WP 3 - Technical design & Implementation of the Integrated system Wouter Jan Smeulers LogicaCMG The Hague Roland Ettema LogicaCMG Maastricht Louis Maessen.

Slides:



Advertisements
Similar presentations
CASDA Project Management A presentation to the CASDA Preliminary Design Review IM&T / CASS Dan Miller | CASDA Project Manager 11 March 2014.
Advertisements

Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Supporting education and research E-learning tools, standards and systems Sarah Porter Head of Development, JISC.
8.
WP5 – Knowledge Resource Sharing and Management Kick-off Meeting – Valkenburg 8-9 December 2005 Dr. Giancarlo Bo Giunti Interactive Labs S.r.l.
The HITCH project: Cooperation between EuroRec and IHE Pascal Coorevits EuroRec 2010 Annual Conference June 18 th 2010.
WKES 3202 SOFTWARE REQUIREMENTS ENGINEERING SEMESTER 1 SESSION 2004/2005.
TENCompetence Assessment Model, Related Tools and their Evaluation Milen Petrov, Adelina Aleksieva-Petrova, Krassen Stefanov, Judith Schoonenboom, Yongwu.
A basic framework for integrating social and collaborative applications into learning environments Ayman Moghnieh and Josep Blat Universitat Pompeu Fabra,
FREMA: e-Learning Framework Reference Model for Assessment David Millard Yvonne Howard IAM, DSSE, LTG University of Southampton, UK.
Understand European Energy Supply Security Management Co-ordinators UNDER way towards STANDard indicators for continuous VET A short summary.
Iterative development and The Unified process
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
WP 8: Networks for Lifelong Competence Development Alicia Cheak INSEAD CALT (Centre for Advanced Learning Technologies) TEN Competence Kickoff Meeting.
Merlin ITEA Symposium Merlin Overview2 Problem domain Companies hardly develop embedded products completely on their own Embedded systems need.
Enterprise Architecture
Release & Deployment ITIL Version 3
Developing Enterprise Architecture
IST Programme project IST CELEBRATE Context e-Learning with Broadband Technologies.
Web Development Process Description
UML - Development Process 1 Software Development Process Using UML (2)
CSI315 Web Applications and Technology Overview of Systems Development (342)
RUP Fundamentals - Instructor Notes
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
The Preparatory Phase Proposal a first draft to be discussed.
Slide 1 Wolfram Höpken RMSIG Reference Model Special Interest Group Second RMSIG Workshop Methodology and Process Wolfram Höpken.
International Workshop on Web Engineering ACM Hypertext 2004 Santa Cruz, August 9-13 An Engineering Perspective on Structural Computing: Developing Component-Based.
European Life Sciences Infrastructure for Biological Information ELIXIR
WP10 Dissemination Oleg Liber, U. Bolton UK Objectives 1.To disseminate, on an on-going basis, the RTD outcomes: specifications and standards, architectures,
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
TENCompetence: The European Network for Competence Development Chris Kew CETIS April
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
Role-Based Guide to the RUP Architect. 2 Mission of an Architect A software architect leads and coordinates technical activities and artifacts throughout.
University of Southern California Center for Systems and Software Engineering Model-Based Software Engineering Supannika Koolmanojwong Spring 2013.
U.S. Department of Agriculture eGovernment Program Design Approach for usda.gov April 2003.
CLARIN work packages. Conference Place yyyy-mm-dd
Initial plans for WP 4 KickOff Meeting ICT-AGRI 2.
EVA Workshop, 26 March 2003, Florence, Italy1 COINE Cultural Objects In Networked Environments Anthi Baliou University of Macedonia,Library Thessaloniki,
Integrating competence development at the individual-, group- and organizational level Luxembourg, February 6, 2006.
Aim (and name)... We will build The European Network for Lifelong Competence Development i.e. Provide a technical and organisational Infrastructure that.
WP 9 training2 WP 9 TRAINING Kick-off Meeting – Valkenburg 9 December 2005 dr.Marlies Bitter-Rijpkema, Open Universiteit Nederland.
1 ECCF Training 2.0 Introduction ECCF Training Working Group January 2011.
WP2: Domain Model + WP3 TENCC Rob Koper & Hubert Vogten TENCompetence Project Meeting 3-4 July 2006 Kerkrade, The Netherlands.
J. Scott Hawker p. 1Some material © Rational Corp. Rational Unified Process Overview See and use the RUP Browser on lab machines.
Architecture View Models A model is a complete, simplified description of a system from a particular perspective or viewpoint. There is no single view.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
National Nuclear Regulatory Portal (NNRP) (Concept, Development and Experience) FNRBA Training Course on Knowledge Safety Networks, 14–18 October 2013,
Work package WP1 Improving competences and skills of the building workforce in Lithuania related to nearly zero energy buildings Acronym of the project:
OUNL’s assessment model January the 10th 2006 Colin Tattersall & Henry Hermans.
AtGentive Project Overview; kick-off meeting; 7-8 December 2005, Fontainebleau AtGentive Project Overview AtGentive; Kick-off Meeting; 7-8 December 2005,
Supporting further and higher education E-learning Framework and Tools Tish Roberts JISC Programme Manager.
From Use Cases to Implementation 1. Structural and Behavioral Aspects of Collaborations  Two aspects of Collaborations Structural – specifies the static.
Community for Risk Management & Assessment Kick-off January 20 th Brussels N. van Os Veiligheids Regio Zuid-Holland Zuid (Safety Region South-Holland South)
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
From Use Cases to Implementation 1. Mapping Requirements Directly to Design and Code  For many, if not most, of our requirements it is relatively easy.
Frank Schipplick Work Package Coordinator WP1 - eSignatures.
Information Systems Development
Software Requirements
<Name of Product>Pilot Closeout Meeting <Customer Name>
The Open Group Architecture Framework (TOGAF)
Design and Implementation
ESS.VIP VALIDATION An ESS.VIP project for mutual benefits
Portfolio, Programme and Project
ESS.VIP Validation Item 5.1
Presentation to European Flood Risk Management Policy Makers
Data Architecture project
VNF Validation Project (VVP) Governance Model – Preliminary Views Sandeep Shah November 9, 2017.
Presentation transcript:

WP 3 - Technical design & Implementation of the Integrated system Wouter Jan Smeulers LogicaCMG The Hague Roland Ettema LogicaCMG Maastricht Louis Maessen LogicaCMG Maastricht

Agenda I.LogicaCMG’s vision on competence development (Wouter Jan Smeulers) II.Work package 3 Technical design & Implementation of the Integrated system (Louis Maessen) Objectives Overall approach III.WP3 in more detail (Roland Ettema) IV.Organisation (Louis Maessen) Global time plan Risks and measures Preparation of the technical kick-off January 2006

Wouter Jan Smeulers Principal Consultant LogicaCMG © 2005 LogicaCMG (e) Learning L o g i c a C M G NL (e) L e a r n i n g C o m p e t e n c e C e n t r e (e) C o m p e t e n c e D e v e l o p m e n t... t h e s k y I s t h e l i m i t ? L O G I C A C M G ( e ) E D U C A T I O N

To boldly go … establish the most appropriate technical and organizational infrastructure, for lifelong competence development

The development of Who has the map? a good idea … An infrastructure, for lifelong competence development …

We needed a roadmap… in 3D

To develop a system bordered by functionalities… LEARNING CONTENT LEARNING INFRASTRUCTURE LEARNING MANAGEMENT Prerequisite 1: Coherent subsystems for competence development

To develop a system agreed upon by all perspectives… ORGANISATION PEDAGOGY TECHNOLOGY Prerequisite 2: Involve predominant stakeholders

To develop a system using time structures… Instructional Systems Design: ADDIE Dynamic Systems Development Method Prerequisite 3: A structured process approach!

Integrated into a framework Evaluation Implementation Development Design Analyses Processes Perspectives (Sub)System Pedagogical Organizational Technical Management Environment Content Processes Perspectives (Sub)System

TenCompetence (a wide HR perspective) Competency (certificates) reuse and exchange Competency Certification Competency Assessment Competency development Formal knowledge & learning resources Informal knowledge & learning resources Individual competence development Organizational competence development (Human Resource Development) (Competence Management) (Knowledge Management) 2 – Overview of resources 3 - Business Models 5 - Support on using the infrastructure 6 – (Decentralized) management of learning networks 1 - pedagogy 7 - Integrate Learning & Working 4 - assess competencies

The End Thanks for attending! Any Questions…? / +31(0)

Agenda LogicaCMG’s vision on competence development (Wouter Jan Smeulers) Work package 3 Technical design & Implementation of the Integrated system (Louis Maessen) –Objectives –Overall approach WP3 in more detail (Roland Ettema) Organisation (Louis Maessen) –Global time plan –Risks and measures –Preparation of the technical kick-off January 2006

WP3 Objectives first 18 months 1)To develop an architecture that supports the agile integration of heterogeneous tools and applications 2)Design and implement the first version of the common services layer as integral part of the architecture 3)Select, design and implement adaptations of existing components that are currently state of the art and form the building blocks of the architecture 4)Design and implement a first version of the integrative layer tying all common services together and thereby delivering the first version of the integrated TENCompetence System 5)Set up and maintain the infrastructure for the running pilots

WP3 Technical design & Implementation of the Integrated system Global overall approach (technical) Architecture model Technical design WP2 Requirements & Analysis of the Integrated system Construction of the Integrated system WP 5,6,7,8 Technology standards & architectures Technical validation WP4 Pilots with & validation of the integrated system WP2

Agenda LogicaCMG’s vision on competence development (Wouter Jan Smeulers) Work package 3 Technical design & Implementation of the Integrated system (Louis Maessen) –Objectives –Overall approach WP3 in more detail (Roland Ettema) Organisation (Louis Maessen) –Global time plan –Risks and measures –Preparation of the technical kick-off January 2006

Integration RTD Management Aspect RTD Validation WP 1 Consortium Management WP 5 Knowledge Resource Sharing & Management WP 6 Learning Activities & Units of Learning WP 7 Competence Development Programmes WP 8 Networks for Lifelong Competence Development WP 9 Networks for Lifelong Competence Development WP 10 Networks for Lifelong Competence Development WP 2 Requirements & analysis of integr. systems WP 3 Technical Design & Implementation of integrated systems WP 4 Pilots with and Validation of the integrated systems Interfacing

WP 2 Requirements & analysis of integr. systems WP 4 Pilots with and Validation of the integrated systems WP 3 Technical Design & Impl. of integrated systems Tools Standards & Guidelines Development Environment

Technical TENCompetence Environment WP2 Services Existing Services Common Services Portlet Container Web Container Deliverables Technical TENCompetence Environment Process Container 1n + 12 Presentation Layer Business Process Integration Integrative Layer Service Layer Application Layer Technology Layer

1. Technical Architecture Steps: Design the software architecture and hardware infrastructure. Select IT standards (XML, UDDI, SOAP, …). Select out-of-the-box software (portal, application server, …). Set up development environment. Implement the software architecture and hardware infrastructure. Goal: To develop a first cut of an architecture that supports the agile integration of heterogenous tools and applications.

Technical TENCompetence Environment Portlet Container Web Container Deliverables Technical TENCompetence Environment Process Container

Questionnaire Goal: Provide information to the architecture design and the component selection process. Some possible items for the questionnaire: Used programming language(s). Available technical documentation. Overview of external interfaces. Can the component be used as open source. List of used third party components. Supported operating system(s) and hardware platform(s). … Architectural Constraints

Integrate Existing Common Service Components Steps: Inventory the requested common services. Prioritise the services. Search components with corresponding functionality. Assess the implementation impact per component. Implement components. Goals: 1. Select existing state of the art components. 2. Integrate selected components in the TENCompetence infrastructure.

Technical TENCompetence Environment Common Services Portlet Container Web Container Deliverables Technical TENCompetence Environment Process Container 1n + 12 Common Services

3. Construct Components Steps: Design and implement adaptations of existing “TENComponents” that are currently state of the art and corresponding WP2 Set up and maintain the infrastructure for the running pilots. Goal: Deliver the first version of the integrated TENCompetence System.

Technical TENCompetence Environment Portlet Container Web Container Deliverables Technical TENCompetence Environment Process Container Common Services WP2 Services Learning Services Common Services 1n + 12 Learning Services

Agenda LogicaCMG’s vision on competence development (Wouter Jan Smeulers) Work package 3 Technical design & Implementation of the Integrated system (Louis Maessen) –Objectives –Overall approach WP3 in more detail (Roland Ettema) Organisation (Louis Maessen) –Global time plan –Risks and measures –Preparation of the technical kick-off January 2006

Global time plan

Participants WP3 Open Universiteit (Netherlands) [5] Software De Base S.A. (Spain) [12] LogicaCMG (Netherlands) [15] Fundacio Barcelona media Universitat Pompeu Fabra (Spain) [6] Giunti Interactive Labs (Italy) [5] Centre for research and technology Hellas (Greece) [4] Universitaet Hannover (Germany) [4] Insead (France) [4] University of Bolton (United Kingdom) [15] Universiteit van Amsterdam (Netherlands) [1] Stichting Surf (Netherlands) [1] 72 person months (4 FTE average)

Main risks at WP-level - 1 Risk: –There is more functionality (or ambitious functionality) specified then could be developed with the available development capacity of WP3 Measure: –Use cases (or parts of use cases) will be prioritized (WP2, 5,6,7,8) A must, an important functionality, nice-to-have, cosmetic –Realize as much as possible functionality, starting with the functionality with the highest priority, within the available timeframe and development capacity –Remaining use cases (or parts of the use cases) will be realized in the next development cycle

Main risks at WP-level - 2 Risk: –Quality level of functional requirements (output WP 2,5,6,7,8) has strong impact on the quality of technical design and the further construction of the integrated system Measure: –Use RUP standard for documents and tailor the standard to the project needs –Perform quality review Accuracy, understandability, testability –Start drafting technical design when relevant findings are solved

Main risks at WP-level - 3 Risk: –Changes in requirements during setting up the technical design or construction of the integrated system frustrates development process Measure: –Use change management procedure –Prioritize changes (a must, an important functionality, nice-to-have, cosmetic) by submitter Determine impact (technical impact, effort, time plan) by WP3 Project management authorization for change

Preparation technical kick-off Presentation / demonstration about contributed application / tools Share common knowledge Availability of participants of WP3 and their skills Preference for WP3 activities: –Technical design and / or –Construction of the integrated system and / or –Technical validation

Summary LogicaCMG’s vision on competence development (Wouter Jan Smeulers) Work package 3 Technical design & Implementation of the Integrated system (Louis Maessen) –Objectives –Overall approach WP3 in more detail (Roland Ettema) Organisation (Louis Maessen) –Global time plan –Risks and measures –Preparation of the technical kick-off January 2006 QUESTIONS?

WP 3 - Technical design & Implementation of the Integrated system CONCLUSIONS

Conclusions - 1 Use tailored version of RUP for communication between work packages Open source inventory of architectural components (ASAP) –Setup WIKI environment including forms name component, function description, capabilities like integration abilities and legal issues

Conclusions - 2 Architectural visionaries (January meeting) –First version ‘Architecture’ (delivery 1) Existing components Extended initiatives –Second version “Berlin draw up” (delivery 2) –Units of learning –Learning activities Extend with ELF –Gap analysis (delivery 1 – delivery 2) Involved are WP2 and WP4 Digital Cinema Pilot

Conclusion - 3 Design a ‘ to build’: UML Component Diagram –Setup development environment –Prioritizing Integration level MOSCOW –Deliverable: reasonable to build architecture & project plan