New AM Antenna Protection Rules Cris Alexander, CPBE, AMD, DRB Crawford Broadcasting Company Aurora, Colorado.

Slides:



Advertisements
Similar presentations
AND OTHER ACCESS RESTRICTIONS
Advertisements

Amateur Radio Technician Class Element 2 Course Presentation ELEMENT 2 SUBELEMENTS T1 - FCC Rules, station license responsibilities T2 - Control operator.
Conversion of Analogue Assignments into Digital Allotments Conversion of Analogue Assignments into Digital Allotments The Channel Potential Method Dr.
World Radiocommunication Seminar – Geneva 2010 GE84 Agreement VHF-FM Sound Broadcasting Bangaly Fod é Traor é and Jean-Marc Paquet Radiocommunication Bureau.
Annex 4, Section 1 – RRC06 – 06 June 2006 Annex 4 to the Geneva 2006 (RRC- 06) Agreement, Section I: Limits and methodology for determining when agreement.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Working.
Broadband Over Power Line National Telecommunications and Information Administration U.S. Department of Commerce May 25, 2005.
OSHA Requirements for Tower Construction Related to RF Radiation
Wireless and Broadcast Radiation Pollution A U.S. Regulatory Health Issue and What To Do About It.
American Certification Body - Your Online Resource for Regulatory Training 1588 ENERGYSTAR®
Protecting RNSS Spectrum Domestic and International Activities Karl B. Nebbia Associate Administrator Office of Spectrum Management National Telecommunications.
RF Safety By Bob Buus, W2OD. Certification 6) Amateur Applicant/Licensee certifies that they have READ and WILL COMPLY WITH Section 97.13(c) of the Commission’s.
Overview of Service Rules: Technical and Licensing Issues Keith Harper Electronics Engineer, Mobility Division, WTB November 29, GHz Band Auction.
WiFi Antennas Reid Palmeira EE496 Design Review. Design Considerations Effectiveness  SNR improvement Ideal Distance of Mobile from Base Station Size.
New AM Antenna Protection Rules Cris Alexander, CPBE, AMD, DRB Crawford Broadcasting Company Aurora, Colorado.
Doc.: IEEE /0803 Submission July 12-16, 2004 Barry (Intel) Slide 1 Wireless network operation in the TV Bands Update Barry O’Mahony
Airborne GPS Re-radiation Spectrum Supportability Efforts, Policy and Outcome DoD Spectrum Workshop December 2011 Annapolis, MD.
Broadband over Power Line ARRL Statement Paul L Rinaldo Chief Technology Officer American Radio Relay League Tel: , Fax:
Certification & Engineering Bureau CB notification Inquiries & Issues Nicolas DesMarais Certification Officer Agent d’Homologation TCB Workshop – February.
Federal Geographic Data Committee’s Coordination Group May 6, 2003 Presented by Donald Draper Campbell Electronic Engineer Technical Analysis Branch Electromagnetic.
July 2005 Gregg Levin, BridgeWave Communications Slide 1 doc.: IEEE /433/r0 Submission Project: IEEE P Working Group for Wireless Personal.
Submission November 2008 Charles Cooper, dLRSlide 1 Preliminary White Space Availability IEEE P Wireless RANs Date:
Overview of Service Rules and Due Diligence Dwain Livingston Senior Engineer Mobility Division, WTB November 1, – 1990 MHz BROADBAND PCS Auction.
EMC Evaluation at Green Bank: Emissions and Shield Effectiveness National Radio Astronomy Observatory Carla Beaudet Green Bank RFI Group Leader.
July 2005 Gary Baldwin, SiBEAM, Incorporated Slide 1 doc.: IEEE c Submission Project: IEEE P Working Group for Wireless Personal.
Study on conformity assessment procedure for technical requirements for the human protection against electromagnetic waves of radio base station Kyungjin.
1 Amateur Radio Technician Class Element 2 ELEMENT 2 SUBELEMENTS T1 - FCC Rules, station license responsibilities T2 - Control operator duties T3 - Operating.
Radiation Safety Plan Recommended by OSHA Elements of Plan  Site Specific Issues  Personnel Training  Safety Procedures  Definition of Controlled and.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
They are not the same Dennis Ward ATCB. The FCC has a requirement that Applications for certification through the TCB program must contain test reports.
Overview of Service Rules: Technical Issues Phase II 220 MHz Service (Auction No. 72) Gary Devlin Engineer, Mobility Division Wireless.
Introduction to the Global Positioning System Introduction to the Global Positioning System GPS.
Doc.: IEEE /0530r1 Submission November 2007 Gerald Chouinard, CRCSlide 1 Wireless Microphone Sensing IEEE P Wireless RANs Date:
Doc.: IEEE /0152r1 Submission June 2008 Gerald Chouinard, CRCSlide 1 Incumbent database query IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0152r0 Submission May 2008 Gerald Chouinard, CRCSlide 1 Incumbent database query IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0462r1 Submission Nov Cheng Shan, Samsung Electronics Slide 1 Aggregated Interference from CPEs IEEE P Wireless RANs Date:
General Licensing Class Your New General Bands Brookhaven National Laboratory Amateur Radio Club.
1 MDS/ITFS Licensing Public Forum. 2 Public Forum Agenda I. Overview and Background II. Finding MDS/ITFS License, Application and Data Correction data.
Slide 0 National Spectrum Managers Association Industry Round Table: Fixed Service Mitchell Lazarus | May 22, 2007.
ECE 1100: Introduction to Electrical and Computer Engineering Notes 10 Antennas Transmission and Reception of waves Wanda Wosik Associate Professor, ECE.
Overview of Service Rules and Due Diligence Keith Harper Electronics Engineer Mobility Division, WTB March 7, 2007 BROADBAND PCS Auction No. 71 Seminar.
Doc.: IEEE /0411r1 Submission September 2007 Ahmed Sadek, QualcommSlide 1 Aggregate Interference at a DTV Receiver for a Hexagonal Cell Structure.
Permitting and National Ambient Air Quality Standards Changes Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced.
Technical Issues, Due Diligence and Licensing Parameters Keith Harper Engineer Mobility Division, WTB June 10, 2008 Auction 78 Seminar BROADBAND PCS.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Test #2 April 1 st Energy Light and Electromagnetism Electromagnetic Radiation.
T4-1 Chapter 4 – Station Licensee Duties The Application Your License Antenna Structure Location The Control Operator Station Records Emergency Communications.
71-95 GHz Registration A Streamlined Approach to Licensing.
Not all changes will be discussed please view all regulations at
National League of Cities Increasing Wireless Communications Services for Your Residents Congressional and FCC Action on Mandatory Wireless Facilities.
Doc.: IEEE /0118r0 Submission May 2008 Gerald Chouinard, CRCSlide 1 Use of collaborative sensing to reduce false positive results IEEE P
Overview of Service Rules: Technical Issues Gary Devlin Engineer Mobility Division, WTB December 3, MHz SMR Auction No. 55 Seminar.
17/03/2016 Summary of FCC’s RF Exposure Proceeding Presented By: Bill Belt, TIA 1GSC-9, Seoul SOURCE:TIA TITLE:Summary of FCC’s RF Exposure Proceeding.
W2UC: Union College RF Repeater for Amateur Use
Doc.: IEEE /0529r0 Submission November 2007 Gerald Chouinard, CRCSlide 1 TV Incumbent Database Access IEEE P Wireless RANs Date:
Doc.: IEEE /00529r1 Submission November 2007 Gerald Chouinard, CRCSlide 1 TV Incumbent Database Access IEEE P Wireless RANs Date:
Doc.: IEEE /0010r0 Submission January 2013 Gerald ChouinardSlide 1 Overview of the Beacon Standard IEEE Wireless RANs Date:
1 70/80/90 GHz Web-Based Coordination Improving the Effectiveness of the Domestic Spectrum Management Process National Spectrum Managers Association Arlington,
August, 2012 MBANS FCC Rules Summary Information document for SRD/MG on the FCC adopted MBAN rules under part 95 MedRadio service on 24 May 2012.
Cell Phone Tower Proposal: Comparison – for discussion
600 MHz – Proposed TV Transition Objectives and Methodology
17 November 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Near Field Ranging Algorithm] Date.
LP or Translator Stations
Aggregated Interference from CPEs
Wireless Microphone Sensing
doc.: IEEE <doc#>
doc.: IEEE yy/xxxxr0 Month Year May 2016
doc.: IEEE <doc#>
Location Presentation
The Chief Operator Overview of requirements and duties.
Presentation transcript:

New AM Antenna Protection Rules Cris Alexander, CPBE, AMD, DRB Crawford Broadcasting Company Aurora, Colorado

Introduction It has long been recognized that metallic structures near AM radiators have the potential to produce undesired effects on the radiation pattern FCC “Newcomer Policy” – a newcomer… is responsible, financially or otherwise, for taking steps necessary to eliminate objectionable interference to other stations.

Introduction There has always been ambiguity about what constitutes “objectionable interference.” The FCC has, in many cases, been reluctant to apply the newcomer policy to cases of reradiation.

Introduction Rules have long been in place in Part 22 (Public Mobile Service), Part 27 (Wireless) and Part 73 (Broadcast) requiring specific actions within a certain distance of an AM antenna. No rules existed for Part 90 (Private Land Mobile) or any other service. Those services could build near AM arrays without study or mitigation.

Coalition Starting in 2008, the AM Directional Antenna Performance Verification Coalition began working with the FCC to adopt new universal rules for AM antenna protection. These new rules were enacted in August of 2013 – still awaiting OMB approval. Contained in Part 1 (Practice and Procedure) – universal to all services.

Screening Distances Based on wavelength at AM frequency For non-directional (ND) stations, screening distance is one wavelength. For directional (DA) stations, screening distance is 10 wavelengths or 3 km, whichever is less. CDBS array center coordinates are to be used to calculate distances.

Screening Heights For ND stations, screening height is 60 electrical degrees. For DA stations, screening height is 36 electrical degrees. Building-mounted antenna supports must be considered only if the tower or antenna structure itself exceeds the applicable threshold height. –The building height is not considered.

Non-Directional Screening

Directional Screening

Building Screening

Significant Modification Criteria Altering the physical height by more than 5 electrical degrees. Any addition/replacement of antenna or transmission line on a detuned or base- insulated tower.

Modification Screening

Disturbance Criteria For ND stations, 2 dB. For DA stations, any radiation in excess of the AM station’s licensed standard pattern. Proponent must provide AM licensee 30 days written notice prior to construction or modification.

Moment Method Analysis Moment-method analysis is to be used to determine the potential effects of an antenna structure within the screening distance and in excess of the screening height. No model calibration is required. § modeling criteria must otherwise be used.

Field Measurements For conventionally-licensed AM stations, pre/post-construction monitor point measurements can be made instead of moment-method analysis. MP field strengths are not always a good indicator of the impact of a nearby potentially reradiating structure.

Outside the Screen Tower construction/modification that falls outside the screen criteria is presumed to have no impact on the AM antenna. When an AM station is impacted by such construction/modification outside the screen (or when the AM licensee believes his antenna will be impacted), a showing can be submitted using moment-method analysis or field measurements. Must be provided to the proponent if not yet constructed, and to the FCC within two years of completion of the structure.

Outside the Screen (cont’d) FCC can order detuning. Once notified, the applicant is held up from construction or application unless notification and corrective action are provided by the applicant.

Existing Reradiating Structures One-year window from effective date of rules to submit showing. Moment-method or field measurement analysis. FCC can order detuning if indicated.

A Moment-Method Analysis Example 3-tower 5 kW AM directional array on 1330 Part 90 tower located 320 meters away –Azimuth to tower: deg. True –Height of tower: 45.7 meters Step 1: Construct and run a control model of only the AM array Step 2: Add the other tower to the model and run