Examples of Context Sensitive Solutions in an Urban Environment ITD Project Development Conference April 7, 2005 Doug Camenisch, P.E. Parametrix.

Slides:



Advertisements
Similar presentations
City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy
Advertisements

Downtown Access Improvements Plan Town of Hillsborough 2014.
Urban Design Audit Downtown Torrington, CT. P = Peripheral Connectivity Connectivity to Surrounding Districts: Logical and efficient traffic flow, linkages.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
West Contra Costa Unified School District
Context Sensitive Solutions Idaho Case Studies ITD Project Development Conference April 7, 2005 Dick Jacobson, P.E. Senior Project Manager CH2M HILL.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Contact: Beth Morris
Hallandale Beach Community Redevelopment Agency Budget Overview Fiscal Year
Slide 1. Slide 2 Introduction How did you get to school as a child?
Midtown Alliance Capital Improvements Program
PROJECT KICK-OFF Jason Collins, Ph.D., P.E., AICP October 14, 2008.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Yorktown Civic Association Neighborhood Conservation Plan Update March 2006.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
VISION FOR A KEARNY TOD February 27, 2008 Rob Lane Regional Plan Association.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
Fundamental Methods for Building More Walkable Communities Mark Fenton Pedestrian and Bicycle Information Center University of North Carolina.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
2701 Barnard Way Santa Monica Pier OCEAN LODGE HOTEL 1665 Ocean Avenue 20’ R.O.W 2701 Barnard Way APN: Barnard Way APN:
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
HIKE ASPEN FALLS Guide to hiking and walking paths in and around our city.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Long Beach Parklet Program Downtown Achievement Awards: Public Space.
Community Development Department Construction Phase.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
Phase 2: 30% Design Plans September 4 th, 2012.
Community Development Department Construction Phase BULLDOG DRIVE.
Grand Canalscape Phase I and II General Update October 30, 2015.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Civic Institutions Private development Parks & Squares Transportation & Downtowns Bus stops Main Streets (outdoor displays, streetscapes, cafés) Local.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
STATE ROAD 100 CRA Update to City Council November 13, 2012 Workshop.
Omaha CSO Gilmore Avenue Sewer Separation South Omaha Neighborhood Alliance May 17, 2012.
SAFE ROUTES TO SCHOOL: INFRASTRUCTURE DESIGN TO CONSTRUCTION.
Complete Streets Training
A PRESENTATION BY THE DISTRICT 1 COMMUITY COUNCIL SIDEWALK TO BATTLE CREEK REC.
Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
City of Redmond: Northwest Redmond & U.S. Highway 97 Plan - October 11, 2006 What Makes a Great Neighborhood.
Urban Design and Livability Bruce Monighan AIA Urban Design Manager, City of Sacramento City of Sacramento Planning Academy March 16, 2016.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
La Plaza Vieja Neighborhood Plan Transportation Commission Meeting Wednesday, September 30, 2015 Sara Dechter, AICP City of Flagstaff Comprehensive Planning.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
City of Prairie Village 75 th Street Mission Road to State Line Road.
8 th Ave S 2016 Pedestrian Improvements South Park Neighborhood Association David Allen, Sue Byers, Alisa Arment April 12, 2016.
Complete Streets Training Module 4b – Designing for All Users.
Urban Street Design Standards Overview of Project and Details
District 3 Complete Streets Projects
SE 12th Street Roadway Improvements February 8, 2005.
SW 6th Ave. – Fairlawn to Gage
State Aid Standards Development
Meadow Lake Boulevard Street Extension Project
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

Examples of Context Sensitive Solutions in an Urban Environment ITD Project Development Conference April 7, 2005 Doug Camenisch, P.E. Parametrix

Curtis Road Extension 15th St. West ParkCenter River Crossing Vicinity Map

Hill Road State Street (US44/55) Chinden Blvd. (US20/26) Garden City Boise Boise River Existing Curtis Road Elementary School Fairview Ave To I-I84 Curtis Road Extension Pre-Construction 2-lane arterial Residential & commercial area High volume intersections

Curtis Road Extension New alignment through existing row of houses (22 houses relocated) Separated pedestrian path Bicycle lanes Landscaping and lighting Designed for future widening

Chinden Blvd. (US20/26) Original Curtis Road Location Elementary School Fairview Ave Curtis Road Extension Constructed Project Neighborhood connectivity Frontage road School warning flashers Continuous sidewalks Privacy fences Separated walking path

Arterial School Frontage Road Curtis Road Extension Project Features Meandering Sidewalk Retained Trees

Historic Wall Constructed Wetland & Pond Curtis Road Extension Project Features Gateway Art

West ParkCenter River Crossing New river crossing & arterial Extensive public involvement Commercial and residential area

West ParkCenter River Crossing New pathway Access to public park Neighborhood connectivity

West ParkCenter River Crossing Improved access to businesses Improved private street circulation

West ParkCenter River Crossing Roadside Hazards Breakaway trees? Flexible walls?

15th Street Constructed Project Historic district Neighborhood gateway Community plan Phased construction

15th Street Project Features

Curb bulb-outs Sidewalk treatment

Lessons Learned Consider non-traditional design approaches Actively involve stakeholders during the design process Balance stakeholder input with prudent design Budget for additional time and expenses during design and construction Maintain constant communication with stakeholders Consider construction phasing impacts

Doug Camenisch, P.E. Parametrix Boise, ID (208) For Additional Information: