Bridge Projects PCEF Meeting Dover, DE Aug 25, 2009 Troy M. Jenkins, P.E. Chief Engineer Northeast Prestressed Products, LLC.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
8621 Georgia Avenue Silver Spring, MD
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
WA 2.ID 3.MT 4.OR 5.CA 6.NV 7.UT 8.WY 9.CO 10.AZ 11.NM 12.AK 13.HI 13 The West`
PCI Northeast Bridge Technical Committee Standards for Accelerated Bridge Construction Including the Northeast Extreme Tee (NEXT) Michael P. Culmo, P.E.,
SHRP2 Project R04 Bridge Designs for ABC
Spliced Precast Girders
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Bridges Engineering Design Mrs. Hodgson. Materials Steel Steel Beams Beams Cables Cables Connections Connections Concrete Concrete Roadway Roadway Beams.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Construction Contractor Series #3: Experiences with ABC Projects in Massachusetts.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
Folded Plate Bridge: Steel Alternative for Short Span Bridges Maury Tayarani Accelerated Bridge Program MassDOT.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
Optimising Precast Bridge Girders for Sustainability With the use of High Performance Concrete Doug Jenkins - Interactive Design Services Leigh McCarthy.
CHAPTER 2 SECTION 1 “OUR POLITICAL BEGINNINGS”. BASIC CONCEPTS OF GOVERNMENT Ordered Government Limited Government Representative Government.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
Name that state !Name that capital ! What would you like to practice?
Types of Bridges Photos by J.S. O’Connor. Steel Multi-Girder.
C. C. Fu, Ph.D., P.E. The BEST Center
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Doug Jenkins - Interactive Design Services
MA, GA, NY, NH, VA, NC, PA, RI, DE, MD, SC, CT, NJ Tuesday 09/08
Engineers and bridges. Just the facts The four main factors are used in describing a bridge. By combining these terms one may give a general description.
DIFFERENT TYPE OF BRIDGES
National TIM Responder Training Program Implementation Progress - As of February 8, 2016 Train-the-Trainer Sessions 203 sessions with 7,306 participants.
Bridge Engineering (2) Bridge Forms 1. *Introduction 1.1 Beam bridges (Dongming YR Brdg)Dongming YR Brdg 1.2 Arch BridgesArch Bridges 1.3 Cable-supported.
Presented By: Marvin Burns, PE Janssen & Spaans Engineering, Inc.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Top 3 European countries? 1.England/Britain 2.France 3.Spain.
Totally Precast Concrete Bridges
What would you like to practice?
Latinos and Blacks Living in States that Expanded Medicaid Coverage Under the ACA Are Less Likely to Be Uninsured Percent adults ages 19–64 who were uninsured.
Offsite manufactured Bridges
House Price
A Brief Introduction to Wastewater Treatment
Train-the-Trainer Sessions 240 sessions with 8,187 participants
House price index for AK
Up to 100% Funding of Vertical Construction Cost When Land is Owned
Representation -Congress
AASHTO OC LRFD Survey LRFD Scoreboard LRFD Scoreboard
LRFD Scoreboard LRFD Scoreboard LRFD Scoreboard
Train-the-Trainer Sessions 386 sessions with 11,336 participants
Non-Citizen Population, by State, 2011
Totally Precast Concrete Bridges
IAH CONVERSION: ELIGIBLE BENEFICIARIES BY STATE
Train-the-Trainer Sessions 394 sessions with 11,460 participants
Net metering is available in
Historical Life Cycle Costs of Steel & Concrete Girder Bridges
S Co-Sponsors by State – May 23, 2014
Employer Premiums as Percentage of Median Household Income for Under-65 Population, 2003 and percent of under-65 population live where premiums.
Employer Premiums as Percentage of Median Household Income for Under-65 Population, 2003 and percent of under-65 population live where premiums.
Average annual growth rate
Train-the-Trainer Sessions 250 sessions with 8,352 participants
Train-the-Trainer Sessions 402 sessions with 11,649 participants
How State Policies Limiting Abortion Coverage Changed Over Time
Train-the-Trainer Sessions 402 sessions with 11,649 participants
Start-Up Activity Map Monday
By: Clarence Fragoso and Jonathan Lopez
Employer Premiums as Percentage of Median Household Income for Under-65 Population, 2003 and percent of under-65 population live where premiums.
Train-the-Trainer Sessions 401 sessions with 11,639 participants
Train-the-Trainer Sessions 416 sessions with 11,878 participants
Train-the-Trainer Sessions 429 sessions with 12,141 participants
Presentation transcript:

Bridge Projects PCEF Meeting Dover, DE Aug 25, 2009 Troy M. Jenkins, P.E. Chief Engineer Northeast Prestressed Products, LLC.

PCEF – Bridge Projects by State PA: 20 Bridges 471 Beams DE: 1 Bridge 14 Beams MD: 11 Bridges 106 Beams NJ : 3 Bridges 80 Beams NY: 11 Bridges 165 Beams VA: 5 Bridges*676 Beams MA : 6 Bridges 101 Beams RI : 2 Bridges 35 Beams CT : 1 Bridge 12 Beams *582 beams listed as one bridge project.

PA Bridges Alternate Designs: 6 Bridges – 255 Beams Latest Alternate Project: – 4 Contractors Bid Concrete Alternate – 0 Contractors Bid Steel As-Designed – Contract price $101,558,000 – Bridge price $ 56,487,262 Design Build : 3 Bridges – 96 Beams Latest Design Build: Contract PriceBridge Price – PCEF Solution – $16,280,860$7,008,800 – Steel Solution – $17,697,000 $8,204,498 Savings $ 1,416,140$1,195,698 Work In Progress: Splice Girder Standard – Starting with Simple Span designs.

NJ – Precast Substructure

NYSDOT Deck Bulb Tee

VA – Post Tensioned Arch

Private Bridge in Massachusetts

Other Projects KY – 3 Span Box Beam – 132ft Radius CT – PCEF Beams = NEBT – Full Depth Precast Deck Panels MA – 3 Span Splice Girder (PCEF)