Using Synchrophasor Data to Diagnose Equipment Mis-operations and Health Alison Silverstein WECC JSIS Meeting, September 10, 2014 1.

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

WECC JSIS Update Dmitry Kosterev, BPA.
Questions about AVR & PSS
Speaker Scott Whaley - EIT Protecting & Ice Melting Westmans Distribution Lines.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
Reliability Challenges White Paper Victoria L. Ravenscroft Senior Policy Analyst W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
The Model Validation Story 1. You’ve heard this story before August 10, 1996 Accurate and up-to-date models are needed for reliable and economic grid.
New Energy Horizons Opportunities and Challenges Update on IEEE PC Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement.
2014 System Operator Conference 1 Protection System Misoperations: Why Should a System Operator Give a Hoot? April 17 & May 1, 2014 – Charlotte, NC September.
Synchrophasors: Improving Reliability & Situational Awareness
1 New Generation Commissioning Emal Latifzai Operations Support Engineer New Generation Information Forum ERCOT Public November 4, 2014.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 25,26 th, 2015 Salt Lake City, UT.
Introduction to Phasor Measurements Units (PMUs)
April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003.
1 U.S. Energy Information Administration, Annual Energy Review All energy input US average = 90.3 MWh per person, per year. Corresponds to 10.3 kW.
Software Engineering 2010 Project Ideas General Electric.
NASPI overview and update
Scottsdale, AZ September 26, 2012 Western Underground Fall Conference Scottsdale, AZ September 26, 2012 Existing Primary Cable Fault Locating and Testing.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
About Stratascope 2009 REVENUE ACCELERATORS. Copyright 2009 Stratascope Inc. All Rights Reserved Services Client Research Portal –Industries, Markets,
Synchrophasor Measurement Implementation in ERCOT
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
Golden Valley Electric Assoc. Inc © 2012 GVEA. All rights reserved. GVEA BESS Expected and Actual Performance Dan Bishop Golden Valley Electric Assoc Fairbanks,
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
1 U.S. Energy Information Administration, Annual Energy Review All energy input US average = 90.3 MWh per person, per year. Corresponds to 10.3 kW.
Alison Silverstein, NASPI Project Manager NERC Operating Committee
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
NERC Event Analysis Update Member Representatives Committee Meeting October 28, 2008 Robert W. Cummings NERC Director of Event Analysis & Information Exchange.
Level 2 Unit 3 Engineering Applications of Computers Engineering Diploma Level 2 Unit 3 Engineering Applications of Computers In this unit you will discover.
September 25, 2012 Planning Working Group - PLWG Sub-Synchronous Resonance Protection & Mitigation John Adams Principal Engineer.
SMS Update NERC Synchronized Measurement Subcommittee (SMS) Ryan D. Quint, Ph.D., P.E. Staff Coordinator, NERC SMS, SAMS WECC JSIS Meeting September 22,
NASPI Update Alison Silverstein NASPI Project Manager WECC JSIS meeting, September 21,
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
1.Mouths are quiet. 2.Begin the quick review section of your notes. 3.Raise your hand if you need something.
©2009 Mladen Kezunovic. Improving Relay Performance By Off-line and On-line Evaluation Mladen Kezunovic Jinfeng Ren, Chengzong Pang Texas A&M University,
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
November 16, 2012 Synchrophasor Meeting Dynamic Model Validation Project Jonathan Rose Engineer, Resource Integration Sidharth Rajagopalan Engineer, Dynamic.
DEMAS ENGINEERING SERVICES LIMITED. The Condition Based Monitoring maintenance Experts Our Vision To be the most sought after provider of high quality,
NERC Lessons Learned Summary LLs Published in September 2015.
Operating Topics Part 2 Mike Oatts May 9, 2008 Transmission Customer Forum Destin, Florida Part 2 Mike Oatts May 9, 2008 Transmission Customer Forum Destin,
Model Validation using PSS®E
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
ROSE Updates Marianna Vaiman, V&R Energy WECC JSIS Meeting Salt Lake City, UT September 9 – 10, 2014 Copyright © V&R Energy.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
WECC Joint Synchronized Information Subcommittee Report Planning Coordination Committee Meeting March 22,
ARM and GPS Based Transformer monitoring system with area Identification Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
1 PSSE Playback Model Validation with PMU Data Damien Sommer, P.E. Senior Transmission Planning Engineer.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Blackstart Hugh Francis Southern Company Transmission Customer Forum September 22, 2006 Hugh Francis Southern Company Transmission Customer Forum September.
Generator Condition Assessment through EMI Diagnostics Doble Power Services.
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
2017 WECC JSIS Report March 21, 2017.
Grid Operations Update
The Model Validation Story
Siemens Wind Turbine Weak Grid Option Modeling in PSSE WECC library Hongtao Ma, Siemens Wind Power Joergen Nielsen, Siemens Wind Power Good morning,
WECC Regional Standards Update
Compliance Report to ERCOT TAC February 2007
Project guide B. SUBBULAKSHMI M. E Assistant Professor C. A. R
NASPI PMU Data Application Classification
PSSE Playback Model Validation with PMU Data
2017 WECC JSIS Report March 21, 2017.
NASPI PMU Data Application Classification
Presentation transcript:

Using Synchrophasor Data to Diagnose Equipment Mis-operations and Health Alison Silverstein WECC JSIS Meeting, September 10,

Background and thesis of paper Background of paper Pulling this together under contract to DOE SGIG program, to extract insights from the SGIG-SGDP synchrophasor projects Process – review examples and stray mentions from NASPI presentations and conversations, find company experts to provide additional detail Thesis of paper Operating engineers are using synxr data to identify and diagnose a wide number of generation and transmission events. This off-line use is producing tremendous value in terms of potential equipment damage avoided and potential outages averted. By documenting the examples and the diagnostic and deductive processes used for each case, the entire industry can learn quickly and implement this great synxr value source 2

Mis-operations examples 1) Generator settings and generator equipment failures Cumberland nuke PSS setting (TVA) Malfunctioning generator PSS (NYISO) Redbud powerplant oscillations (OG&E) Malfunctioning generator AVR control system (NYISO) Voltage oscillations at nuclear plant (Dominion) Faulty generator control card (ERCOT) Protecting power system stabilizers (Manitoba Hydro) Colstrip control unit malfunction (EPG) Governor control malfunction in Alberta caused large power oscillations on California-Oregon lines (CAISO) 3

Mis-operations examples 2) Wind plants and oscillations Wind plant oscillations (OG&E) Wind controller software update flawed (ERCOT) Wind events and turbine controllers (ERCOT) 4

Mis-operations examples 3)Transmission equipment Failing potential transformer (ATC) Finding loose connections in potential circuits at fuses and terminal blocks (OG&E) Voltage transformer failing (Dominion) Identifying 69 kV arrester failure affecting customers (ATC) Voltage pull-downs linked to line communications carrier (OG&E) PQ monitoring (OG&E) Transmission-level fault analysis (NYISO) 5

Mis-operations examples 4)Proactive uses of PMUs for equipment installation and protection Monitoring system current imbalance to protect large power generator rotors (Dominion) Using PMUs to install and calibrate equipment (Dominion) 6

What happens next? Still collecting examples, writing paper, and fact-checking Paper to be released in October at CIGRE and NASPI mtgs Start outreach campaign at NERC, NATF, NAGF, JSIS, and more Would like to build a library of synxr data for these examples, that analysts can examine to look for event signatures for automated diagnosis – have asked WECC if we can use the formats and structure for their automated grid disturbance library to set up a separate data library for these small events (potentially hosted at PNNL) Look at OG&E automated event reports to see if these are share-able 7

Got good examples to add to the list? Please let me know asap, and be prepared to provide high- quality synxr data images and spend two 30 minute sessions on the phone with me to explain the event and then answer additional questions. Thanks!