DS3 Programme Status Update JGCRP 12/11/2014 Robbie Aherne.

Slides:



Advertisements
Similar presentations
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Can Today's Demand Response Programs Support Integration of Renewable Energy.
Advertisements

Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
Network Code on Operational Planning & Scheduling DSO Associations views on the final version of 27 February 2013 Jorge Tello Guijarro, Member of DSO Technical.
Seite 1 “Wind Power Plant Capabilities: Operate Wind Farms Like Conventional Power Plants” K. Rohrig, B. Lange, A. Gesino, M. Wolff, R. Mackensen, J. Dobschinski,
The future Role of VPPs in Europe Pan European Balancing Market: EU-FP7-Project eBadge Workshop on DSM Potentials, Implementations and Experiences 20 th.
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
PISA FOR DEVELOPMENT Technical Workshops Components and input for ToR of the International Contractor(s) 9 th April 2014 OECD Secretariat 1.
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
Slide 1 Large Wind Integration Challenges for Operations / System Reliability By : Steve Enyeart, BPA With contributions from: Bart McManus, BPA Roy Ellis,
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
Joint Grid Code Review Panel POR Working Group Meeting 2 27 th March 2015 Chairperson : Michael Preston.
Power Systems Consulting and Software 4 March 2004 BWEA Conference: UK Offshore Wind 2004 Integration of Offshore Wind Farms into the Local Distribution.
Stewart Reid – SSEPD Graham Ault – University of Strathclyde John Reyner – Airwave solutions NINES Project Learning to date.
1. Large wind farms are typically located where good wind resources exist, and are often far away from the main load centres and strong AC network connections.
NATIONAL GRID Market Evolution in Ireland APEX 2004 Annual Conference Ann Scully Manager, Market Operations ESB National Grid.
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Grid Compliance and Wind turbines in weak and Island grids –
Houston Area Dynamic Reactive Project March 11,
DSU Commissioning and Testing Process
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
GCRP – DS3 Update 11 th February 2015 Robbie Aherne.
Voltage grid support of DFIG wind turbines during grid faults
Integration of the German Offshore Wind Power Potential into the Electricity Supply System B. Lange, Ü. Cali, R. Jursa, F. Schlögl, M. Wolff, K. Rohrig.
Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
DSU Modifications Séamus Power 12 November 2014 – EirGrid GCRP Meeting.
Smart Grids: Ireland’s Unique Opportunity Doireann Barry, Smart Grid Programme Manager.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
Managing a Power System with 40% Wind Dr Alan Rogers EirGrid.
Renewables and System Services Ann Scully.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
A Sustainable Future Powered by Electricity DS3 Workshop EAI Perspectives 14 th October 2013.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Draft of Terms Of Reference For Hiring a Consultant “Study for establishing the regulation and tools in implementing of DG connection to distribution network”
Delivering for 2020 TSO Facilitation of Renewables Studies EirGrid Customer Conference Jonathan O’Sullivan October 2009.
Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 12 th June, 2013 CER Offices Dublin.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
- 1 - Presentation reference Demand Side Bidding - an IEA Development Project for Competitive Electricity Markets Presentation to Metering Europe 2002.
Smart grid project - interim report - Interim report for the 6th Steering Group Meeting of the Priority Area 2 Budapest,13 June 2013 The project is supported.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
This project has received funding from the European Union’s Horizon2020 research and Innovation programme under grant agreement No
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
GC0104 – Demand Connection Code (DCC)
Agenda TSOG 8th November
Transposition of European Network Codes
DS3 and Qualifier Trials Update
Implementation of Connection Network Codes The French process
Grid Code Development Forum – 6 September 2017
Grid Code Review Panel 16th August 2017
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
Intelligent Power Module
EU-IPA12/CS02 Development of the Renewable Energy Sector
Implementation of Connection Network Codes The French process
12th IEEE PES PowerTech Conference
Enduring Solution – Stage 2 (ES-S2)
Jim Mcintosh Director, Executive Operations Advisor California ISO
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

DS3 Programme Status Update JGCRP 12/11/2014 Robbie Aherne

DS3 – Shaping the System of the Future System Services Frequency WSAT DSM Performance Monitoring Grid Code Control Centre Tools Model Dev. & Studies Voltage Renewable Data ROCOF

DS3 - Changing DS3 Areas System Performance System Policies System Tools

DS3 - Changing DS3 Areas System Performance System Policies System Tools

System Performance System Services DSM Performance Monitoring Grid Code ROCOF

RoCoF CER decision paper April 2014 UR decision paper May 2014 Generator Studies Project TSO-DSO Implementation Project Alternative Solutions Project

Generator Categorisation TSOs’ assessment of prioritisation based on: –Run hours (existing/forecast) –Constrained-on –Priority dispatch Generator Capability studies to begin shortly 7

Alternative Solutions Project 8 Range of theoretical options assessed at a high level via weighted scoring matrix approach Subset of viable options (2 to 3) selected for Phase 2 analysis Phase 1 (5 months) More detailed review of the viable options from Phase 1 Analysis focused on technical and financial aspects of each option Phase 2 (13 months) Joint project by TSOs Communication with industry via DS3 Advisory Council and website

System Services DS3 System Services Procurement Design –Competitive Multi Bid Auction and Regulated Tariff Decision paper by end of 2014

Demand Side Management DSU Grid Code Working Group –4 modification approved by the Ireland GCRP –Further consultation on frequency requirements and performance monitoring –SONI consultation on Grid Code modifications ESBN and NIE expressed concerns about impact of DSUs on their system security Work on identifying and removing barriers to service provision close to completion DSU 150 MW AGU 85 MW Powersave 10 MW STAR 45 MW Economy 7 Night Saver

DS3 – Shaping the System of the Future Frequency Voltage Renewable Data

Realising Potential of DSO Generation Transmission 110kV Distribution 33kV TSO-DSO Engagement

Voltage Control 2025Power Factor of TYPE B Wind CAUTEEN MVAr CAUTEEN WP0.95 Leading145 WP0.98 Leading105 WPUnity Power Factor55 WPVoltage control ± ESBN implemented TSO-DSO agreed changes at Cauteen wind farm cluster Interim measure to improve voltage stability in the area Wider reactive compensation studies underway –Value of DSO windfarms: significant off setting of transmission reactive compensation requirements

Operational Studies Voltage Dip Induced Frequency Dip (VDIFD) studies – due mid Nov Ramping policy study and tool – due end 2014 Minimum no. of conventional generation – complete * High SNSP Report – H complete * High wind speed shut down report – complete * Automated approach to large scale dynamic studies using Plexos – pilot complete

DS3 – Shaping the System of the Future WSAT Control Centre Tools Model Dev. & Studies

CCT and WSAT CCT Wind dispatch tool went live in Belfast on 24/07/2014 –DCC Constraint –Developer Outage –High Frequency/Min Gen –RoCoF/Inertia –SNSP Issue –Test – Developer –Test – TSO –Transmission Constraint WSAT Validation of dynamic model performance underway – (1) tuning and (2) cross validation using real events