RAM VII Training Summit

Slides:



Advertisements
Similar presentations
U Development of Reliability Program Standard GEIA-STD-0009 SE Summit March 2009 Approved for Public Release; Distribution is unlimited.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Define & Compare Flowcharts of Each Method Tom Delong.
1 1 UNITED STATES ARMY EVALUATION CENTER Chris Wilcox US Army Evaluation Center Mission-Based T&E Primer v1.3, 2.
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
Software Measurement and Process Improvement
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Segment Two: Business Requirements Drive the Technical Updates January 26-27, 2012 Idaho ICD-10 Site Visit Training segments to assist the State of Idaho.
EADS TEST & SERVICES TS/EL/T N°08_04/08 Page 1© Copyright EADS TEST & SERVICES 2008 Engineering Process for Systems Testability Analysis. Presentation.
Introduction to Software Quality Assurance (SQA)
Unit I Module 2 - NAVAIR RCM Policy and Organization
Test Organization and Management
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
Software System Engineering: A tutorial
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
THE AFMC MOASP Air Force Materiel Command D. Brian Morris HQ AFMC/PKV (937) I n t e g r i t y - S e r v i c e - E x.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
IT Requirements Management Balancing Needs and Expectations.
DEVELOPMENTAL TEST & EVALUATION DT&E – From Concept to Combat Integrated Test Process Darlene Mosser-Kerner Developmental Test & Evaluation OUSD(AT&L)/Systems.
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
1 Doc # USAMC LOGSA--Supporting Warfighters Globally U.S. Army MaterielCommand US AMC LOGSA Parts Management Plan Builder 29 April 2008.
Enterprise Systems Architectures EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2012.
LOG 101 Curriculum Review 16 Jul 04 Richard A. Andrews, CPL Course Manager.
Request for Proposal (RFP)
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
Continuous Learning Module (CLM) Status Update Defense Acquisition University.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AIR FORCE CAUCUS John Heliotis AF DepSO.
RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.
US Army Corps of Engineers BUILDING STRONG ® Greg Mellema Hydropower Master Plan (HMP) Operations Division Omaha District 08 Dec 2015.
DEFENSE LOGISTICS AGENCY SELF- DECLARATION PROCESS VALIDATING THE EMS: James Wood, P.E., EMS-LA Linda Baetz, EMS-LA US Army Center for Health Promotion.
12-CRS-0106 REVISED 8 FEB 2013 BAI (Build, Acquire, and Implement) CDG4I3 / Audit Sistem Informasi Angelina Prima K | Gede Ary W. KK SIDE
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Date: 25 Sep 12 Presented by: Steve Watts Team Leader Aviation and Missile Research, Development and Engineering Center Presented to: MRL Government /
How the NCSX Project Does Business
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
Creating Complete UID Solutionsby Creating Complete UID Solutions by Bridging the Gap… Creating Complete UID Solutionsby Creating Complete UID Solutions.
1 Overview of SAE’s AS6500 “Manufacturing Management Program” David Karr Technical Advisor for Mfg/QA AFLCMC/EZSM
Condition Based Maintenance Plus (CBM+) Overview
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Distribution Statement A – Approved for public release by OSR on 10/23/2014, SR Case # 15-S-0128 applies. Distribution is unlimited. DAU Symposium 4/27/2016.
Business, Cost Estimating & Financial Management Considerations
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
SQA project process standards IEEE software engineering standards
Today’s Summary Tab 4 Tab 6 Tab 2 Tabs 3 and 5 Defense Acquisition
Requirements Executive Overview Workshop Requirements Management Certification Training Mr. Matt Ghormley.
Requirements and Acquisition Management
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
System Engineering Considerations (See Chapters 3 and 9)
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
DAG Chapter 4 Systems Engineering Design Considerations
ISA 201 Intermediate Information Systems Acquisition
SQA project process standards IEEE software engineering standards
Terminal Learning Objectives
Requirements and Acquisition Management
Overview of SAE’s AS6500 “Manufacturing Management Program”
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Raytheon Parts Management
Product Support Considerations
Mission Command Center Excellence Directorate of Training
Mission Command Center Excellence Directorate of Training
Society of Reliability Engineers
System architecture, Def.
Software Reviews.
Presentation transcript:

RAM VII Training Summit Presented to: RAM VII Training Summit The Westin Huntsville, Alabama Reliability, Availability, and Maintainability including Testability and Software Reliability Policy Updates IAW DoD Directive 5230.24, DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Presented by: Robert S Smith and Judy M. Potter-Shields General Engineers U.S. Army Aviation and Missile Research, Development, and Engineering Center Date: 4 November 2014

Purpose/Contents Purpose Contents Provide an update to the RAM community of DoD R&M Engineering Activities Contents Policy Guidance Standardization

Reliability, Availability, Maintainability and Cost (RAM-C) Rationale Report

RAM-C Format Executive Summary RAM-C Report and Timing Sustainment Rationale Description of Sustainment Parameters Operational Mode Summary/Mission Profile Product Support Strategy Verification Assessment Feasibility Assessment Summary Introduction – Purpose, Changes, and Preparers Purpose Changes RAM-C Preparers Sustainment KPP/KSAs/APAs Overview and Program Data Sustainment Metrics Operational Information

RAM-C Format Assessment of Sustainment Parameters Tradeoff Analysis Definitions Sustainment KPP/KSA/APA Verification Operational Availability (AO) Verification Materiel Availability (AM) Verification Mission Reliability Verification O&S Cost Verification Verification Summary Sustainment KPP/KSA/APA Feasibility Sustainment Metrics Feasibility O&S Cost Feasibility AO and AM Feasibility Feasibility Summary Tradeoff Analysis Summary

Army Regulation (AR) 702-3

AR 702-3 Important AR 702-3 Reminders: A RAM-C report is required by the Army for any program with RAM requirements. The DOTE FDSC policy* has been implemented in Army policy. * 10-05-12 Independent Operational Test and Evaluation (OT&E) Suitability Assessments

Standardization & Data Item Descriptions (DIDs)

Standardization Update Data Item Descriptions (DIDs) What is DID situation as it relates to R&M? What is available for R&M DIDs including testability and SW Rel? Do gaps exist in those DIDs for R&M policy? What solutions are the best to fill those gaps?

Initial DIDs Reviewed Failure Modes, Effects, and Criticality Analysis Report DI-ILSS-81495, Failure Mode Effects, and Criticality Analysis Report, 30 Oct 1995 and Validation 10 Sep 2014 Failure Summary & Analysis Report DI-RELI-80255, Failure Summary and Analysis Report, 17 Oct 1986 Reliability & Maintainability (R&M) Allocation Report DI-RELI-81496, Reliability Block Diagrams and Maintenance Models Report, 30 Oct 1995 validated on 10 Sep 2014 R&M Block Diagrams and Mathematical Models Report R&M Predictions Report DI-RELI-81497, Reliability Prediction and Documentation of Supporting Data, 30 Oct 1995 validated on 10 Sep 2014 R&M Program Plan DI-SESS-81613, Reliability and Maintainability (R&M) Program Plan, 1 Aug 2001 DI-MNTY-81600, Maintainability Program Plan, 08 Feb 2001 DI-ATTS-81270, Testability Program Plan, 12 Jun 1992

Standardization Update - Solutions Data Item Descriptions (DIDs) Determined that new/updates to R&M DIDs were needed for Failure Modes, Effects, and Criticality Analysis Report Failure Summary & Analysis Report Reliability and Maintainability (R&M) Allocation Report Reliability and Maintainability (R&M) Block Diagrams and Mathematical Models Report Reliability and Maintainability Predictions Report Reliability and Maintainability (R&M) Program Plan

DID Current Status Failure Modes, Effects, and Criticality Analysis Report New DID developed Failure Summary & Analysis Report New DID Developed R&M Allocation Report DI-RELI-81968, Reliability and Maintainability (R&M) Allocation Report, 10 Jul 2014 – NEW released R&M Block Diagrams and Mathematical Models Report Reliability and Maintainability Predictions Report R&M Program Plan DI-SESS-81613A, Reliability and Maintainability (R&M) Program Plan, 15 Jul 2014 – Updated

Overarching DID Policy Overarching DID policy updates: Enclosure 12 of DoDM 4120.24, Defense Standardization Program (DSP) Procedures, dated 24 Sep 2014 covers DIDs MIL-STD-963C, Data Item Descriptions (DIDs), dated 24 Sep 2014

Division Statement of Work (SOW) Tool

Statement of Work (SOW) Tool PROTOCOL SOW Tool located at “RAM Task Advisor” tab https://extranet.amrdec.army.mil/Protocol/Default.aspx ED/RAM is in the process of updating the RAM SOW tool Plan tasks: Update SOW task wording Update DIDs listing Update Life Cycle Acquisition Phases Update Criticality Update Optional System Characteristics

RAM-C Rationale Report AR 702-3 Standardization – DIDs RAM SOW Tool Summary Provide a quick status overview to the RAM community RAM-C Rationale Report AR 702-3 Standardization – DIDs RAM SOW Tool

? Questions?