October 3, 2006TCBC Meeting October, 2006Slide 1 TCB Code of Practice Art Wall

Slides:



Advertisements
Similar presentations
WTO, Trade and Environment Division
Advertisements

USG INFORMATION SECURITY PROGRAM AUDIT: ACHIEVING SUCCESSFUL AUDIT OUTCOMES Cara King Senior IT Auditor, OIAC.
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
B-BBEE VERIFICATION FRAMEWORK.  The BEE Verification process evolved since the release of the B- BBEE strategy in 2003  The dti was requested to provide.
Company Confidential Registration Management Committee (RMC) 1 Other Party Management Team (OPMT) Resolutions Stanley Faust Spirit AeroSystems Other Party.
Preparing for a Initial Assessment
Contractor Management and ISO 14001:2004
OPTIMISING CHEMICAL ANALYSIS FOR THE WFD BY QUALITY ASSURANCE PROCEDURES & ACCREDITATION An Overview OPTIMISING CHEMICAL ANALYSIS FOR THE WFD BY QUALITY.
First Practice - Information Security Management System Implementation and ISO Certification.
Quality Assurance/Quality Control Policy
SAFA- IFAC Regional SMP Forum
Purpose of the Standards
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
ASPEC Internal Auditor Training Version
Worldwide System for Conformity Testing and Certification of Electrical Equipment (IECEE) IECEE Copyright 2008 Definition of Product Consultancy, Independence.
Quality Representative Training Version
5.2 Personnel Use competent staff Supervise as necessary
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Key changes and transition process
Key changes from OHSAS 18001:1999
ISO/IEC A review of the new standard for laboratory accreditation
October 3, 2006TCBC Meeting October, 2006Slide 1 TCB Survey Art Wall
Accreditation and Notification in Poland CEOC CEE meeting, Prague, 8th – 10th April 2014.
Basics of OHSAS Occupational Health & Safety Management System
Implementation of the Essential Standards The Australian Quality Framework (AQTF) is the national set of standards which assures nationally consistent,
February 19-21, 2008 Hazim Dawood Telecommunications Engineering and Certification Canadian Update on MRA Implementation.
1 Certification of Community Origin Presenter Bernard Black Senior Project Officer – Customs & Trade Policy CARICOM Secretariat.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Charter School 2015 Annual Finance Seminar Grant Management Office of Grants Fiscal September 11, 2015.
10/20/ The ISMS Compliance in 2009 GRC-ISMS Module for ISO Certification.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
4.3 Document control 4.4 Review of requests, tenders and contracts
ASPEC Quality Representative Internal Auditor Training Version
Scholarly Publication: Responsibilities for Authors and Reviewers Jean H. Shin, Ph.D. Director, Minority Affairs Program American Sociological Association.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
11/26/2015TCB Council1 Networking in the TCBC Prepared/Presented by: Mark Maynard.
CSOC – Certification Structure Oversight Committee Application Guidance October 2015.
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
AUDIT OF INTERNAL CONTROL Day V Sessions I & II. Session Overview Periodical audit of existence of internal control in order to examine its effectiveness.
Webinar FSSC audit report 7th september 2015
SAM-101 Standards and Evaluation. SAM-102 On security evaluations Users of secure systems need assurance that products they use are secure Users can:
organization – status 2015 – scheme – integrity program – strategy
Company Confidential Registration Management Committee (RMC) 1 Sanctioned Training – The Training Provider Approval Body Perspective Atlanta, GA July 23,
May 13, 2005TCB Workshop May TCB Accreditation Review William Hurst Chief, Technical Research Branch Federal Communications Commission Office of.
RMC Auditor Workshop Charleston, SC July 2015 Registration Management Committee Company Confidential RMC Auditor Workshop Charleston, SC
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
14 March 2002Overview of TCB ProgramSlide 1 Overview of FCC Telecommunication Certification Body Program.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
Hospital Accreditation Documentation Process & Standard Requirements
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Overview of Standards on Cost Auditing By: CMA Pradip H.Desai.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
SUNY Maritime Internal Control Program. New York State Internal Control Act of 1987 Establish and maintain guidelines for a system of internal controls.
INTERNAL AUDIT REPORTS
MODULE 8: GOVERNANCE AUDIT EVIDENCE AND REVIEW
ISO/IEC
Learn Your Information Security Management System
Michel BRENON IEC ExTAG Secretary
Testing and Certification according to ISO and ISO 17065
INTERNATIONAL ACCREDITATION SERVICE (IAS)
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Module 2 Key Principles of the Peer Review Programme
TCBC Associate Membership
ACCREDITATION PROCESS
Process Auditing Why do people think that this is something new?
Denis Ward American TCB
Presentation transcript:

October 3, 2006TCBC Meeting October, 2006Slide 1 TCB Code of Practice Art Wall

October 3, 2006TCBC Meeting October, 2006Slide 2 Overview Introduction Shortened version of the Code Review of the Code Summary

October 3, 2006TCBC Meeting October, 2006Slide 3 Introduction A TCB is designated by the FCC and in fact represents the FCC when it approves equipment A TCB has a responsibility to the FCC, public and manufacturer to provide quality service To perform this service, each member of the TCBC should agree to adhere to and be assessed to the Code The Code follows Guide 65 and FCC expectations and policies For the Code to be effective, support from the entire TCB community is required to benefit all stakeholders

October 3, 2006TCBC Meeting October, 2006Slide 4 Shortened version of Code 1.Adherence to Guide 65 with emphasis on specific clauses 2.Publication of all TCB services and expectations 3.Signed agreement between the TCB and client 4.Complete application with appropriate statements from client 5.Reviewers and certifiers appropriately training and assessed for competence 6.Determining competence of a laboratory 7.TCB shall only certify equipment for which it has authority and competence 8.Complete quality reviews of applications for certification 9.Manufacturer statements regarding review of test data 10.TCB system to monitor quality and prevent errors 11.Reporting of undue pressure from clients 12.Internal TCB audits 13.Surveillance audits expectations 14.Application of Code to all scopes of accreditation

October 3, 2006TCBC Meeting October, 2006Slide 5 Code 1 – Guide 65 A TCB shall follow and abide with all aspects of ISO/IEC Guide 65….including Fair, impartial and transparent treatment Establishing a mission statement Ensuring quality manual is accurate Notifying the AB of any changes within 30 days Ensuring that the laboratory is competent Ensuring that each evaluator and certifier is competent Avoidance of consulting activities

October 3, 2006TCBC Meeting October, 2006Slide 6 Code 2 – published list A TCB shall publish a list of all services, prices, timetables, expectations, etc. to be provided by the TCB... the list shall be available to all perspective clients upon request

October 3, 2006TCBC Meeting October, 2006Slide 7 Code 3 – signed agreement The TCB shall have client sign an agreement that provides concise description of services, including … Information to be included in the application Information re confidential Reasonable timetable for approval of equipment The need and costs for providing a sample for testing

October 3, 2006TCBC Meeting October, 2006Slide 8 Code 4 – complete application The TCB shall ensure that the application is complete, appropriately signed, and is in accordance with FCC Rules and policies and includes a statement … that the application has not been submitted to another TCB

October 3, 2006TCBC Meeting October, 2006Slide 9 Code 5 – reviewer requirements A TCB shall ensure that each evaluator and certifier is appropriately assessed for competence by an auditor before he/she performs an evaluation or approval of equipment

October 3, 2006TCBC Meeting October, 2006Slide 10 Code 6 – laboratory competence The quality manual of a TCB shall include a procedure for determining competence of the lab submitting a test report. If the lab is not appropriately accredited, the TCB shall devise a procedure for determining its competence A TCB shall, to the extent possible, develop a method for educating its clients how to submit a quality application and test report

October 3, 2006TCBC Meeting October, 2006Slide 11 Code 7 & 8 – handling applications The TCB shall only certify devices for which it clearly has the authority and competence to evaluate a product The TCB shall perform a complete quality review of all aspects of an application … the review shall follow the internal guidelines for reviewing the specific type of equipment

October 3, 2006TCBC Meeting October, 2006Slide 12 Code 9 – manufacturer statements A TCB shall ascertain that the manufacturer has reviewed and concurs with the test report and that the tests performed are reflective of the operation of the device subject to certification

October 3, 2006TCBC Meeting October, 2006Slide 13 Code 10 – monitoring errors The TCB shall be accurate and establish a system to monitor and prevent previous errors … all complaints shall be documented and a course of action to avoid future complaints of the same type shall be incorporated into the quality manual, if warranted

October 3, 2006TCBC Meeting October, 2006Slide 14 Code 11 – Reporting of undue pressure from clients The TCB shall report undue pressure from a client to the FCC lab … a client that hints at or in fact takes business elsewhere for other than normal business decisions (e.g., price & quicker speed of service) is considered undue pressure … thus violates FCC Rules and shall be reported to the FCC

October 3, 2006TCBC Meeting October, 2006Slide 15 Code 12 – internal audits The TCB shall perform an internal audit in accordance with the procedure outlined in TCBC Guidance document #06-01 for performing internal audits

October 3, 2006TCBC Meeting October, 2006Slide 16 Code 13 – surveillance audits The TCB shall document in its quality manual how it selects and performs sample surveillance audits … all tests for which certification was granted shall be performed by the evaluator or certifier of the equipment

October 3, 2006TCBC Meeting October, 2006Slide 17 Code 14 – Code applied to all scopes The TCB shall apply this Code to all scopes of accreditation … both foreign and domestic

October 3, 2006TCBC Meeting October, 2006Slide 18 Summary The Code is really nothing more than the application of Guide 65 and the FCC rules and policies. It is the hope of the TCBC that all TBC agree to adhere to the Code to improve the consistency and quality of the TCB program. It is also hope that accrediting organization use the code to improve consistency and quality of the program

October 3, 2006TCBC Meeting October, 2006Slide 19 Thank You Art Wall Radio Regulatory Consultants, Inc (office) (cell)