23 October 2003Matthew Warren - Trigger Module Update - RAL1 CALICE CIRC BE-FPGA Trigger Module Update Matthew Warren University College London 23 October.

Slides:



Advertisements
Similar presentations
17 Copyright © 2005, Oracle. All rights reserved. Deploying Applications by Using Java Web Start.
Advertisements

Clock and Control Status Matt Warren, on behalf of Martin Postranecky.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 4 December 2008 Martin Postranecky Matt Warren, Matthew Wing.
First Tests of a GTL-Prototype-Card using XDAQ S. Kostner, J. Strauss and A. Taurok (Hephy, Vienna) with help from J. Gutleber (CERN)
New Corporate Identity Poster Design Cavendish Laboratory, Department of Physics, University of Cambridge Maurice Goodrick, Richard Shaw, Dave Robinson.
HEP UCL Cambridge University Imperial College London University of Manchester Royal Holloway, University of London University College London Matthew Warren,
Clock module for TB spring 2012 Uli Schäfer 1 R.Degele, P.Kiese, U.Schäfer, A.Welker Mainz.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Trigger System Functions Master/Slave Operation –Located in Readout Boards’ BE-FPGA, but only active as Master in one slot. –Master controls asynchronous.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
Uli Schäfer, Mainz Univ. / ATLAS L1 Calorimeter Trigger ATLAS L1 Calorimeter Trigger / DCS ATLAS L1 Calorimeter Trigger Overview Signals monitored by DCS.
Kapi’olani Community College Art 128 Interface Programming 1 In-class Presentation Week 13B.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 JEM Test Strategies Current plan: no JTAG tests at R&S  initial tests done at MZ Power-up / currents Connectivity tests (JTAG) per (daughter)
Uli Schäfer JEM hardware / test JEM0 test programme Mainz standalone RAL sub-slice test JEM re-design Heidelberg slice test.
Travis Chen Senior Developer 10 Nov 2011 MS Dynamics CRM 2011 Integration with SharePoint.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
Tuesday, March 28, 2000 Connecting the MLC9000 to the Allen Bradley SLC500 via Modbus.
Template v4 September 27, Copyright © Infor. All Rights Reserved. 1 Time Track Payroll Schedule Configuration Development Team.
28 June 2004 ATLAS SCT/Pixel TIM FDR/PRR Martin Postranecky TIM OVERVIEW1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics.
ATLAS SCT/Pixel TIM FDR/PRR 28 July 2004 Interfaces to ROD Crate Components - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane,
The 6713 DSP Starter Kit (DSK) is a low-cost platform which lets customers evaluate and develop applications for the Texas Instruments C67X DSP family.
Clock module (and other hardware) - questions rather than answers - post Palaiseau / pre DESY nach dem meeting ist vor dem meeting Uli Schäfer 1.
5 Feb 2002Alternative Ideas for the CALICE Backend System 1 Alternative Ideas for the CALICE Back-End System Matthew Warren and Gordon Crone University.
Diagnostic & Troubleshooting Date 06/09/00, Page 1 Diagnostic & Troubleshooting s.
HEP UCL Cambridge University Imperial College London University of Manchester Royal Holloway, University of London University College London Matthew Warren,
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
ATLAS SCT/Pixel TIM FDR/PRR 28 July 2004 Changes TIM-2->TIM-3A->TIM-3B - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane, Martin.
Mainz hardware activities - clock module for TB spring R.Degele, P.Kiese,U.Schäfer, A.Welker Mainz Uli Schäfer 1.
ATLAS SCT/Pixel TIM FDR/PRR 28 July 2004 Firmware - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane, Martin Postranecky TIM Firmware.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
11 October 2002Matthew Warren - Trigger Board CDR1 Trigger Board CDR Matthew Warren University College London 11 October 2002.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
21 March 2007 Controls 1 Hardware, Design and Standards Issues for ILC Controls Bob Downing.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
2 4 Dec 2008C+C Crate Layout CC Master TCLKA TCLKB RX17 TX17 RX18 TX18 RX19 TX19 RX20 TX20 (wired-OR) Bunch Clock FE Clock (99MHz) Trig (Start) EncClock.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Stephen Childs Trinity College Dublin &
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Disk Layout/Productization Proposal Ron Rechenmacher and Geoff Savage.
Microsoft ISA Server 2000 Presented by Ricardo Diaz Ryan Fansa.
10 July 2003Matthew Warren - Trigger Module Update1 CALICE ‘FEDROB’ BE-FPGA Trigger Module Update Matthew Warren University College London 10 July 2003.
US Status of GbE Peripheral Crate Controller Ben Bylsma EMU meeting Fermilab, October 21, 2005 Section 1: Hardware Section 2: Firmware Development.
Industrial Controls Engineering Department Proposals for an Improved CERN PXI Support First CERN PXI Users Group meeting - 19 th October H. Reymond.
EbiTrack Architecture Version 1.0 September 24, 2012.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Status Report #4 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect October 8, 2012.
K. Harrison CERN, 22nd September 2004 GANGA: ADA USER INTERFACE - Ganga release status - Job-Options Editor - Python support for AJDL - Job Builder - Python.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
6 November 2003Matthew Warren - Trigger Module Update - RAL1 CALICE CERC BE-FPGA Trigger Module Update Matthew Warren University College London 6 November.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
Vishwakarma government engineering college Prepare by. Hardik Jolapara( ) LCD Interfacing with ATmega16.
GUI Programming In Java Sagun Dhakhwa BIM, HSM. GUI Appllications Event Driven OOP Uses objects of Classes like in any other Java programming.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
CALICE Readout Board Front End FPGA
Avaya Aura Core Components Integration
Comments on the DAQv2 advancement
CDR Project Summary and Issues
John Lane Martin Postranecky, Matthew Warren
UK ECAL Hardware Status
Digital Atlas Vme Electronics - DAVE - Module
M. Krivda for the ALICE trigger project, University of Birmingham, UK
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
Status Report #5 LYRA The Remote Accessible Automated Camera Stand
First thoughts on DIF functionality
Presentation transcript:

23 October 2003Matthew Warren - Trigger Module Update - RAL1 CALICE CIRC BE-FPGA Trigger Module Update Matthew Warren University College London 23 October 2003

Matthew Warren - Trigger Module Update - RAL2 Progress Code continues to grow - Trying to finalise a structure for the BE-FPGA Looking at BE-FPGA pin-out control - Suggest single list, web accessible. Setting up structures for CVS - Directory tree/.cvsignores - Stand alone components Looking at a test system configuration - External trigger generator (via back-plane) - Full Read/Write Trig Test Interface (more later)

23 October 2003Matthew Warren - Trigger Module Update - RAL3 Trigger Inteface Test System Called TrigITS! Built on Dev-Board Stand-alone Real Trigger code testing - LVDSOUT to LVDSIN Connect to backplane via test connector. Register access via RS232 RS232 level translation for other modules

23 October 2003Matthew Warren - Trigger Module Update - RAL4 CALICE OctNovDecJan Trigger Interface Test System Trigger Pass-through Internal/Stand Alone Funcs Main Functions VME Access Header Data Testing ZEUS, ATLAS, Holiday Schedule