Fanning Outdoor Recreation Facility Conceptual Plan Final report (draft) Presented by Stan Kochanoff & Tracey Tomlik
Stakeholders –The Strait Regional School Board –The NS Department of Health & Protection –The Municipality of Guysborough Preliminary ‘shopping list’ –8km trail loop –Campsites –Outdoor classroom & shelter –Low ropes initiative course –Bird Blind –Interpretive signage –Access route to Lake & Canoe launch area
Final Report –Conceptual Plan Showing in plan view where design elements are located –Three Phased developmental approach Organizing design elements into four separate projects –Cost Estimates Presenting expected cost associated with each design element
Bird Observation 8km Trail Group Campsites Tree-Go Outdoor Classroom Teaching Garden Soccer Field Walking Track Green Gym Access Road Canoe Launch
Phase One –Establishing a Trail system –Two group campsites –Interpretive signage –Regulation Soccer Field –Access Road/ Turning circle & parking –Canoe launch site Total Cost –$82, ,824
Establishing a Trail System –8kms of trail Yellow route (1km) Blue route (2km) Red route (5km) 8kms of trail –$2,500/km Total –$20,000
Group Campsites (2) –(1) family camping Trail ($625) Picnic tables Fire pit Waste bins –(2) Wilderness camping Trail ($750) Fire pit ($100) Total –$ 2,
Interpretive Signage –Wooden signs –Describing local ecology –Showing direction Cost Estimate –3 Large ($1,500) –15 Small ($ ) Total –$5, ,000
Soccer Field (300 x 180ft) –Extension $ ,000 –Bleachers ($4,800) –Benches ($600) –Nets ($5,300) –Fencing (behind nets) $14,400 Total –$32, ,100 Annual Maintenance –Lime (20lb/1000sqft) $135 –Fertilizer (10lbs/1000sqft) $259 –Aeration $480 Total –$874
Lake Access Road –Expanding the current path to 11ft wide Cost Estimate –Excavating $810 –Class A Gravel $6,480 –Ditching $4,500 Total –$11,790
Turning point & temporary parking –35ft Radius parking spots Cost Estimate –Fill $1,180 –Excavating $295 –Class A Gravel $2,360 Total –$3,835
Canoe Launch Site –Clearing rocks to create a launching site –Constructing a dry dock Cost Estimate –Lake dragging ($3,000) –Dock ($2,500-3,000) Total –$ 5, ,000
Phase Two –Bird Observation –Outdoor classroom shelter –Teaching garden –Tree Plantings Total Cost –$40,524 - $45,524
Bird Observation Tower –An offshoot of the yellow hiking trail 0.3km ($750) –Observation platform 256sqft footprint –$ ,000 Total –$ 12, ,750
Outdoor classroom –Shelter with no walls 1,600sqft –Long table with benches –Location is flexible right now Cost Estimate –Excavating ($90) –Class A gravel ($720) –Materials $8 - 10,000 Total –$8, ,810
Two possible locations
Teaching garden (900sqft) –Food production –Wildlife habitat Cost Estimate –Excavating ($50) –Soil ($200) –Compost ($250) –Gravel ($120) –Fence ($9,100) Total –$9,720 * Excluding the cost of plant material
Tree Plantings –Soccer Field (10) –Playground (3) –Grassed slope (9) Cost Estimate –5ft Evergreen $368 (8) –60mm Deciduous $450 (14) Total –$9,244
Phase Three –Walking Track –Green Gym Outdoor Fitness Centre –Aerial Adventure Course (Tree-Go) Total Cost –$74,235 - $84,235
Walking Track –Located on the perimeter of the soccer field –Walking & jogging for all ages Cost Estimate –Excavation $335 –Track base (67cuyd) Crusher dust ($3,900) Total –$4,235
Outdoor Gym system –Green Gym (5units) –Stations placed along walking track –One designated area Total –$20,000
Aerial adventure course –Tree-Go unit Demo Area Kids Area Main Course –>10” Trees or use poles Total –$50, ,000
Phase 1 –$82, ,824 Phase 2 –$40, ,524 Phase 3 –$74, ,325 Total Cost Estimate –$197, ,583 Summary –Presentation Final Plan (draft) Cost Estimate –Public Feedback Questions or concerns Discussions