Southeastern Region Transmission Planning Preliminary 2010 Base Case Assumptions.

Slides:



Advertisements
Similar presentations
NedPower Mount Storm Project Update for Grant County September 25, 2007.
Advertisements

Southeastern Region Transmission Planning 2009 SERTP Economic Studies.
1 April 27, 2011 Southeast Tornado Event System Operator Conference September and September 25-27, 2012 Memphis, TN Rocky Williamson, SOS Chair Operations.
East Pelham TS Project Alabaster SS 2009 W-1 E. Pelham – Alabaster SS 115kV TL.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
STORMWATER MANAGEMENT PROGRAM UPDATE July 23, 2014.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
What’s New in Southern Companies’ OATT Southern Company Transmission 2008 Customer Forum.
The Five Themes of Geography A Framework for Studying the World
ERCOT PUBLIC 10/21/ LTSA Update October 21, 2014.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
Georgia KIDS COUNT 2007 Briefing Information Embargoed Until July 25, :00 a.m.
Rocky Mountain Area Transmission Study RMATS Economics Reference Cases Economic Comparisons Distribution of Economic Gains and Losses RMATS Steering Committee.
Rocky Mountain Area Transmission Study Transmission Projects Recommendations to RMATS Steering Committee June 9, 2004.
ISO Grid Planning Presentation to CREPC October 1, 2002
Capital Region Sustainability Plan: Public Forums Round 1 July 23-25, 2012.
Regions of Georgia. GPS Standard SS8G1 The student will describe Georgia in regards to physical features and location. b. Describe the five geographic.
No. 1 Georgia’s Geography SS8G1 The student will describe Georgia with regard to physical features and location. (a, b, c, d)
Coal as a Future Generation Fuel Chris M. Hobson S enior Vice President and Chief Environmental Officer December 3, 2009.
Transmission Planning at the California ISO September 10, 2015.
Ajay Rajkumar, Chair Joint Opening Plenary IEEE Session #7 Media Independent Handover Services Atlanta, Georgia Ajay Rajkumar
ERCOT PUBLIC 4/22/ RTP Inputs and Assumptions April 22, 2014.
SPP.org 1. Southeastern Inter-Regional Planning Update (SIRPP) Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
Research Center for Energy &Environment Case study on Quang Tri wind power project and the needs for capability development Dr. Nguyen Duc Minh Dr. Nguyen.
“The Body” A Tiny Town Mystery. 5th Ave 4 th Ave 3 rd Ave 2 nd Ave 1 st Ave Zero St. Anteater Black Bear Cheetah Dolphin Elephant Rd. Ct. St. Rd. Hwy.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Generation Adequacy Task Force Update to WMS November 18, 2009.
GEORGIA SOLAR ENERGY ASSOCIATION’S 2013 SOLAR SUMMIT September 19, 2013 GEORGIA WATER WITHDRAWAL AND CONSUMPTION FOR ELECTRICITY GENERATION John Gornall,
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
Energy Business Solutions Michigan IRP Working Group Meeting July 25, 2005.
Rocky Mountain Area Transmission Study Overall Economics of Alternatives Steering Committee Meeting April 29, SLC.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
Feedback from Interoperability Workshop: Graham Worsley and David Calder TSA Conference 15 November 2011.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
2008 Annual Five Year Plan Update 4 For RPG-CREZ Meeting 12/14/2007 Department of Regional Planning Harry Liu.
LTSA Scenario Development Workshop
Megaregions: Memphis MPO At-A-Glance
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
2017 ACEA Annual Conference
Population Forecast Program Team
Insert Your Poster Title Here
Insert Your Poster Title Here
Insert Your Poster Title Here
I Insert Your Poster Title Here
I Insert Your Poster Title Here
I Insert Your Poster Title Here
Grade one First term Second term Learning unit Learning unit
I Insert Your Poster Title Here
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Clair Moeller Mid-Continent ISO
Insert Your Poster Title Here
I Insert Your Poster Title Here
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
Insert Your Poster Title Here
I Insert Your Poster Title Here
Strategic Improvement Planning A Continuous Improvement Model
I Insert Your Poster Title Here
Statistical overview of approved INTERREG IIIC operations - All zones - July 2005.
Southeastern Regional Transmission Planning Process
Insert Your Poster Title Here
My Place in Space.
Presentation transcript:

Southeastern Region Transmission Planning Preliminary 2010 Base Case Assumptions

Southeastern Region Transmission Planning

Southeastern Region Transmission Planning Regional Assumptions Wansley Tenaska Rumble Road #1 CC Kemper Rocky Mtn Vogtle McDonough West Georgia Farley Dahlberg East Bainbridge Hancock CC Washington Co CT SOWEGA Appling Co Bio Warren Co Bio Central AL McIntosh Harris CC Existing Generation Future Generation Note: Resources indicated are preliminary. As remaining assumptions are provided, this information will be updated accordingly.

Southeastern Region Transmission Planning YearSiteMW 2010Dahlberg CT (SoCo) 292 Dahlberg CT (GTC) -185 Tenaska, Heard County (SoCo) 942 West Ga. Gen (GTC) 160 Rocky Mtn (GTC) 45 Wansley #7 CC (GTC) 409 Rocky Mtn (SoCo) 15 Preliminary Generation Assumptions for the 2010 Transmission Expansion Planning Process YearSiteMW 2011Rocky Mtn (GTC)44 Rocky Mtn (SoCo)15 Farley 1 Uprate (SoCo)25 Lindsay Hill CC (GTC)200 McDonough Coal 2 (SoCo)-251 McDonough CC4 (SoCo)840 McDonough CC5 (SoCo)840 Walker Park (MEAG)42 Wansley #7 CC (GTC)166 East Bainbridge (GTC)6 McIntosh 4 & 5 (PS)448 Red Text = No Longer a Resource Assumption Note: Resources indicated are preliminary. As remaining assumptions are provided, this information will be updated accordingly.

Southeastern Region Transmission Planning Year Site MW 2012 McDonough CC6 (SoCo) 840 Walker Park (MEAG) 42 Farley 2 Uprate (SoCo) 25 Wansley #7 CC (GTC) 409 WashingtonCo CT (GTC) 551 Murray II (SoCo) -620 McDonough Coal 1 (SoCo) -250 YearSite MW 2013SOWEGA (GTC)90 Central Alabama CC (SoCo) 885 West Ga. Gen (GTC) Dahlberg CT (SoCo)-292 Dahlberg CT (GTC)235 Kemper (SoCo)600 Wansley #7 CC (GTC)97 Appling Co Bio (GTC)100 Warren Co Bio (GTC)100 Walker Park (MEAG)42 Baconton CT (SoCo)-196 Preliminary Generation Assumptions for the 2010 Transmission Expansion Planning Process Red Text = No Longer a Resource Assumption Note: Resources indicated are preliminary. As remaining assumptions are provided, this information will be updated accordingly.

Southeastern Region Transmission Planning YearSiteMW 2015Rumble Road #1 CC (GTC) 1162 Wansley #7 CC (GTC) -97 SOWEGA CT (GTC) Vogtle 3 (GTC) 330 Vogtle 3 (MEAG) 250 Vogtle 3 (Dalton) 18 Vogtle 3 (SoCo) 504 Dahlberg CT (GTC) 140 WashingtonCo CT (GTC) 367 Wansley #7 CC (GTC) -409 Year Site MW 2017Vogtle 4 (GTC) 330 Vogtle 4 (SoCo) 504 Vogtle 4 (MEAG) 250 Vogtle 4 (Dalton) 18 Wansley #6 CC (SoCo) -572 Preliminary Generation Assumptions for the 2010 Transmission Expansion Planning Process Red Text = No Longer a Resource Assumption Note: Resources indicated are preliminary. As remaining assumptions are provided, this information will be updated accordingly.

Southeastern Region Transmission Planning Year Site MW 2018Wansley #6 CC (GTC) 575 L. Smith CTs (SoCo) Elmore Co CC1 (SoCo) 840 Hancock CC1 (SoCo) 840 Wansley #6 CC (GTC) -286 WashingtonCo CT (GTC) 551 Harris (SoCo) Hancock CC2 (SoCo) 840 Green Text = Re-Timing Resource Assumption Red Text = No Longer a Resource Assumption Preliminary Generation Assumptions for the 2010 Transmission Expansion Planning Process Note: Resources indicated are preliminary. As remaining assumptions are provided, this information will be updated accordingly.

Southeastern Region Transmission Planning Stakeholder Feedback / Input

Southeastern Region Transmission Planning Projected 2010 SERTP Process

Southeastern Region Transmission Planning 2010 SERTP Process  1st Qtr Meeting – “First RPSG Meeting and Interactive Training Session”  RPSG Formation  Select Five Economic Planning Studies  Interactive Training Session  2nd Qtr Meeting – “Preliminary Expansion Plan Meeting”  Present Preliminary 10 Year Transmission Expansion Plan  Stakeholder input and feedback regarding the plan…alternatives to consider.  3rd Qtr Meeting – “Second RPSG Meeting”  Present Preliminary Results of the Five Economic Studies  Stakeholder input and feedback regarding results…alternatives to solutions identified  4th Qtr Meeting – “Annual Transmission Planning Summit and Assumptions Input  Present Final Results of the Five Economic Studies  Provide an overview of the 10 Year Transmission Expansion Plan

Southeastern Region Transmission Planning Next Meeting

Southeastern Region Transmission Planning Adjourn