11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel: 01244 657938

Slides:



Advertisements
Similar presentations
Carrier Pre-Select Meeting BT Systems Interface Roadmap
Advertisements

BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.
11 Simultaneous Provide. 22 Disclaimer: The information contained in this Presentation slide-pack is confidential information for discussion purposes.
Guide to using the roll out plans on BTWholesale.comBTWholesale.com.
Ofcom Consumer Switching
Ofcom Consumer Switching
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
Simultaneous PSTN and Broadband Provision Process Incorporating Broadband Movers Issue 5.
BT Wholesale Broadband Escalations Portal Adding or Retrieving Notes
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
BT Wholesale Ethernet Roadmap Release Update 6 th September 2012 Agenda: Re le ase AD – Shaun Harrison Release AE – Shaun Harrison eCo Plus enhancements.
1G MSIL SFOA1 Trial Update Week Ending: 04 April 2008.
Extension to Flexible Appointment Portfolio: More Focused Appointments (MFAs)
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
11 Ofcom Consumer Switching What does it mean for us all? Bev Bytheway-Jackson Product manager
Ofcom Consumer Switching
Title Consult 21 Mike Reed - Openreach Name 21 st February 2006.
These measures are applicable to the 20C Broadband Network. The information contained in this briefing is confidential as per your terms and conditions.
Roadmaps Andy Wright Natalie Walker Simon Brisbourne.
Issue: 1.1 on 23 rd April 2008 Code of Practice: Annex B Effective use of checker tools This document provides comprehensive guidance for CP/SPs regarding.
Best Practice Guide to Managing Inventories and Order Processes for Flexi Cease 28 January 2014.
Broadband Product Road Map 2012/13 H2 2013/14 H1 2013/14 H2 20C Fibre 21C Migration from 20C IPstream to 21C Wholesale Broadband Connect Release AK 17.
Thank you.
Adjustment & COCP Barbara Kwok Licensing Operations Specialist.
11 Ethernet Roadmap Release 21 January 2015 Jason Hopkinson
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Animated slides – showing jumpering changes and product architecture for WLR, LLU, SLU and GEA.
In conjunction with a subsidiary of BT BT PLUSNET PARTNER Managed expertly for you. With you in total control. In conjunction with a subsidiary of BT July.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
Clarity Phase 2 Push Trial Scope and Details July 2015.
CPS Acceptable Use Policy Day 2 – Technology Session.
GEORGIA ELECTRONIC CONVICTION PROCESSING SYSTEM 1 Georgia Electronic Conviction Processing System (GECPS)
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
BT Wholesale HARD TURN BACK When shouldn’t I call or request an escalation? There are several occasions when BT Wholesale receive requests on the phone/via.
Chapter 10 – Dissemination Ilaria Dimatteo United Nations Statistics Division The 4 th meeting of the Oslo Group on energy statistics Ottawa, Canada, 2-6.
Equal Access: Space, Power & Common Infrastructure – LLU and 21C Gary Williamson Openreach LLU Business Improvement Manager January 2006 Queries to
PPC Industry Forum, 5 March Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
BT Wholesale Ethernet Roadmap Release Update 9 th November 2012.
WBC Quality of Service (QoS) Options 23 rd October 2008 Andy Maddocks Dave Brennan Paul Fishburn Paul Burke.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
BT Wholesale Products June, SOR Management Tool Angus Flett John Skingle.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
PPC Industry Meeting 1 st December Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Data Dissemination Conditions in the European Statistical System (ESS) UNECE, Warschau May 2009.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
PPC Industry Meeting 24 th February Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
1G and 10G MSIL SFOA1 Trial Updates Week Ending: 13 June 2008 Beatrice Osborn Product Development, BT Design.
SDA Formulas Online webinar Tomika Moore Senior Chemist, Nonbeverage Products Laboratory September 13, 2012.
BAU + PoV Order Handling Process Geographic Numbers Business M/L & S/L LP=Reseller X EU LCP GCP Gaining Chain Losing Chain CLoA GP=Reseller Y PO+ CLoA.
Deposits refund process
Verification of Study Online
Business zone Ethernet – Ordering a Radio Survey
HB4034 – Duplicate Batch Process
Placing an order for Etherway Copper
Market Trials ChMC 8th August 2018.
Industry Best Practice Guide: Schedule 2, Part 1 Paragraph 2 Completing RAD 2: Step by Step Guide This document is to be used as a guidance on how to complete.
How to request access to a tool on the Openreach portal
0630R Review Group meeting 21 February 2018 Settlement Data topic
Release 3 Update 07th March 2018.
Business Zone – User Guide
Placing a Broadband Provide Order Version 1
How to Cancel a Broadband Order
How to raise a fault on Business Zone
Getting access to the Ethernet Diagnostics and Fault journeys on Business Zone BT Wholesale Online V3 LEGAL NOTICE: The information contained in this briefing.
Presentation transcript:

11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel:

22 Disclaimer The information contained in this Presentation slide-pack is confidential information for discussion purposes only and should not be disclosed without British Telecommunications plc. (BT's) permission. Please treat it accordingly and do not forward, republish or permit unauthorised access. Please note that BT has taken reasonable care to check that the information contained in this Presentation slide-pack is accurate at the time of issue, however, it is subject to change. In relation to any products/services referred to in this document which are currently under development and/or trial, BT gives no undertaking or other commitment that the product/service will be made commercially available. References to any such service and time scales contained within this document are indicative and estimates for information purposes only and these and other information do not constitute any contractual or other obligation. Applicable BT standard terms and conditions apply. © British Telecommunications plc., 2013 British Telecommunications plc. Registered office: 81 Newgate Street London EC1A 7AJ Registered in England no:

33 As part of the work that we are doing for Ofcom Consumer Switching we have to introduce mandatory RIDs for BT Wholesale Broadband products. The products impacted are IPstream, Wholesale Broadband Connect (WBC) and WBMC over IPstream Connect and WBC. The RID is a three-character alphabetic code which is used to identify the 'Gaining CP' (the party which has entered into a contractual agreement with the end user for provision of services). Ofcom own and distribute RID codes and are currently looking at whether the format of the RID needs to change. This will be dependent on the volume required across industry. What you need to do Please ASAP with details of how many RIDs you think you will need including RIDs for any resellers who have a contractual agreement with the end RID Reminder

44 How to request RIDs Ofcom are introducing a new online database system in mid-July which will significantly reduce the timescales for issuing RIDs. So they recommend that you request RIDs after this date. If you need to Request RIDs before mid-July please for an application form. Complete the form and return it to the same address. Your request will be processed manually and it could take up to three weeks for the code to be returned.

55 Openreach Early Delivery Options overlaid with BTW Plans

66 Cancel Other (Openreach Early Delivery Options 1 and 5) AP 13/09/14 AQ 15/11/14 AR 17/01/ /09/ /11/ /01/15 21CNCE Cancel Other for BTW to BTW migrations 21CNCE Cancel Other for BTW to LLU migrations Cancel Other for LLU to BTW migrations Option 1 : New Cancel Other Codes Option 5 : Full Support for LCP Cancel Other 1.BTW deploy Switched On BTW to BTW Migrations Cancel Other in Release AQ (only for use in agreement with BTW) 2.BTW deploy Switched On Cancel Other for BTW to LLU and LLU to BTW Migrations – full operability dependent on 2750 going Live one week later.

77 RID on SMPF Provides (Openreach Early Delivery Option 2) AP 13/09/14 AQ 15/11/14 AR 17/01/ /09/ /11/ /01/15 RID mandatory for IPstream and WBC ADSL Provide and Migration Orders RID Optional - validated if received 1.Release AP : BTW validate RID in any Broadband orders if present. Note that RID accepted (but not validated) currently. 2.From Release AQ RID is mandatory for BTW Provide and Migration orders 3.RID will be passed to Openreach, if received from CPs – up until Release 2650, Openreach will ignore RID 4.RIDs not mandatory in Openreach until June CNCE RID Optional for IPstream and WBC ADSL Provides and Migrations

88 Cancel Other with RID Notification to Gaining CP (Openreach Early Delivery Option 3) AP 13/09/14 AQ 15/11/14 AR 17/01/ /07/ /11/ /01/15 V26 Schema including RID notification to Gaining CP for SMPF deployed 1.The Cancelling CP RID will also be included in the ‘Unsolicited/managed Cease ‘ KCI, confirming to the Losing CP that the cease of the asset has been cancelled. 2.Assuming that OR deploy v26 schema in R2600 & R2700, BTW will consume this in Release AR and make the Cancelling CP RID available in Cancellation related KCIs 3.Both need a schema upgrade for CPs to consume but we are only mandating this from Release AR. The Cancelling CP RID will be included in ‘Provide Cancelled’ KCI The Cancelling CP RID will be included in ‘Cease Cancelled’ KCI for Unsolicited/Managed Ceases V27 Schema including RID notification to Gaining CP for FTTC deployed

99 SMPF and FTTC validation rules for Postcode/DN mismatch (Openreach Early Delivery Option 4) AP 13/09/14 AQ 15/11/14 AR 17/01/15 Postcode Mandatory for IPstream and WBC Provide and Migration Orders Postcode Mandatory and order rejected if incorrect 1.Postcode is an optional attribute today – if absent a value is defaulted into the order into Openreach 2.From Release AP, BTW will validate postcode if present, and return warning message if postcode incorrect. But order is sent to OR with the postcode from eMLC 3.From Release AQ the postcode is validated and the order is rejected if the postcode is incorrect. 21CNCE Postcode Optional for IPstream and WBC Provides and Migrations /03/ / /06/15