1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy February 2015.

Slides:



Advertisements
Similar presentations
The FCCs Disaster Information Reporting System (DIRS) July 14, 2009.
Advertisements

Icahn Conversion to T. Rowe Price ITS ABOUT BEING THERE. DaVita Inc. Conversion to T. Rowe Price.
Analysis to support CALEA Standards Prepared by: Christie Goddard.
1 How Does E-Grants Streamlining Affect Me as a Grantee? Abbey Tyrna, OMB Watch National Grants Management Association Conference April 28, 2004.
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2014.
Science Olympiad Summer Institute Phoenix, AZ July 16 – 20, 2012.
Benchmarking Clinicians Farrokh Alemi, Ph.D.. Why should it be done? Hiring, promotion, and management decisions Help clinicians improve.
Federal Communications Commission Public Safety and Homeland Security Bureau Public Safety Communications Update “View from the FCC” David G. Simpson,
EXPERIMENTAL DESIGN Science Olympiad Summer Institute Phoenix, AZ July 18 – 22, 2011.
An approach to teaching it. Jacqueline is purchasing her first car and feels torn as she balances conflicting desires and messages. She yearns to be seated.
Integration of Quality Into Accident Investigation Processes ASQ Columbia Basin Section 614 John Cornelison January 2008.
Mary Lou Maher University DECO2005, Semester 2, 2005 Project Management.
1 Developing A Quality Assurance Program For The US Census Bureau’s Business Register David. D. Chapman US CENSUS BUREAU 1.
DR NIRANJAN P DR K LAKSHMAN DR M S SRIDHAR AUDIT ON DISCHARGE SUMMARIES.
ARINC PROPRIETARY Long Range Satellite Communications Prepared for SOCM/2 February 8 -10, 2012.
NHSN SSI Clarifications Janet Sullivan, Oregon SW Washington APIC Jeanne Negley, Oregon Health Policy & Research.
Web-centric BusinessNRIC V – February 27, 2001 NRIC V Council Meeting - February 27, 2001 Focus Group 2.B1 Network Reliability - Data Reporting & Analysis.
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
Lesson Timeline AHF 2203 – Aviation Human Factors  24 Credit hours per semester Class duration: (4 hrs /week)  Week 1-3: Lecture  Week 4: Mid term.
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy September 2014.
Agenda Review Major Changes from January 8 Presentation of Draft Preliminary Results Review Final Recommendations Other Progress to Date  
Maintenance of Elements. © Copyright 2008 Ontario Safety Association for Community & Healthcare. All rights reserved/tous droits réservés. Reproduction.
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy May 2015.
IAEC Reliability Webinar Presented by: Regi Goodale and Ethan Hohenadel December 11,
Chapter 6 Internal Control in a Financial Statement Audit Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
FAA CENTER OF EXCELLENCE FOR ALTERNATIVE JET FUELS & ENVIRONMENT Project manager: O. Perations, FAA Lead investigator: I. Dunno, University of E. Missions.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
1.  An event study is designed to examine market reactions to, and abnormal returns around specific information-imparting events.  These events can.
1.  An event study is designed to examine market reactions to, and abnormal returns around specific information-imparting events.  These events can.
Disciplined Software Engineering Lecture #2 Software Engineering Institute Carnegie Mellon University Pittsburgh, PA Sponsored by the U.S. Department.
© 2012 National Safety Council First Aid Roster Website Makeover! Presented by Kathy Safranek Website Administrator.
Research Project Title Researcher Name #1 Researcher Name #2 Researcher Name #3 Researcher Name #4 Date of Presentation Name of Conference Presenting at.
Working Group 8 – E9-1-1 Best Practices June 6, 2012 Robin Howard Chair WG 8 – E9-1-1 Best Practices.
1 Grants.gov Update to the NGP February 1, Grants.gov System Improvements  December 11 – 12, 2010: Oracle Database version 11g upgrade  January.
Retail Market Messaging Incident Report 1. Agenda Recap of integrated market messaging system Incident Overview Current Status Incident Observations Next.
1 Emergency Access Advisory Committee NG9-1-1 Notice of Inquiry January 14, 2011 Patrick Donovan Attorney Advisor Policy and Licensing Division Public.
Timeline and Milestones. The first step to any plan is thinking about a timeline. You want to know what needs to get done and when, to ensure that you.
JOHN DOE PERIOD 8. AT LEAST 80% OF HUMANITY LIVES ON LESS THAN $10 A DAY.
Working Group 8 – E9-1-1 Best Practices December 16, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2015.
Quantifying the Significance of the April 2011 Severe Weather Outbreak Matthew S. Stalley, Chad M. Gravelle, Charles E. Graves Saint Louis University.
Web-centric BusinessNRIC V – June 26, 2001 NRIC V Council Meeting - June 26, 2001 Focus Group 2.B1 Network Reliability - Data Reporting & Analysis.
Science Experiment by Name or Names Question: How does _____ affect _______?
Types of Reports Introductory Report Progress Reports Incident Report Feasibility Report Marketing Report Field Report Laboratory Report.
ETSI TC ESI PRESENTATION TO CAB FORUM Iñigo Barreira /Arno FiedlerFebruary 2016 meeting, Scottsdale, AZ © ETSI All rights reserved.
IFTA BALLOT #3 Overview of changes. Overview of Changes The new Language in Ballot #3 introduces 5 new requirements and defines “should” as a conditional.
Doc.: IEEE /0022r0 Submission January 2007 Wu Yu-Chun, Huawei HisiSlide 1 Enhanced Beacon Sync Frame for the IEEE P Wireless RANs.
Atlantic Coast Operations Business Intelligence Mobility Project.
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Long Range Satellite Communications
PowerPoint Template – delete this slide
Analysis of Network Outage Reports
Lesson 4: Change and continuity
Analysis of Network Outage Reports
EMIS 7300 SYSTEMS ANALYSIS METHODS FALL 2005
Analysis of Network Outage Reports
Incidence of Legionnaires’ disease by county, January 1, 2010–December 31, 2017 Showing counties that had at least one case per year (on average) during.
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Circle Chart Template Process Name.
Line of Best Fit Objective: Students will be able to draw in, find the equation of and apply the line of best fit to predict future outcomes.
Presentation Title SUBTITLE description LOGO.
Analysis of Network Outage Reports
Atlantic Coast Operations
SCHOOL DISASTER MANAGEMENT PLAN
Presentation transcript:

1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy February 2015

2

 Took average of January 2011 through December 2011 as the standard 3

4 See ATIS Analysis of FCC-Reportable Service Outage Data for a description of the method used to calculate the outage index.

5 Procedural events are ones which have a procedural root cause.  Many of these events are related to Planned Maintenance. (We will not include this chart next time)

6

7

8

9

10

11

12

13

14 Wireline outages are all outages for which the Reason Reportable was at least 900,000 wireline user-minutes.

15

16

17

18

19

20

21

22

23

24

25

26

27 Non-DS3-Simplex Outages Data from 1/12 thru 12/14 Conclusion: Non DS3- Simplex Outages are unchanged in duration from 1/12 to 12/14 DS3-Simplex Events Only Data from 1/12 thru 12/14 Conclusion: DS3-Simplex Events are unchanged in duration from 1/12 to 12/14 Rank Correlation of duration with date is.001 and is not significant Rank Correlation of duration with date is.011 and is not significant

 Changes to NORS/DIRS: Added ability to send text messages when DIRS is activated. Comments and suggestions are greatly appreciated 28

Current Teams  Best Practices Team  Outage Reporting Advisory Team  Improvements to the NORS System  Improvements to the template  Recommended ways to communicate information  Improvements to NORS/DIRS manuals  Fiber Cut Team (Done)  IP Transition Team  Planned Maintenance Team: Examine planned maintenance events; recommend ways to upgrade the system without affecting service 29