statistics
Interpreting Data for use in Charts and Graphs.
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
SC-10 Oil Well Cements WG-08; Static Gel Strength Testing
Today Members Workgroup charge/ Current Status Discussion.
Alternative Mixing Procedure
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

Dynamic Settling/Stability Workgroup – Summer 2013 Robert Beirute, Beirute Consulting; Heath Williams, Schlumberger; Paul Sonnier and Jeff Watters, CSI, Deryck Williams, ChevronTexaco; Greg Garrison and Katrina Price, OTC; Graeme Anthony, OFIte June 25th, Houston, TX

Agenda 1. Minutes of Previous Meeting and Action Items 2. Overview of Workgroup objectives/progress 3. Procedures to run dynamic vs. static testing for Workgroup 4. Summary of API Cooperative test results 5. Our roadmap moving forward

Minutes of Previous Meeting 4/15/2017 Minutes of Previous Meeting TG on Test Methods for Determination of Dynamic Settling Several task group members were present. Meeting Minutes for January 22nd, 1:15pm held at the Intercontinental New Orleans, LA Review of testing conducted so far which included a hematite system that failed both the dynamic settling and free fluid testing, and the spacer system which passed both the dynamic and free fluid test. A system that passed both free fluid and DST A system that will pass the free fluid but fail the DST is still being designed The chairman made the comment that static settling has the potential to develop gel strengths which can aid in stability whereas dynamic settling does not allow for development of the gel strength. Action Items After much discussion it was decided to pursue the development of Designs 1 and 2 Continue the round robin testing for the next meeting in the summer. Designing system for round robin testing that passes static criteria and fails dynamic criteria Updating the procedure to include the syringe method for taking the density readings of top, middle and bottom. Update the procedure to include the weighing of the paddle before and after the test. Cement Design Cement treatment Natural causes Post-placement stresses Indicates Action Items that have been completed

Completion/Progress and Projected Timeline 06-2011 01-2012 06-2012 01-2013 06-2013 01-2014 06-2014 Explored DST alternatives 100% Phase 1 – showed systems that passed/failed Static and DST 80% Phase 2 – cement failed DST but passed static % Workgroup Completion Phase 2 – Updated procedures and begin technical report 60% Phase 3 - Submit report/procedures for comments and review from DST Workgroup 40% Phase 4 - Submit report/procedures for comments and review from SC10 20% Phase 5 - Final report/procedures ratified by SC10 0%

Objectives for Phase 2 Testing Test a cement system that would show unique value of DST for performance-based cement stability evaluation 1. Pass GO/NO testing with minimal increase in BC (less than 50BC) 2. Pass free fluid criteria with less than 1% free fluid. 3. Pass sedimentation test criteria with less than 5% settling 4. Fail DST criteria with more than 5% change in density trend measured down the length of the slurry HPHT cup after DST testing 5.Fail DST cone height measurements (greater than 0.5 inch in height) Add test procedures and interpretation guidelines Define motor speed at 25 rpm Ramp to BHCT following well schedule, Stabilize for at least 30 min, Turn motor speed to 25 rpm for 30 min, Shutoff motor ensure lab to lab uniformity in low shear exposure period, cool to 190deg as soon as possible and perform measurements Use DST cone height results for under-dispersion/over-dispersion at HPHT conditions.

Phase 2 – Updated DST Procedure and comparison with older versions of procedure Previous version(s) Updated version Motor speed was varied between 25-35 rpm, depending on procedure 25 rpm is locked as the one motor speed Motor speed was left at 25-35 rpm for at least 20 min period and cool-down period also Motor speed is left at low shear for at least 30 minutes and then the motor is shut down before cool-down period No attempt was made to quantify under and over-dispersion with DST Attempt is made to quantify under and over-dispersion with DST with simple mathematical relationship No density trend with syringes 10-mL tared syringes used to collect from upper, middle, and lower thirds of slurry cup Only center cone height used as consideration Center, ½ radius or middle, and radius or outside positions are used in mathematical relationship = %deg dispersion = (center cone height-outside cone height)/center cone height x 100%

Link to DST, GO/NO GO – Free Fluid, and Sedimentation Updated Procedures Unpacking List .\Unpacking List and Dynamic Weigh Out Sheet _CD_RHW_15 May 2013.pdf DST Procedure Dynamic Settling Test Procedure _ Ramp up to 350 degF.docx GO/NO and Free Fluid Procedure Free Fluid Test after Conditioning in HPHT Consistometer_15 May 2013.docx Sedimentation Test API Sedimentation Test.docx

Workgroup Cooperative Testing Summary Workgroup Members WG1 WG2 WG3 WG4 WG5 Ave STDev BHCT (degF) 350 GO/NO GO Init/Max BC NA 12/7 24/28 4/8 15/33 12/23 7/13 Free Fluid (%) 5 1.3 1.6 2.4 FF Angle (deg) 45 Sedimentation. Test (max dev.) (%) 3.0 1.7 0.5 Static Slurry Stability Achieved? Yes - DST – dens top 1/3rd (lbm/gal) 15.4 15.9 15.2 14.5 13.7 14.9 0.9 DST - dens mid 1/3rd (lbm/gal) 16.7 17.2 16.2 17.6 16.8 16.9 DST – dens bott 1/3rd (lbm/gal) 18.2 0.7 % difference density top-bottom 8.4 9.9 25.5 23.4 14.7 9.0 Cone height – center (in.) 1 1.5 1.1 0.3 Cone height – 1/2R or middle (in.) 0.63 0.8 0.4 Cone height – R or outside(in.) 0.31 1.4 1.0 Degree of dispersion (%)* 69 6.7 9.1 33.3 26.7 29.0 25.1 DST Slurry Stability Criteria Achieved?** No 1STD 2STD * Greater than 50% difference between center and outside cone height indicates underdispersed slurry ** Less than 50% difference and cone height less than 0.5 in. for any measurement location is stable slurry as per DST criteria

GO/NO GO Test Results

GO/NO test observations after pulling paddle SLB CSI OTC

Free fluid observations after conditioning in GO/NO GO test and 2 hrs at ambient temp as per API RP10B-2 SLB CVX CSI OFIte

DST consistency behavior during motor speed at 25 rpm

DST cone observations after revised DST procedure and removing modified paddle SLB CSI OFIte OTC CVX

Conclusions Go/No Go test results – Average Min/Max BC 12/23 with StDev 7/13 Free fluid test results at 45deg angle – Average 1.6% with StDev 2.4% 2 workgroup members had 0% free fluid with 1 workgroup member showing 5.0% Static Sedimentation – Average 1.7% with STDev 1.3% Depending on individual organization best practices, typically less than 5% is stable DST syringe density trend– Average 14.7% with STDev 9.0% 2 workgroup members had less 10% and 2 had more than 23% DST cone height – Average 1.3,1.1,1.0 with STDev 0.3, 0.4, 0.4 Degree of Dispersion – Average 29.0% with STDev 25.1% 1 workgroup member had outlier of 69% Either procedure needs to be clarified further to emphasize unpacked cone over packed cone for height measurements Perhaps angle of cone slope needs to be explored instead of % difference of height Other methods needs to be explored

Collect more cooperative data from workgroup members Our Roadmap… Collect more cooperative data from workgroup members Look at alternative ways of describing dispersion (slope of cone using Pythagorean theory?) Write technical report/RP for workgroup input and comments Submit workgroup-validated report/RP to SC10 for input and comments Submit technical report/RP to SC10 for vote/ratification In this roadmap slide, I will discuss potential exploration of Futur US as an additional cost-effective cement solution in our portfolio with the emphasis on D204’s self healing properties…but will not put Futur US on the roadmap slide.

Questions from the Audience