Capital Improvement Program City of Warren, Ohio April 2012.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Human Powered Delray All Streets should be complete streets February 5, 2015 FDOT Transportation Visioning.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Titusville to Edgewater Bike Loop PD&E Study
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
The Great Ohio Lake-To-River Greenway PICTURE THIS…. An 100 mile-long green band of protected open space running through fertile farmlands, lush woodlands,
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Conference Center of the Americas US SOUTHERN COMMAND
U.S. 33 Northern Connector Alternative
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Contact: Beth Morris
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
We start at Stars and Stripes Park Hefner Lake, South by ball diamonds– here we have a group gathering, instructions, distribute maps. Head.
CTP1 Lane/Road Closures beginning 12/27/ W Vickery Blvd 12/27/11 Road closed between Forest Park and Summit 15 th Ave 12/27/11 Road closed at IH30 turn.
PROPOSED HPD BIKE-PED MASTER PLAN HPD PRESENTATION.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
Traffic Engineering Teaching Kids the ABC’s of Traffic Engineering The Chattanooga School Outreach Program.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
West Northern Lights Boulevard – Sound Barrier Improvements August 16, 2006 Meeting Purpose: A Forum to Share and Gather Information The Municipality of.
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Current Construction Projects Major Projects Pinellas County.
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
San Juan Greenway WJI PRODUCTIONS Cycling and Walking Centennial Trails Project.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
The Main Street Bike Lane Project LADOT Bike Program.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Madison Avenue Reconstruction Department of Planning and Development.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
City Manager Report – May, 2016 Presented to: Minot City Council City Manager Report – May, 2016 Presented to: Minot City Council Lee Staab, City Manager.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
Arizona Forward Update
Department of Public Works 2017 Infrastructure Projects
Bicycle Lanes for the City of Boston
Scranton/Carter Road Reconstruction
Est. Begin Construction
Urban Renewal and Tax Increment Financing
Capital Improvement Program
Highway 169 Bridge Replacement & Pavement Resurfacing
Housing + Neighborhood Resource Summit
Bicycle and Pedestrian Update to City Council
Orange Grove Boulevard Complete Streets Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Sprague Avenue Phase II Survey Results and Next Steps
Metropolitan District | mndot.gov
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Capital Improvement Program City of Warren, Ohio April 2012

Parkman Road Improvements Phase 1 (2008) - $2 million Phase 2 (2011) - $1 million Phase 3 (2014) - $3 million Parkman Road Bridge (2012) - $4.6 million Collective Cost = Over $10 million

Parkman Road Improvements – Phase 1 Constructed 2008 – 2009 West Market Street to west of Linda Drive NW $2 Million 100% funded through ODOT and FHWA

Parkman Road Improvements – Phase 2 Constructed in 2011 Southern Blvd. north to City Limits $1 Million 100% funded through ODOT and FHWA

Parkman Road Improvements – Phase 3 Scheduled for 2014 Linda Drive to Southern Blvd. New 5 lane roadway with left turn lanes between Southern Blvd. & Coit Ave. NW to eliminate left turn accidents. $3 Million 80% funded through ODOT and FHWA

Parkman Road Bridge Project Is currently under construction – 2012 Bridge Replacement Left turn lanes at Tod Ave. & Lovers Lane $4.6 million Traditional ODOT Project Local Share is $28,000 (1/2% of total cost)

Warren Boulevard Bridge Project This year US 422 Bridge Replacement Over railroad between Logan and Chestnut $2 million Traditional ODOT Project 100% funded through ODOT and FHWA

Between 2003 and 2009 there were 25 accidents on Lovers Lane. 21 of the 25 accidents were single car failure-to-control accidents. Lovers Lane Reconstruction

Lovers Lane – Phase 1 Reconstructed a vertical curve by cutting existing hill near the Warren Twp. Cemetery

Lovers Lane – Phase 1 Visibility and safety was improved by paint striping, guardrail, signage and clearing vegetation.

Lovers Lane Reconstruction – Ph 1 Resurfaced from West Market Street to Williamsburg Street. Also resurfaced and striped portions of: Southern Blvd. Paige Ave. Perkinswood Blvd Phase 1 - $400,000 – Issue 2

Lovers Lane Reconstruction – Ph 2 An 800 foot section near Starlite Drive will be reconstructed to new grade. New guardrail, signage, paint striping, and clearing of vegetation along the roadway.

Lovers Lane Reconstruction – Ph 2 Resurfacing from Williamsburg Street to Parkman Rd. Also resurfacing portions of: Southern Blvd. Perkinswood Blvd. Atlantic St. Laird Ave. Berkshire Dr. Harvard Dr Phase 2 - $900,000 – Issue 2

CBD Road Projects: TRU- Park Ave. Will be constructed this summer (2012) Fulton Street to the northern city limits. Cost is $650,000 ODOT/FHWA and Issue 2 Funding (100%).

CBD Road Projects Continued: 1. South Street & Summit Street Resurfacing 2011 (Traditional ODOT) Cost $1 million 2. TRU - High Street Resurfacing Project 2010 Cost - $365, TRU – 45 (Mahoning Ave.) Reconstruction 2010 Cost - $475, TRU - East Market St. Reconstruction 2008 – 2009 Cost - $1.8 million

Upcoming Federal Projects Niles Road - $550, Pine Avenue - $900, Palmyra Road, Highland Ave. & Main Ave. - $2 million West Market St. - $2.5 million Collective Cost = $6 million

Requesting Federal & State Funds: Youngstown Road Reconstruction Laird Ave. to Ridge Road $4 million Youngstown Road Resurfacing Ridge Road to North Road $1 million

Decorative Crosswalks (2009 & 2010) Mahoning Avenue Lighting (2010) Warren Boulevard Trees (2011) Community Signs (Future Project) Gateway Improvements

City Sign Ordinance The City of Warren is presently reviewing its sign ordinance and discussing adoption of new regulations.

Greenway Bike Trail Phase 1 (2011) - $1.2 million Phase 2 (2012) - $1.4 million

Trails through Bullhead Park (Footbridge) Stone retaining wall repair at Packard Park Trails along river at Burbank Park Trails through the Lovers Lane parklands Overlook at the Mahoningside Property FHWA – $1.1 million – 2012 or 2013 Riverwalk Project

Capital Improvement Program The opportunity to present the City of Warren’s Capital Improvement Program is greatly appreciated. We look forward to implementing the plan and serving the citizens of the community. Thank you.