1 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014 FCC Kick-Off “Wrap Up” Michael Benedikt, Frank Zimmermann.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Work Plan Development Guidelines and Schedule.
Future Circular Collider (FCC) Study
1 Future Circular Collider Study Michael Benedikt CERN, 26 th May 2014 Future Circular Collider (FCC) Study - Status Michael Benedikt.
Open Library Environment Designing technology for the way libraries really work November 19, 2008 ~ ASERL, Atlanta Lynne O’Brien Director, Academic Technology.
1 Open Library Environment Designing technology for the way libraries really work December 8, 2008 ~ CNI, Washington DC Lynne O’Brien Director, Academic.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
ILC, FCC and the landscape of future colliders 121 April 2015Interactions meeting Toyama.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market.
Understand the Present to Master the Future Johannes Gutleber Future Circular Collider.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Future Accelerators at the High Energy Frontier
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
Patrick Janot News and Organization  Major events since last coordination meeting (30 April 2014) u 7 th FCC-ee (TLEP) Physics Workshop (19-21 June 2014)
R. Garoby 3/03/2006PAF progress1 PAF Progress 3/03/2006 M. Benedikt, R. Garoby, F. Ruggiero, R. Ostojic, W. Scandale, E. Shaposhnikova, J. Wenninger 
FCC kick-off meeting a summary for magnets L. Bottura
Status of QUACO project
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
330 registered participants Closing remarks. 2 Future Circular Collider Study FCC Kick-Off 2014 Discussion of all FCC aspects Refine scope of the study.
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP5 “XBEAM”
Introdcution to Workpackage/Activity Reflection D. Schulte.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
FCC-ee Interaction Region design
INSPIRE and the role of Spatial Data Interest Communities (SDIC)
WP3 - Evaluation and proposal selection
LHeC Coordination Meeting, 9 June 2017
1st FCC Infrastructure & Operation meeting
Oct 22 Group Leaders Planning meeting
FCC Kick-Off 2014 Future Circular Collider (FCC) study: kick-off meeting & recent progress Frank Zimmermann BE/ABP 22 May 2014 thanks.
Input to Strategy currently planned
FCC summary report March 2015 Washington.
Future Circular Collider
Overview of Future pp Collider Plans
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Future Collider Projects at CERN
Passenger Mobility Statistics 21 May 2015
Presentation transcript:

1 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014 FCC Kick-Off “Wrap Up” Michael Benedikt, Frank Zimmermann

2 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014 Following ESU in May 2013, creation of a small preparation group in autumn 2013 to prepare on a short time scale: preliminary draft baseline parameter sets for all options a possible work breakdown structure and study organisation an international kick-off meeting (now!) FCC Kick-off goals Kick-off event should start process of internat. collaboration presenting preparatory work as basis for discussion  draft parameter sets & WBS documents available inviting feedback and suggestions working towards formation of a global design study collaboration integrating all aspects of machines, physics and detectors Reflected in kick-off meeting programme. Common agreement that we have achieved these goals

3 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014 There is a very broad spectrum of work in all areas physics, experiments, machines and infrastructures to be addressed within FCC Many challenges in front us that can only be addressed in a wide collaboration using all expertise available  Very positive signs from Kick-off participants towards working together on the FCC study. General observations (i)

4 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014 Particular attention from the beginning should be given to “global” aspects related to the overall dimension of FCC with potentially enormous impact on operation and cost: Safety, operation, maintenance, overall availability Energy optimisation, overall infrastructure optimisation Identification of transitions in technology, cost Industrialisation aspects, high multiplicity of elements Scalability of solutions, assumptions vs. real parameters Political acceptance and societal acceptance Drive forward technologies with such a project  Keep this in mind and take appropriate steering when starting detailed design work! General observations (ii)

5 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014

Erk Jensen/CERN Many thanks to: A. Butterworth, O. Brunner, R. Calaga, S. Claudet, R. Garoby, F. Gerigk, P. Lebrun, E. Montesinos, D. Schulte, E. Shaposhnikova, I. Syratchev, M. Vretenar

7 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014 FCC work plan study phase Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Kick-off, collaboration forming,  study plan and organisation Release CDR & Workshop on next steps Workshop & Review  contents of CDR Workshop & Review  identification of baseline Ph 2: Conceptual study of baseline “strong interact.” Workshop & Review, cost model, LHC results  study re-scoping? Ph 3: Study consolidation Report Prepare 4 large FCC Workshops distributed over participating regions Ph 1: Explore options “weak interaction” Explore options, now – spring 2015: -Investigate different options in all technical areas, taking a broad view -Deliverables: description and comparison of options with relative merits/cost, Develop schedules, understand relative impact of options on overall schedule (physics operation time, machine installation time, etc.) -FCC workshop to converge to common baseline with small number of options -Proposed WS date 23 – 27 March 2015 (presently no known collisions…) -Followed by review ~2 months later, begin June 2015

8 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014 Establish an international collaboration: Following very positive reactions and the enthusiasm during the Kick-off meeting:  Formal invitations to institutes to join collaboration  Aiming at expressions of interest by end May to form nucleus of collaboration by September  Enlargement of the preparation team  First international collaboration board meeting 8-10 September Next steps (i) March April May June July August September 2014 kick-off event expressions of interest (EOI) proposed 1st ICB meeting discussionsiterations

9 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014 Keep momentum of the meeting and continue discussions and work started in break-out sessions Start common work on informal basis for:  Further identification of design drivers and work topics  Refinement of work topics according to interest and resources of all partners  Development of a work plan for exploratory phase 1 Next steps (ii)

10 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014 Goals fo EU DS: conceptual design, prototypes, cost estimates, … From FP7 HiLumi LHC DS  positive experience: 5-6 work packages as sub-set of FCC study ~10-15 beneficiaries (signatories of the contract with EC) FCC EU Design Study (DS) Proposal Horizon2020 call – design study, deadline Prepare proposal parallel to FCC collaboration setup Non-EU partners can join as beneficiary – signatory with or w/o EC contribution (contractual commitment) or as associated partner – non- signatory (in-kind contribution with own funding, no contractual commitment) kick-off event input from interested partners, end of May submission of EU FCC DS proposal, 2 Sept. discussions iteration, agreements, signatures March April May June July August September 2014 complete draft proposal, end of June Time line

11 Future Circular Collider Study Michael Benedikt FCC Kick-Off 2014 Thanks to all contributors for the excellent quality of presentations and the work already invested! Thanks to all of you for your participation, the constructive discussions and the extremely positive and enthusiastic atmosphere that you brought to this meeting. Looking forward to global collaboration with you and to meeting all together again at the first FCC collaboration workshop March Conclusions

historical path to 100 TeV collider … and plenty of studies to learn from Mountain Path in Spring by Ma Yuan ( 馬遠 ) Late Sung Dynasty

historical studies in Europe Eloisatron = Eurasiatic Long Intersecting Storage Accelerator proposed by Antonino Zichichi c.m. energy 200 TeV, circumference 300 km, 13.5 T magnets, fitting inside Sicily INFN study started in 1979, still ongoing Supercolliders Superdetectors: Proceedings of the 19th and 25th Workshops of the INFN Eloisatron Project

Eberhard Keil, “Hadron colliders between 1 and 100 TeV beam energy,“ CERN-LEP-TH ; LHC-NOTE-4 ; CERN-LHC-Note , “Scaling laws and cost optimization for hadron colliders around 100 TeV,” 19th INFN Eloisatron Project Workshop : Maximizing luminosity of hadron colliders at 100 TeV, Erice, Italy, Nov 1991 optimized parameters & cost historical studies at CERN

Report of the 20 TeV Hadron Collider Technical Workshop: Held at Cornell University, March 28-April 2, 1983, Cornell University Floyd R. Newman Laboratory of Nuclear Studies, Cornell University → access requires application, identification,... x-ray security scans,... & copies strictly forbidden! Cornell colleagues Ralf Eichhorn & Stephen Markham kindly took and sent some photos of these proceedings... At Cornell these proceedings are stored in the Library Section of „historically valuable manuscripts“ together with an original manuscript of Thomas Jefferson ! historical studies in the US

SSC CDR 1986 H. Ulrich Wienands, The SSC Low Energy Booster: Design and Component Prototypes for the First Injector Synchrotron, IEEE Press, SSC design thanks to Swapan Chattopadhyay historical plan for an "SSC" in Japan, Ibaraki prefecture (F. Takasaki, private communication)

Design Study for a Staged Very Large Hadron Collider VLHC Design Study Group Collaboration June pp. SLAC-R-591, SLAC-R-0591, SLAC-591, SLAC-0591, FERMILAB-TM-2149 VLHC design

HE-LHC study & Malta workshop 2010 better to go for a 100-TeV machine?! EuCARD-AccNet-EuroLumi Workshop: The High-Energy Large Hadron Collider - HE-LHC10 HE-LHC 10, E. Todesco and F. Zimmermann, (eds.), EuCARD-CON ; arXiv: ; CERN (2011) “33 TeV would be nice (?)”

FCC Kick-off

“Bière de l'amitié"

"Vin de l'amitié"

FCC-ee FCC-hh FCC-he

FCC will be a global study we started at the right place! in this building next to breakout sessions!

“Need to have excellent communication and outreach accompanying the study” J. Womersley

great interest & fascination around the world!

the physics case is obvious

N. Arkani-Hamed

design for success! J. Womersley