Authoring Instructional Materials (AIM) Roadmap

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
Mr. Tom Bonnano Learning Standards Branch Head 24 FEBRUARY 2015
AIM FRB Meeting 4-6 November Meeting Logistics Parking Base Access – not needed Coffee Vending Machines Food Facilities Come & Go as needed…
AIM Toolset Interfaces with Authoritative Technical Data
Authoring Instructional Materials (AIM)
AIM FRB Briefing NAVSEA 07TR3 Sandra Wiegmann Submarine Training Systems Division NAVSEA 07TR3 4 Nov 2008.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
AIM – CeTARS Web Service Interface: Course Master Schedule and Other Possibilities November 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 18-1 Accounting Information Systems 9 th Edition Marshall.
AIM Program Software Status
IPC Revision Management (IPCRM) Project 47th session of the IPC Committee of Experts Geneva April 17, 2015 Patrick Fiévet Head of IT Systems Section.
A look at the NETC End-to-End (E2E) Process using the Content Planning Module (CPM) / Learning Object (LO) Module.
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
Feb 2011 AIM FRB Action Item Review 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Segment Two: Business Requirements Drive the Technical Updates January 26-27, 2012 Idaho ICD-10 Site Visit Training segments to assist the State of Idaho.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
Navy Job Analysis (NJA) 1.  Purpose: Restore, streamline and improve Navy Job Analysis Management Capabilities  Supports: Navy Occupational Classification,
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
NETC N6 Status Update to AIM FRB 18 Sep 12 Bruce Bare, NETC, N62 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
K-12 Web Content Development Process
JTIMS Lesson Learned Initial Observation Capability LCDR Steven Jaureguizar JTIMS Program Manager.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
AIM/CPM Briefing & Demo 4 November 2009 Jamie Stewart, AIM Team ISD Lead Danette Likens, AIM Team ISD.
Roles/Privileges/Workflow IPT Status Report. Agenda –Members –Tasks –Status –Functional Requirements.
EDI Project Adam Davie Clark Bedsole Tim Jansen Robert Jones.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
AIA RFID Data Exchange Guideline Status AIA / Electronics Enterprise Integration Committee May 10, 2005.
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
1 AIM FRB Briefing Karen Pohl Curriculum Systems Director Naval Special Warfare Center 3 Nov 08.
AIM FRB Meeting Overview 4-6 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
NETC Fleet Assessment Initiative 5 November 2009 Mike Dekle, NETC, N516.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
February 23, 2006 MTAC Workgroup #87 Improving the Drop Shipment Process Update.
NCI Clinical Trials Reporting Program CTRP User Meeting May 4, 2011.
NETC Authoring Instructional Materials (AIM) Roadmap February Bruce Bare.
 Course Master Schedule/Resource Requirement List Authoritative Data Sources. (CeTARS or AIM CPM)  Identify Current CMS Business rules and deficiencies.
Hazard Mitigation Planning VII
Installation Plan Checklist
Office 2007 and the IDC Templates
Records Management & ARIMS
AIM Program of Record Roadmap for Migration and Sunset
AIM Program of Record Roadmap for Migration and Sunset
Presentation transcript:

Authoring Instructional Materials (AIM) Roadmap NETC Authoring Instructional Materials (AIM) Roadmap 20 August 2014 Bruce Bare

Agenda Enterprise Training Management Framework (ETMF) ETMF Integration between AIM-CPM and CeTARS AIM and CeTARS Data Exchanges (As-Is) AIM and CeTARS – Courses of Action Future Workgroups Other Items of Interest Questions

AIM and CeTARS As-Is

Current AIM and CeTARS Data Exchanges The Course Master Schedule (CMS) provides a detailed sequential period-by-period course structure outlining learning topics for each Course Outline of Instruction (COI). CeTARS and AIM maintain CMS at the CDP level. Two methods are currently in place for input of the CMS into CeTARS: Manual Input by the Learning Center or Learning Site using user input forms in JCERS. A direct one-way AIM I/II to CeTARS web service. NETCINST 1510.1A (18 Feb 2010) identifies CeTARS as the Authoritative Source for Course Information. The Resource Requirements List (RRL) is maintained in AIM I/II as part of the TPP and TCCD. Course RRL data is maintained in AIM and can be provided to LC via a PDF file. LC manually input RRL data, with the exception of Publications, into CeTARS using AIM PDF file. CNATT used ATEM for RRL minus Pub data. This produced an ERL – Equipment Requirements List. CNATT ERL is manually downloaded via a flat file from CeTARS and uploaded into AIM for RRL updates. Assessments No current interfaces exist between AIM and CeTARS for Assessment data. A data output capability from AIM II to export test items is maintained in AIM in a “.csv” format compatible with direct import to CeTARS testing. This function has been used by CNATT to transfer test items between AIM II and CeTARS.

AIM and CeTARS – Notional Course of Action

Courses of Action COA #1: This shows AIM-CPM providing the RRL to the CeTARS eTEM module and the CMS to the CeTARS CERS module. AIM does not currently version the RRL for a specific CDP CeTARS eTEM module is at the CIN level and can not accept CDP RRL from AIM-CPM CeTARS applies versioning to the CMS once it is received from AIM II COA #2: This is the opposite of COA #1 as it shows CeTARS providing the RRL and the CMS to AIM-CPM. This COA will significantly make changes the TPP and TCCD process in regards to RRL development CeTARS eTEM will still be required to re-program from CIN to CDP Level AIM-CPM will receive PDF version of RRL and CMS from CeTARS Workgroups: The selection of either COA will require the formation of several workgroups and a project management strategy for implementation. How are we going to implement those three goals. Do all the people who hsee PII or SSN9S) have a need to know? Are the people viewing

Future Workgroups CMS Working Group: Database differences between CPM and CeTARS indicate a deep dive into the requirements of CeTARS and CPM for the Course Master Schedule (CMS). COA #1: As the data density of CPM increases, current CMS Web Service from AIM II will need to be revisited for inclusion or revision of data elements from CPM. COA #2: A structural change will be made to AIM and CeTARS to accommodate the original CMS in CeTARS and transfer it in PDF formatted to CPM. RRL Working Group: Currently, CNATT has exclusive equipment data sharing with AIM II via a downloadable Equipment Resource List (ERL). However, the ERL does not contain all data elements of the RRL: specifically, Publications and IETMS. COA #1: An RRL interface will need to be made for other CDPs and include all remaining RRL data elements. Also, AIM-CPM does not currently have the programming capability to designate the final approved RRL as “Approved”: versioning will need to be incorporated through programming of AIM. COA #2: Major structural changes will be made to CeTARS eTEM to house the original RRL by CDP. AIM will receive the RRL from CeTARS where needed in PDF format. Workgroup Team Make-up: (Jim F.) - Not sure why one would need a 'switch' or a 'milestone'. Do it, put it online, and keep both available until the old one no longer serves a purpose. (Jim F.) – AIM II only for CMS. Project Manager Database Steward eTEM Analyst and Developer CERS Analyst and Developer Course Analyst and Developer AIM analyst and Developer TPP/TCCD Process Owner

Other Items of Interest OCCSTD – JTA – JDTA Impact SIPR and NIPR Analysis and Development Testing – Test Item Analysis – Assessments – Advancement Exams Enterprise AIM Performance Training Policy Capacity of Internal Storage MACROS and Outside Systems – Internal Text Generation Non NETC Commands using AIM How are we going to implement those three goals. Do all the people who hsee PII or SSN9S) have a need to know? Are the people viewing

Questions

Backup Slides