AMF2 ACAPEX Logistics Michael Ritsche/Amon Haruta AMF2 Operations ANL/LANL.

Slides:



Advertisements
Similar presentations
Welcome to the Award Winning Easiest to Use & Most Advanced View, Manage, and Control Security, Access Control, Video, Energy & Lighting Systems, & Critical.
Advertisements

OVERVIEW TEAM5 SOFTWARE The TEAM5 software manages personnel and test data for personal ESD grounding devices. Test and personnel data may be viewed/reported.
Software Quality Assurance Plan
AMF2 Instruments and Measurements: AOS The following instruments are planned to be deployed aboard the R/V Ron Brown: Aerosol Observing System (AOS) consisting.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Content Management Systems Why to use. And, if you’re going to use one, which one???
1CUL.PPT Last Revised: 10 June 2005 The Role of the Communications Unit Leader Developed as part of the National Emergency Services Curriculum Project.
Personal Software Process Overview CIS 376 Bruce R. Maxim UM-Dearborn.
SMS Gateway OZEKI NG Document version: v Adding SMS functionality to SysAid.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
1MRO.PPT Last Revised: 10 June 2003 Mission Radio Operator Skills and Requirements Developed as part of the National Emergency Services Curriculum Project.
Release & Deployment ITIL Version 3
Services Tailored Around You® Business Contingency Planning Overview July 2013.
SMS Gateway OZEKI NG Document version: v Adding SMS functionality to Sharepoint.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
November 2009 Network Disaster Recovery October 2014.
Powered by. Motus is an integrated web-based and mobile software platform that supports field work management and execution, giving employees necessary.
Continuity of Operations Planning COOP Overview for Leadership (Date)
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
INFO 637Lecture #31 Software Engineering Process II Launching & Strategy INFO 637 Glenn Booker.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
INFO 637Lecture #81 Software Engineering Process II Integration and System Testing INFO 637 Glenn Booker.
Chapter 8: Systems analysis and design
Software Testing Life Cycle
2014 Reliance Manufacturers Rep Meeting AGENDA: Customer Relations Overview Manufacturers Rep Expectations Overview Quarterly Review Discussion Commission.
Hands-On Microsoft Windows Server 2003 Administration Chapter 2 Managing Windows Server 2003 Hardware and Software.
Preceptor Orientation
City of Los Angeles Personnel Department Mobile Application Team 02:Shreya kamani Anushree Sridhar Pattra Thongprasert Abhishek Trigunayat Travis Jones.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Workshop Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Training, Operations.
OracleAS Reports Services. Problem Statement To simplify the process of managing, creating and execution of Oracle Reports.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
1CUL.PPT Last Revised: 10 June 2003 The Role of the Communications Unit Leader Developed as part of the National Emergency Services Curriculum Project.
© CCI Learning Solutions Inc. 1 Lesson 5: Basic Troubleshooting Techniques Computer performance Care of the computer Working with hardware Basic maintenance.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
Data Company Customer Interview. 2. Purpose and Quick Check The purpose of this interview is to determine whether 8020 can provide a useful service.
6 th Annual Focus Users’ Conference Manage Integrations Presented by: Mike Morris.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
ARM Aerial Facilities BAECC Kickoff Meeting Feb Aircraft Data Local Share Drive ARM IOPshare (at Oak Ridge) ARM IOPshare (at Oak Ridge) Corrections.
MAGIC Cloud Radars Karen Johnson First MAGIC Science Workshop 5/2014.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
SMS Gateway OZEKI NG Document version: v Adding SMS functionality to SCOM 2007.
Step 5: Complete Your Project. Setting the scene Suppose you have been running a project to write a small piece of computer software for a business. The.
Mr. Justin “JET” Turner CSCI 3000 – Fall 2015 CRN Section A – TR 9:30-10:45 CRN – Section B – TR 5:30-6:45.
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
Rob Davidson, Partner Technology Specialist Microsoft Management Servers: Using management to stay secure.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
| imodules.com Top 10 FAQ in Application Support Kelly Schmiedeler & Amber Quayle.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
University of Calgary Continuing Education Construction Contract Law and Documents Week 12 Changes Delays Claims Contract Documentation.
Implementation Review1 Archive Ingest Redesign March 14, 2003.
Day in the Life (DITL) Production Operations with Energy Builder Copyright © 2015 EDataViz LLC.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Priority PDA module overview Developed in conjunction with organisations who use field service engineers, carrying out on-site installs, repairs or maintenance.
ACES User Interface Workshop #1 Prototype Inspection 22. November 2011.
1 Important Factors in My Landing As suggested by Ed Schultz, I responded back their requirements with bullets of my experience. At first I thought I had.
AMF2 Installation on NOAA Ship Ron Brown – Overview – AMF2 Operations Team Argonne National Laboratory Los Alamos National Laboratory CalWater 2015 – ACAPEX.
IPitomy SIP Trunks 101 Programing and activating SIP Trunks with IPitomy’s assisted turn-up.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
LubeWatch® Oil Analysis Program
A Software Installation Duet
Container Yard / Gate Overview
SAFE WORK INSTRUCTIONS
The Role of the Communications Unit Leader
Series 5300 Lithium Cell Formation System
Presentation transcript:

AMF2 ACAPEX Logistics Michael Ritsche/Amon Haruta AMF2 Operations ANL/LANL

AMF2 & ARM Quick Overview  Distributed Project with various National Labs having specific roles –ANL, BNL, PNNL, ORNL, LANL, SNL, LBNL –Data Quality Office located in OU –Some mentors in Universities, other locations NREL, Rutgers, NOAA, UW, and many more.  ARM has fixed and mobile locations around the world and an AAF. –SGP in Oklahoma –TWP in Pacific, currently undergoing shutdown and relocation –NSA in Alaska, currently adding site in Oliktok –AMF1 in Brazil & AMF2 in Finland. –ENA in Azores is in process. –AAF is scheduled for ACAPEX/Calwater2  Management and Operations of sites are at specific Labs but overall support goes to a single location for all sites. –Example: ANL manages AMF2 and SGP but data collections and ingest for all sites handled by DMF at PNNL.

 We will require assistance from all ARM sections in order to deploy successfully –DMF, SDS, Mentors, XDC, VAP developers, Archive, Engineering, etc. –Some items require setting contracts (mentor), communications –Others require purchasing items, such as new data storage –Others require engineering, such as new mount systems for MAERI –Others require all three, integrating X/Ka Radars on marine pedestal  Multiple sites, ongoing deployments, Intensive Operating Periods (IOP’s), new site installations mean competing priorities. –We need to get in the cue now. This is an approved deployment but situations are evolving –AWARE deployment to Antarctica has almost all critical issues resolved and personnel assigned to tasks. –ACAPEX is mostly unknown. We are passing normal installation time limits ARM requires for successful installations. –Approval, dates, locations, details of ship are all unknown and have critical components. AMF2 & ARM Quick Overview

Horizon Spirit, Pacific Ocean Baseline Instruments: AOS ASSIST II-will be relocated BBSS BSRWP CSPHOT KAZR HSRL Marine MET System (maybe) MPL MWACR MWR MWR3C IRT SST Parsival Disdrometers PRP/SPN System (maybe) RPH/HPU SeaNav – Kearfott -> IXBlue HYDRINSIII TSI VCEIL NEW Instruments: MAERI Ka/X-SACR and Marine pedestal ACAPEX – Instrumentation

Horizon Spirit, Pacific Ocean MAGIC – Location of instruments

AMF2 Land to Marine back ground  MAGIC was AMF2’s first marine deployment  Two Months at ANL to reconfigure for ship.  Installation on Horizon Spirit –Two days in Port of LA then week to port of HI, one day in HI, week back to LA. –We did not have bi-directional comms while underway. Only in port by 3g/4g. Slower installation as mentor checks of systems only occurred in port Slowed trouble shooting, even with phone and text only s. –Some assistance by mentors on board (AOS, Radar, Stable Tables and Nav systems) –Installation was/is not limited to mounting systems/sensors and securing. It is the total process leading up to data collection and archive  We planned for three trips on Horizon Spirit before beginning of full operations. –9 total days for full access to systems by personnel while in port –6 total weeks most while underway before full operations –Limited to 6 people on the ship at a time while underway.  We will be reconfiguring from land deployment at end of BAECC –9 containers in Finland and most land based instrumentation. –Some of the marine based instrumentation and mounts at ANL, some at other labs. –Includes sending instruments to vendors/mentors for calibration, maintenance and in some instances, repair.

AMF2 Land to Marine Preparations & Operations  End of BAECC is Sep 15, –Begin reconfiguration for ACAPEX, re-routing of cabling, etc for systems coming on ship. –New data systems installation and set up of collections and local ingest and DQ plots. –Testing and setup of collections and ingest for systems that are in Finland –Leave the end of October/beginning November Depending on when AMF2 deploys on the ship, customs delays could prevent AMF2 from coming. All customs paperwork is in order but delays can and have been issues. We are prepared to fly from Finland to USA not using common carrier cargo ship. This will depend upon location of installation  Marine based systems will meet AMF2 at install location Planned second phase of testing and setup Integrating marine systems and new systems (SACR and pedestal) Deployment at install location on land mimicking expected set up on the Ron Brown as much as possible. This includes reconfiguring the AMF2 from 9 containers to the 4/5 that will be deployed on the ship.

AMF2 Critical Logistics Needs and Concerns  Critical needs-We need NOAA Logistics POC now –We need to determine the exact layout, ports of call for install/uninstall, power availability and communications. We need to visit the Ron Brown to get exact measurements. This must occur in the next couple of months or we run the risk of not getting required support items and mounts built and ready. Location of port of installation/uninstall. If we don’t have ports by June 1, we may not be able to secure pre-deployment integration location (warehouse) in time for deployment. We have multiple power requirements. Need to determine what we have to build for proper distribution. The contracts to build must be done ASAP. We must have bi-directional comms. If we need to bring our own system we need to investigate options and set contracts ASAP. –How much time for deployment on ship before it leaves berth? Land deployments take 2 months. Marine deployment minimum 2 weeks. Some systems may not run if we can’t power up and test prior to being underway. Some installations can not safely be done underway Time in port will also determine the number of personnel we will need to install. We need to get on specialists radar before they make other commitments.

AMF2 Logistics Needs and Concerns  Instrument deployment and container layout has dependencies –SACR positioning and size relation to mount structure on deck (17’ diameter) –Stair access to roof of containers to maintain instrumentation –OPS container has 2’ 9” deck to handle instrumentation on roof –At minimum it appears SACR and AOS must be near the front.

AMF2 Possible deployment on Ron Brown AOS SACR HPU MPL RPH OPS GP SACR

ACAPEX Important issues  Can we use Ron Brown’s Met data instead of deploying AMF2 MET?  Can we use the Ron Brown’s radiometric data instead of PRP?  Does the Ron Brown have SST data available? None noticed on web site.  BBSS system: ARM has scripts on DCIII to output data to historical format. –Different than standard output. –Can we load scripts, if not reprocessing will need to occur. Will need.dc3db files. –Need to know what version of software DCIII on ship is using.  All have VAP implications. Will need to task developer to use new data. Need info on measurements, frequency, averaging time, format and any corrections for motion.  We need a Data Coordinator/translator. Ruby to identify by the end of this meeting.