Off Detector Electronics Upgrade. Outline Present schemes and features New schemes of nSYNC Technology 19/03/2014 S. Cadeddu - INFN Cagliari 2.

Slides:



Advertisements
Similar presentations
TDC130: High performance Time to Digital Converter in 130 nm
Advertisements

1 Calorimeter Trigger to L1-Board data transmission Umberto Marconi INFN Bologna.
JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
Muon Electronic Upgrade Data Format. 32 bits nODE Architecture: remarks Six 32 input channels nSYNC for each nODE Three nSYNC per GBT LLT implemented.
E-link IP for FE ASICs VFAT3/GdSP ASIC design meeting 19/07/2011.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
1 MTD Readout Electronics J. Schambach University of Texas Hefei, March 2011.
TDC in ACTEL FPGA Tom Sluijk Wilco Vink Albert Zwart Fabian Jansen.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
Off Detector Electronics System [LNF-INFN] 1 Off Detector Electronics System Fan Unit ODEODE 1 ODEODE 2 ODEODE 3 ODEODE 4 ODEODE 5 ODEODE 6 ODEODE 7 ODEODE.
CARIOCA (Cern and RIO Current Amplifier). The CARIOCA chip has 8 binary output, therefore DIALOG has 16 PCH as input channels and has up to 8 LCH as output.
Filip Tavernier Karolina Poltorak Sandro Bonacini Paulo Moreira
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
The GBT A single link for Timing, Trigger, Slow Control and DAQ in experiments A. Marchioro CERN/PH-MIC.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
23 February 2004 Christos Zamantzas 1 LHC Beam Loss Monitor Design Considerations: Digital Parts at the Tunnel Internal Review.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
C. Beigbeder Final design Review ECAL/HCAL Frond End  FE board : current prototype  Test results Qualification Clock adjustment Noise analysis  FE board.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
LHCb front-end electronics and its interface to the DAQ.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
NSYNC and Data Format S. Cadeddu – INFN Cagliari P. Ciambrone – INFN LNF.
Level-1 Data Driver Card (L1DDC) HEP May 2014 Naxos 08/05/2014HEP 2014, NAXOS Panagiotis Gkountoumis National Technical University of Athens.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Could we abandon the HW LLT option and save money (and allow possible further improvements to the upgraded muon system)? Alessandro Cardini of behalf of.
IB PRR PRR – IB System.
Ken Wyllie, CERN Tracker ASIC, 5th July Overview of LHCb Upgrade Electronics Thanks for the invitation to Krakow!
Standard electronics for CLIC module. Sébastien Vilalte CTC
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
Paolo Ciambrone INFN- LNF ODE ECS ODE ECS Off Detector Electronics for the muon system INFN - LNF Servizio Elettronica Laboratori Frascati A. Balla, M.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
Jun 18th 2009 SPECS system D.Charlet The SPECS field bus ACTEL APA 150 GLUE.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
C.Beigbeder, D.Breton, M.El Berni, J.Maalmi, V.Tocut – LAL/In2p3/CNRS L.Leterrier, S. Drouet - LPC/In2p3/CNRS P. Vallerand - GANIL/CNRS/CEA SuperB -Collaboration.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
LHCb Outer Tracker Upgrade Actel FPGA based Architecture 117 januari 2013 Outline ◦ Front end box Architecture ◦ Actel TDC ◦ Data GBT interface ◦ Data.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Control of ASICs via GBTx
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
Christophe Beigbeder PID meeting
TELL1 A common data acquisition board for LHCb
VELO readout On detector electronics Off detector electronics to DAQ
FPGA-based Time to Digital Converter and Data Acquisition system for High Energy Tagger of KLOE-2 experiment L. Iafolla1,4, A. Balla1, M. Beretta1, P.
NA61 - Single Computer DAQ !
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
DARE180U Platform Improvements in Release 5.6
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
PID meeting Mechanical implementation Electronics architecture
The LHCb Front-end Electronics System Status and Future Development
TELL1 A common data acquisition board for LHCb
Presentation transcript:

Off Detector Electronics Upgrade

Outline Present schemes and features New schemes of nSYNC Technology 19/03/2014 S. Cadeddu - INFN Cagliari 2

Present ODE implementation L0 front-end electronics stage 192 LVDS input signals 24 SYNC chips (on 3 types of piggy board) TFC system interface and clock management 1 optical receiver + 1 TTCrx chip 1 QPLL chip Tree network based on MC100LVEP family L0 trigger interface 12 GOL chips + 1 parallel optical transmitter Valid data L1 DAQ interface 1 GOL chip + 1 VCSel diode Valid data MHz FPGA board controller Flash RAM based Actel FPGA (ProAsicPlus) 3 buses (32 bit) for SYNC and GOL interfaces ECS interface 1 ELMB board –CANbus link on the backplane –2 I2C internal buses 6U Compact PCI card 10 layers motherboard with controlled impedance Mixed 5/3.3/2.5 V devices 19/03/2014 S. Cadeddu - INFN Cagliari 3 SYNC DAQ inter. TRG inter. TFC inter. GOL ECS inter. Controller

Present SYNC implementation 19/03/2014 S. Cadeddu - INFN Cagliari 4 TDC & Synchronizer: 4 bit TDC (1.5 ns 40 MHz) – DLL based. Custom Macro-cell. L0 Trigger Interface: Sends 8 synchronized hits along with the 2 LSB of the BX 40 MHz. Prog. buffer depth L0 buffer & Derandomizer: Based on the 128x27 SRAM blocks (CERN development – K. Kouklinas) Circular buffer of 256x54 SRAM. Initial R/W address programmable. FIFO of 128x54 SRAM The depth is programmable to 16, 32, 64 or 128. EDAC: Single Error detection and correction, Double Error detection. 7 bits code. Histogram Builder: 16 bins of 2 24 entries each. I 2 C Interface Used to R/W internal configuration. Configuration Registers are t riple voted and auto-corrected for best SEU immunity. All other registers are triple voted Trigger link test L1 link test

SYNC 1.0: The present … 19/03/2014 S. Cadeddu - INFN Cagliari 5 L0 Buffers Derand TDC’s VDD GND 8 LVDS Input Output to L1 electronics GOL output GND I2CI2C I2CI2C I2CI2C CTRLS SYNC pins 4x4 mm 2 QFP 14x pins IBM 0.25  m RadHard

ODE upgrade specs Design new boards (nODE), almost “plug & play” with current ODEs –No need to touch cables from chamber to crates –Same transition boards (no crate re-cabling) –Single type of board for all stations/regions Use new GBT and versatile link components to implement trigger, DAQ, TFC and ECS interfaces –Optimized number of links to the L0 Muon trigger Maintain the trigger unit information on the same link Possible implementation in the TELL40 –Read TDC 40 MHz rate –No more need to maintain present TFC and ECS systems Use a new custom ASIC (nSYNC) to integrate all the required functionalities –Clock synchronization and Bx alignment –Time measurements and histogram capability –Zero suppression algorithm and buffering –Test facilities and diagnostic –Trigger, DAQ, TFC and ECS interfaces via GBTx Guarantee enough flexibility to increase granularity and reduce channel occupancy –Possible IB boards replacement in the high occupancy zone –Possible chambers replacement in low granularity zone 19/03/2014 S. Cadeddu - INFN Cagliari 6

nODE Architecture 19/03/2014 S. Cadeddu - INFN Cagliari 7 nODE DATA Path Sync nSYNC Bunch cross synchr. TDC Hit format Hist. GBT interf. Zero Supp. GBT interf. ECS/TFC LVDS Receivers Translators GBTx Hit data serializer VTTx Optical transmitter GBT-SCA Control Monitor VTRx Optical transceiver GBTx Data Ser/Des VTTx Optical transmitter GBTx Hit data serializer Sync nSYNC Bunch cross synchr. TDC Hit format Hist. GBT interf. Zero Supp. GBT interf. Sync nSYNC Bunch cross synchr. TDC Hit format Hist. GBT interf. Zero Supp. GBT interf. Sync nSYNC Bunch cross synchr. TDC Hit format Hist. GBT interf. Zero Supp. GBT interf. LVDS Receivers Translators Sync nSYNC Bunch cross synchr. TDC Hit format Hist. GBT interf. Zero Supp. GBT interf. 192 Input channels Power section Voltage regulators DC/DC converter Power up sequencer Clock management Clock driver Phase adjust Sync nSYNC Bunch cross synchr. TDC Hit format Hist. GBT interf. Zero Supp. GBT interf. GBTx TDC data serializer GBTx HIT data serializer To TELL40 Links simplex To Trigger links simplex To/from TFC 1 link duplex

nSYNC Architecture 19/03/2014 S. Cadeddu - INFN Cagliari 8 TDC + Histogram builder: 4 bit TDC (1.5 ns 40 MHz) 16 bins of 2 24 entries each. The counts stop when any of the bins saturates. Dead time free in hit capture. Muon Trigger TELL40 Interface: Sends synchronized hits every machine cycle (40 MHz). Prog. buffer depth to guarantee the synchronization between different nSYNC sending data through the same GBT TDC ZS: Zero Suppression of TDC’s data not related to hit events. TDC TELL40 Interface: Sends synchronized ZS TDC data every machine cycle (40 MHz). Prog. buffer depth to guarantee the synchronization between different nSYNC sending data through the same GBT I 2 C Interface: Configure through the ECS. Triple-voted configuration

SYNC 1.0 vs nSYNC 19/03/2014 S. Cadeddu - INFN Cagliari 9 8 ch vs 32 ch Histo for each TDC No more needs for RAM’s + EDAC TDC data ZS 97 pins vs 220 pins

Why an asic Modularity: we are thinking at three possible modularity (32, 48, 96 channels), to best fit the requirements for: –Power consumptions (less then 20mA per channel) –Best ZS for TDC data An eye on LS3 stage: If we go to design a new detector with higher granularity for at least M2R1 and M2R2 (and maybe for the same regions of M3 too), we have also to design a new front-end electronics and a new front-end board where we can integrate the nSYNC direct on the detector. 19/03/2014 S. Cadeddu - INFN Cagliari 10

Technologies IMEC DARE (Design Against Radiation Effects) technology: Radiation-hardened-by-design libraries in standard commercial technology –DARE180 well supported (UMC.18) –DARE90 small core & IO library available(UMC 90nm) Manufacturing, Packaging, Testing, Characterization (lot) Qualification & Radiation test up to FM is supported by imec’s ASIC Services –Through subcontractors (Microtest, Maser, MAPRAD) Flexible solution –DARE allows for mixed signal design Can add specific analog blocks; designed by customer, design house or imec Encrypted models of library cells can be used in analog design ervironment. –Cells can be added to the library –IO pads can be customized... Imec has expertise on the full DSM design flow They tested DARE digital blocks up to 1 MRad without failures or leakage current increases. SEU performance is in the order of a LET cross-section of 48/60 Mev. 19/03/2014 S. Cadeddu - INFN Cagliari 11

Technologies DARE UMC 180 Family 19/03/2014 S. Cadeddu - INFN Cagliari 12 IO at 3.3 and 2.5 V pads: - 70x x110 - custom All FF’s have scan equivalents+ Fillers & Corners + Customer Requests + Additional Analog IP developed by an external design house (DAC, ADC,...)

nSYNC: work in progress I 2 C interface: Designed and tested in another chip for a INFN gruppo 5 experiments. PLL and Delay lines: These are the main crucial parts for the TDC implementation as well as the GBT interfaces that needs a different frequencies from the master clock. They are under study and develpment in another INFN gruppo 5 experiment (alldigitall) 19/03/2014 S. Cadeddu - INFN Cagliari 13

All Digital PLL An ADPLL include a DCO instead of a VCO In most architecture the DCO=DAC+VCO In other case the DCO is based on effects of analog components The aim of ALLDIGITALL experiment is to realize a true DCO, portable on different technologies (FPGA, ASIC), integrable in a flow fully digital 19/03/2014 S. Cadeddu - INFN Cagliari 14

DCO in 130nm technology Frequency Range (1.3 – 25.5) ns (770 – 39) MHz LSB95 ps DNL(+/- 13) ps 19/03/2014 S. Cadeddu - INFN Cagliari 15

DCO in 130nm technology Frequency Range (0.75 – 39) ns (1250 – 26) MHz LSB150 ps DNL(+/- 10) ps 19/03/2014 S. Cadeddu - INFN Cagliari 16