RRAT – Dredging Update  Gilbert Island Post Construction  Flex Pipe Update  Flex Pipe use  2014 Dredging Update  Dredge Master Plan.

Slides:



Advertisements
Similar presentations
GIWW Gloria Appell, SWG. St. Marks, FL to Brownsville, TX.
Advertisements

UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia River Channel Port Sutton Channel TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia.
US Army Corps of Engineers BUILDING STRONG ® RIVER RESOURCES ACTION TEAM BOAT TRIP Upper Mississippi River (Pools 24, 25, and Mel Price) St. Louis District.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
Civil Works Baltimore District River and Harbor Projects.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
DREDGING YOUR DOCKS 2014 Organized By CRA Hydrographic Surveyors Orion Marine Group.
PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM.
Lake Como Rehabilitation City of Bloomer Joseph M. Dorava, PE - Vierbicher Associates Bloomer Community Lake Association and Bloomer Rod and Gun Club Public.
Presenter Name Presenter Title Duty Location Date of Presentation US Army Corps of Engineers BUILDING STRONG ® US Army Corp of Engineers BUILDING STRONG.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
CRFS Technical Meeting LC Operations Update November 8, 2011.
US Army Corps of Engineers BUILDING STRONG ® Upper Mississippi River Restoration Strategic Plan Kat McCain, Ph.D. – USACE Kirsten Mickelsen.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
MONTHLY RIDERSHIP AND FINANCIAL PERFORMANCE UPDATE October 17, 2013 RELATED TO AGENDA ITEM W2.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Dredging Engineering: Building & Maintaining Underwater Highways
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
Virginia Employment Commission report to The Commission on Unemployment Compensation James Ellenberger, Deputy Commissioner Virginia Employment Commission.
Prof. Mike Young Research Chair, Water Economics and Management The University of Adelaide Water Where is your future headed?
 LOCATION: -Located on the left side of Thi Vai river, 5 km from the confluence of Cai Mep Thi Vai and 29.7km (18 NM) away from the “ zero” bouy of Vung.
Cowichan Lake Storage Assessment – 2015 Final Results Craig Sutherland, M.Sc., P.Eng. July 27, 2015.
Water use in Irrigated Agriculture Ana Ramirez. Irrigated agriculture produces 40% of the food crops uses 70% of all water withdrawals (Huffaker 2003)
PAIU Workgroup Meeting School-Based ACCESS Program February 7,
February 2012 Steven D. Johnson Farm & Ag Business Management Specialist (515)
Harbor Maintenance and Dredging: A Legislative Update CAPT Bill Diehl, USCG (Ret.), P.E. President Greater Houston Port Bureau.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
Josh Metz, Associate Planner Regional Urban Design Guidelines Update to FORA Board September 19, 2014.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
BUILDING STRONG ® PORTLAND DISTRICT 1 The Dalles Dam Emergancy AWS Backup Water Supply P&S FFDRWG Meeting, 4 Feb Pat Duyck Project Manager.
Structuring Species Closures that Work for Fishermen Kate Quigley Council Economist Ad Hoc Committee on Socio-Economic Impact of Yearly Closures July 24,
Port of Hood River Recreation Committee Meeting April 2, 2007 By: Andrew Jansky, P.E. Flowing Solutions Images are property.
1 Update on Medicare Data Collection & Analysis February 2016 Data contained in this document represent analyses prepared by HSCRC staff based on data.
Educational Activities about the Upper Mississippi River Angela Freyermuth US Army Corps of Engineers, Rock Island District.
BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District November 29 th, 2012.
The Boardman: A River Reborn Removing Dams for a Free Flowing River.
January 2009 Phase IVB Construction Photographs by Brent Anderson.
Sector San Diego Area Committee and Incident Management Division Update RRT9 June 27, 2012.
Customer Select Supply/Storage
Update on PI Modeling and Nitrogen Removal at Blue Plains
DORSET Water System Information Meeting
Highlights of the New NPDES Permit
<workgroup name>
St. Louis District Biological Opinion RRAT
Mid-West Electric Consumers Association
Springbrook Estates Sewer Improvement Area Informational Meeting
Customer Select Supply/Storage
Albeni Falls Dam Operations
Dredging Operations Low Water Dredging Operations:
Presentation to Makenzie River Basin Board June 6, 2018
Due Dates subject to change. Watch for dashboard updates.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Presentation by Graham Kissack
Harbour Island Force Main Replacement
IT Managed Services Transition Weekly Activity Report: May 28th, 2019
IT Managed Services Transition Weekly Activity Report: May 14th, 2019
IT Managed Services Transition Weekly Activity Report: May 21st, 2019
Soybean Outlook and Risk Management Update
Design and Engineering Services
Athletic Field Improvements
Presentation transcript:

RRAT – Dredging Update  Gilbert Island Post Construction  Flex Pipe Update  Flex Pipe use  2014 Dredging Update  Dredge Master Plan

Gilbert Island, Mile 298 UMR Recent Dredging History 2005 – 2010 Total 510k CY, Average 101k CY, Average 7 days Chevrons constructed 2011 No Dredging after construction Estimated savings $300k to $500k.

Flex Pipe - Update + Completed Thomas N. George Spill Barge + Quick Connect Demo, & in use. - Need 6 more quick connects. - Need swivel ball joint at spill barge - Off season storage

Flex Pipe - Use + Mel Price Pool – all 7 dredging locations (221, 227, 229, 235, 237, 240, 241) + Lower River Planned at mile 173 Possibly mile 24 & other assignments until cold weather Buffalo Island mile 25 – 26 + Lower River 2013 Manskers, 104 – 103 UMR, Sep k into Chevron at 104, 200k into Island

Dredge Potter Flex Pipe Fixed Point Placement Allows Potter to reach preferred placement areas. Avoid sensitive habitat areas Create islands vs sidecasting

2014 Dredge Update Dredge Potter – Mel Price Pool, 1 Aug 2014 – 27 Aug, 854k CY. 7 locations: 221, 227, 229, 235, 237, 240, 241. – Pool Aug – 1 Sep. 222k CY. Miles 252, 256, 270 – Lower River (Open River) 1 location complete, mile 169. High water delays. Dredge Bill Holman (LRL Contract) SEMO Port, 3 – 6 September, 64k CY. Kaskaskia Mouth, 7 – 13 September, 109k CY. Dredge Goetz (St. Paul District) Illinois Waterway, 26 Sept to approx 13 Oct, (mile 79 – 75) 2013 Quantities: Potter 6.6M CY, America 1.5M CY

2014 Dredge Update High Water delays, only 1 assignment completed to date, mile 169 UMR, on Lower River Schedule Impacts (Only 1 location complted to date)

Dredge Master Plans + July 31 st Meeting with USFW, MDOC, IDNR + Documented preferred placement for routine dredging areas. + Identified dredging areas for flex pipe use. -Need to finalize, working on template.. -ILW Master Plan.