Glenvar High School Renovations School Board Presentation

Slides:



Advertisements
Similar presentations
ELEMENTARY SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships.
Advertisements

Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Eastchester Union Free School District Pre-Bond Planning Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools.
F. A. Day Middle School Newton, MA Site Plan & Entry Plaza 1 st, 2 nd & 3 rd Floor Classrooms Cafeteria Administration and Student Services Suites West.
Design Review Planning to date Project scope summary
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Highly Qualified Staff NCLB Report. Campus General Education Special Education Paraprofessionals Elementary Middle School23211 High School24611.
N EXISTING FACILITIES BUILDING “A” -Principal’s Office -Workroom -(9) 3 RD Grade Classrooms - (4) 4 TH Grade Classrooms -Life Skills Classroom -Title.
Current Project Update October 25th 2012 Good Evening!!!
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Coloma Community Schools Community Forum #2 October 25, 2011.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
SCHEMATIC DESIGN PRESENTATION
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Jim Ned CISD School Bond Election May 8 th, 2010.
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
GATEWAY CENTER SPACE UTILIZATION STUDY September 17, 2007.
To Find Your Way Around Campus.  This presentation will show you where the following places are on campus ◦ The main classroom areas ◦ The cafeteria.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
ADDITION & REMODEL Eugene Field Elementary School.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
Designing and Programming Schools As Community Learning Centers Firestone/Litchfield Community Learning Center Community Update September 27, 2011 Community.
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Design Development Review
Queen Anne’s County Public Schools New Construction of the Matapeake Middle School.
New Fabra Elementary School Design Presentation. Play Field Playground Bus Loop Staff Parking Parent Drop-off Parking Johns Rd. Lattimore Blvd. Secure.
SMHa/CGD/TT c r o s s h i g h s c h o o l b e r k e l e y c o u n t y s c h o o l s addition + renovations phase 2.
Hotels April 18 th, context Elements Layout Rooms Amenities Motels.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Learning, Health, and Safety Capital Project Alternates and Change Order
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Dining.
MIDDLE SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Riley County – USD 378 Community Forum 2 23november2015 Riley County School District.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Board of Education Presentation November 17, 2014.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
White Pigeon Community Schools
2016 Community Advisory Facility committee November 3, 2016
Community Meeting, July 18, 2016 Update Designs and Phasing
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Goding Elementary Existing Conditions Presentation February 13, 2013.
Dr. Joseph Meloche Superintendent of Schools Mrs
Facilities Update November 17, 2017
21st Century School Buildings Plan
MIRACOSTA COMMUNITY COLLEGE DISTRICT
Woodbridge Middle School Renovation Referendum
2007 Bond Issue Capital Improvement Program
HISD Educational Learning Center STAFF PARKING Yellow Tag LOT
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Woodbridge Middle School Renovation Referendum
Student Center and Fitness Center Catholic High School
Where do you go from here?
EAST PENNSBORO AREA SCHOOL DISTRICT
Bensalem Township School District Feasibility Study
A. Write the correct numbers !
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

Glenvar High School Renovations School Board Presentation 02 | 06 | 14

EXISTING BUILDING PLAN 4 COMMON POINTS CONNECTED WITH CORRIDORS TO PARKING & ATHLETIC FIELDS NORTH CAFE. PARKING AUDIT. GYM MEDIA CORRIDORS CONNECT TO MIDDLE SCHOOL EXISTING MAIN ENTRY H.S. M.S.

Renovation Highlights 650 students capacity Program developed with teachers and administrators Existing building to be reused Spaces completely renovated Improved security Clearly defined building entry points Improved site circulation Geothermal HVAC system & plumbing /electrical upgrades throughout

Renovation Highlights Building reorganized for better circulation and accessibility Classrooms will be larger Improved technology throughout entire facility Improved administration suite and guidance suite / strategically located New individual instruction areas + resource rooms for pull-out instruction Teacher support space added Upgraded auditorium and gymnasium New cafeteria, kitchen, loading

Renovation Highlights New media center Improved theater arts, band and choir spaces Reclaimed auxiliary gymnasium Renovated locker rooms New Health/PE classrooms and fitness/training center Enlarged Tech Ed area Improved Special Ed. Classroom with proper support areas Reconfigured parking lot Bus lot relocation

Renovation SITE PLAN M.S. E.S. H.S. P P P P NLH INGAL BLVD. TOBEY RD. MALUS DR. M.S. E.S. H.S. BUS LOADING P P P P FACULTY / VISITOR PARKING NLH Best use of new additions required to fulfill the program More specialized spaces unique needs to be located in the new areas Spaces include the media center, cafeteria, kitchen and science classrooms All of the new additions are one story Not unlike the study concept, a new secondary entry would be provided from student parking and bus drop-off / pick-up Also, the existing shared kitchen issues would be resolved with a new direct connection to the Middle School cafeteria The science rooms could be constructed off of the existing entry and arranged to form a suite This prominent location adjacent to the existing lobby would give a strong identity to the area while still allow for after hours entry to the lobby area LE Given that the proposed additions are all single story, we can raise the ceiling structure in these areas Similar to Cave Spring, this would provide space for increased building system needs while also allowing for higher ceilings and enhanced finishes like pendant lighting and acoustic panels STUDENT / EVENT PARKING + GEOTHERMAL WELL FIELD EXISTING MOBILE CLASSROOM STORAGE BUS LOT I-81 NORTH

FIRST FLOOR PLAN Student Entry Dining / Kitchen and Loading Library Electives Gymnasium and Support Math Classrooms New Science Wing Library Special Education Auditorium & Performing Arts Guidance New Main Entrance & Lobby Administration

SECOND FLOOR PLAN English Classrooms Foreign Language Classrooms Electives Social Studies Classrooms Existing Lobby

Renovation ELEVATIONS NLH Best use of new additions required to fulfill the program More specialized spaces unique needs to be located in the new areas Spaces include the media center, cafeteria, kitchen and science classrooms All of the new additions are one story Not unlike the study concept, a new secondary entry would be provided from student parking and bus drop-off / pick-up Also, the existing shared kitchen issues would be resolved with a new direct connection to the Middle School cafeteria The science rooms could be constructed off of the existing entry and arranged to form a suite This prominent location adjacent to the existing lobby would give a strong identity to the area while still allow for after hours entry to the lobby area LE Given that the proposed additions are all single story, we can raise the ceiling structure in these areas Similar to Cave Spring, this would provide space for increased building system needs while also allowing for higher ceilings and enhanced finishes like pendant lighting and acoustic panels