Ongoing Model Updates and Related Activities for NAAQS Compliance 2012 Region 4 Modelers Workshop Region 4 Office, Atlanta, GA George M. Bridgers OAQPS-AQAD-Air.

Slides:



Advertisements
Similar presentations
AERMOD Modeling System: Status and Updates Roger W. Brode U.S. EPA/OAQPS Air Quality Modeling Group Region 4 Modelers Meeting November 14, 2012 Atlanta,
Advertisements

Rider 8 Technical Workgroup Development. Introduction - Rider 8 Program for Ozone 74 th State Legislative Session authorized and budgeted to assist areas.
Session 7: Other Conformity Rule Changes FHWA Transportation Conformity and CMAQ Workshop Summer 2004.
TCEQ Air Permits Division Justin Cherry, P.E. Ahmed Omar Stephen F. Austin State University February 28, 2013.
Status of Exceptional Events Implementation Guidance Janet McCabe Deputy Assistant Administrator US EPA, Office of Air and Radiation WESTAR Spring Meeting.
National Ambient Air Quality Standards for NO 2 and SO 2 – New Modeling Challenges August 4, 2011 Air & Waste Management Association – Southern Section.
How Ozone is Regulated under the Clean Air Act Darcy J. Anderson AZ Dept. of Environmental Quality.
1 An Update on EPA Attainment Modeling Guidance for the 8- Hour Ozone NAAQS Brian Timin EPA/OAQPS/EMAD/AQMG November 16, 2005.
Issues on Ozone Planning in the Western United States Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31, 2011.
EPA Update- Bob Judge Maine Air Quality Monitoring Committee April 18, ) NAAQS schedule 2) Budget 3) Technical Systems Audit.
Update on Monitoring, Modeling & Data Issues Region 4 Air Pollution Control Agencies Fall 2012 Meeting Raleigh, NC October 23, 2102 Richard A. “Chet” Wayland,
2015 FTIP/FSTIP Workshop Transportation Conformity Wade Hobbs FHWA CADO January 15, 2014.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
Overview of SAFETEA-LU Sections 6001, 6002, 3005, and 3006 TRB January 13, 2008 Shari Schaftlein FHWA Project Development & Environmental Review Washington,
1 WRAP Policy Fire Tracking Systems Draft December 9, 2002 FEJF Meeting December 10-11, 2002 Jackson, WY.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Water Supply Planning Initiative State Water Commission November 22, 2004.
| Philadelphia | Atlanta | Houston | Washington DC SO 2 Data Requirements Rule – A Proactive Compliance Approach Mark Wenclawiak, CCM |
Oil and Gas Workgroup Summary October 21-23, 2009 Denver.
1 MOBILE6 -Input and Modeling Guidance -SIP and Conformity Policy North American Vehicle Emission Control Conference Atlanta, April 4, 2001 Gary Dolce.
Recent Developments in Transportation Conformity Beverly Chenausky Multimodal Planning Division – Air Quality Breakout Session: Transportation Conformity/Air.
Inventory Needs and Legal Requirements Martin Johnson Emission Inventory Workshop Air Resources Board March 13, 2006.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
2012 Spring Business Meeting Seattle, Washington.
Distinguishing: Clean Air Act, EPA Rules, Regulations and Guidance David Cole U.S. EPA, OAQPS Research Triangle Park, NC.
1 CCOS Update November 3, 2006 PC Meeting Project Status –Completed Projects Results –On-Going Projects Status Plan for CCOS Final Phase –Guiding Principles.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
EPA’s DRAFT SIP and MODELING GUIDANCE Ian Cohen EPA Region 1 December 8, 2011.
September Lori Hanson, Lead worker Dispersion Modeling (515)
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
WRAP Update WESTAR Meeting San Francisco April 25, 2011.
Clean Air Act and New Source Review Permits EPA Office of Air Quality Planning and Standards Research Triangle Park NC March
ANPR: Transition to New or Revised PM NAAQS WESTAR Business Meeting March 2006.
National Ambient Air Quality Standards and Current Status of Air Quality Laura Boothe North Carolina Division of Air Quality MCIC Workshops March 2012.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
Designations for 24-Hour PM2.5 NAAQS: Overview and Guidance Amy Vasu PM2.5 Workshop June 20-21, 2007.
Final Clean Air Fine Particle Implementation Rule Briefing for NTAA EPA Office of Air Quality Planning and Standards April 17, 2007.
WESTAR National Air Monitoring Steering Committee Update Spring Business Meeting 2010 Denver, CO Bruce Louks, Idaho DEQ.
1 Exceptional Events Rulemaking Proposal General Overview March 1, 2006 US EPA.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
WRAP Workshop July 29-30, 2008 Potential Future Regional Modeling Center Cumulative Analysis Ralph Morris ENVIRON International Corporation Novato, California.
Proposed Revisions to the Guideline on Air Quality Models
CALIFORNIA’S AIR TOXICS PROGRAM: IMPROVEMENTS TO ASSESS HEALTH RISK Update to the Air Resources Board July 24, 2014 California Environmental Protection.
1 Modeling Under PSD Air quality models (screening and refined) are used in various ways under the PSD program. Step 1: Significant Impact Analysis –Use.
CAA Program Reporting Clarification Regarding Federally-Reportable Violations for Clean Air Act Stationary Sources (March 2010) (FRV Clarification Memo)
1 Status of SO 2 Implementation and Modeling Issues Michael Ling Associate Director, Air Quality Policy Division U.S. EPA, Office of Air Quality Planning.
NSR and Title V Activities WESTAR Business Meeting May 2005.
Exceptional Events and Fire Policy Presented by Don Hodge, U.S. EPA Region 9 Interagency Air and Smoke Council meeting May 2, 2012 Disclaimer: Positions.
Work Related to Senate Bill 2202 (effective January 1, 2001)
SO 2 NAAQS Modeling MassCAIR Stakeholder Meeting December 13, 2011.
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
Stephen F. Austin State University February 27, 2014 Justin Cherry, P.E. Reece Parker TCEQ Air Permits Division.
N EW Y ORK S TATE D EPARTMENT OF E NVIRONMENTAL C ONSERVATION Short Term Ambient Air Quality Standards and The Effect on Permitting Margaret Valis NESCAUM,
Miscellaneous Stuff William Harnett WESTAR Spring Meeting April 3, 2007.
NAAQS Status in GA & PSD Inventory Update James W. Boylan Georgia EPD – Air Protection Branch Manager, Planning & Support Program AWMA Regulatory Update.
OAQPS Update NESCAUM PMC Meeting New London, CT May 30, 2007.
Regulatory background How these standards could impact the permitting process How is compliance with the standards assessed.
Air Modeling Updates 2015 Region 4 Grants/Planning Meeting May 19-21, 2015 Atlanta, Georgia 1.
OAQPS Update June 24, NESCAUM PMC Annual Meeting.
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
WESTAR Increment Recommendations
Draft Modeling Protocol for PM2.5
Bill Harnett WESTAR Spring Meeting April 8, 2009
NACAA Permitting Workshop, Chicago June 14, 2011
John Bunyak National Park Service
SDWA Collaborative Efforts Overview
Exceptional and Natural Events Rulemaking
Revisions to the Guideline on Air Quality Models (GAQM)
EPA/OAQPS Pollutant Emissions Measurement Update 2019
Presentation transcript:

Ongoing Model Updates and Related Activities for NAAQS Compliance 2012 Region 4 Modelers Workshop Region 4 Office, Atlanta, GA George M. Bridgers OAQPS-AQAD-Air Quality Modeling Group 1U.S. Environmental Protection Agency11/13/2012

Need for Agency to Address Chemistry under Appendix W Sierra Club filed a lawsuit against EPA on August 31, 2011 alleging that EPA is unreasonably delayed in : –responding to an administrative petition for rulemaking to identify air quality models for ozone and PM2.5 to use in evaluating applications for PSD permits under the Clean Air Act, and –taking action required under the Clean Air Act §165(e)(3)(D) to designate such models through rulemaking. Gina McCarthy letter on January 4, 2012 granting Sierra Club petition... –to engage in rule making to evaluate updates to Appendix W and, as appropriate, incorporate new analytical techniques or models for ozone and secondary PM2.5. –use the existing process and procedures under Section 320 of the Clean Air Act (CAA) to complete the appropriate rulemaking process to update Appendix W. 2U.S. Environmental Protection Agency11/13/2012

10 th Conference on Air Quality Modeling Three day conference on regulatory air quality modeling held in RTP, NC on March 13-15, Clean Air Act mandated (Section 320) conference that has a projected frequency of every 3 years. Public forum for the regulatory, regulated, and research communities to meet and discuss all aspects of the regulatory air quality models and modeling techniques as well as engage on needed updates and amendments to the Guideline on Air Quality Models (Appendix W to 40 CFR Part 51). 3U.S. Environmental Protection Agency11/13/2012

10 th Conference on Air Quality Modeling Day 1 and 2 of the conference included presentations by EPA and invited speakers on the current status of the regulatory air quality models, areas of model development, and emerging models and modeling techniques. Day 3 was a full day of public comment and presentation. Conference website posted on EPA’s SCRAM website: – 4U.S. Environmental Protection Agency11/13/2012

10 th Conference on Air Quality Modeling Presentations posted immediately after conference: – Full transcription posted on June 21, 2012: – (Follow Links) Summary of Comments document including an overview of next steps and action items posted on October 5, 2012: – y_of_Comments-Revised_ pdfhttp:// y_of_Comments-Revised_ pdf Response to Comments document projected for delivery at the end of the calendar year U.S. Environmental Protection Agency11/13/2012

Formal plan for updates to Appendix W Goal to have a draft plan available in early Discussion at A&WMA specialty conference and the 2013 RSL Modelers’ Workshop in spring 2013 (Information on these meetings on next slide). Revised draft plan based on engagement and feedback available soon thereafter. Rule making proposal for language amendments and updates to Appendix W released for public comment and response in connection with the 11 th Conference on Air Quality Modeling (late 2014 / early 2015). Coordination with AQPD on harmonizing the App W rulemaking with associated NSR/PSD implementation rulemaking, e.g., address SERs/SILs/SMCs, Increment, other issues) 6U.S. Environmental Protection Agency11/13/2012

Upcoming Conferences / Workshops 2013 A&WMA Specialty Conference: –“Guideline on Air Quality Models: The Path Forward” –March 19-21, 2013, Sheraton Raleigh Hotel, Raleigh, NC. – content/uploads/2012/09/AQ_Models_CFA.pdf content/uploads/2012/09/AQ_Models_CFA.pdf 2013 Regional, State, and Local Modelers’ Workshop: –April 22-25, 2013, EPA’s Region 6 office in Dallas, TX. –Open (regulatory, industrial, consultant / contractor, environmental, public) participation day on Tuesday, April 23. –Workshop information will be posted on EPA’s SCRAM website in December 2012 or early January U.S. Environmental Protection Agency11/13/2012

Interagency Workgroup on Air Quality Modeling (IWAQM) Phase III Effort IWAQM was originally formed in 1991 to provide a focus for development of technically sound regional air quality models for regulatory assessments of pollutant source impacts on Federal Class I areas. –Phase 1 consisted of reviewing EPA guidance and recommending an interim modeling approach to meet the immediate need for a LRT model for ongoing permitting activity –Phase 2 report provided a series of recommendations concerning the application of the CALPUFF model for use in long range transport (LRT) modeling that informed EPA’s promulgation in 2003 of CALPUFF. Phase 3 focus on next generation model to meet Federal program needs such as –Single source ozone and secondary PM2.5 –AQRVs (visibility and deposition) Latest efforts by EPA and FLMs reported during 10 th Modeling Conference session on “Emerging Models and Techniques” 8U.S. Environmental Protection Agency11/13/2012

IWAQM Phase 3: Initial Products Complete development, documentation and evaluation of the Mesoscale Model Interface (MMIF) program –Converts MM5 or WRF meteorological output to CALPUFF, AERMOD, and SCICHEM-ready meteorological inputs Document LRT model evaluation against tracer test data for CALPUFF (CALMET & MMIF), HYSPLIT, FLEXPART, SCIPUFF/SCICHEM, CMAQ and CAMx –1992 European Tracer Experiment (ETEX) –1983 Cross-Appalachian Tracer Experiment (CAPTEX) –1980 Great Plains Tracer Experiment (GR80) –1975 Savannah River Laboratory (SRL75) Comparison of single-source estimation techniques for O3 & AQRV –2006 Eastern Utah and western Colorado (UT-CO) 12 m domain –2005 Four Corners Air Quality Task Force (FCAQRF) 12/4 km domain Plume chemistry model evaluation (SCICHEM, CMAQ, etc) –TVA Cumberland Plume 1999 Southern Oxidant Study –2000 TexAQS Aircraft Measurements 9U.S. Environmental Protection Agency11/13/2012

AERMOD Modeling System Updates Updates based on comments received through the 10 th Modeling Conference and other engagements, previously identified needs, and ongoing feedback from the regulated modeling community. Near-term (updated release in late November) : –Addition of a minimum wind speed threshold option for 1-min ASOS wind data in AERMET (to be addressed in pending Clarification Memo). –A few bug fixes to AERMET and minor enhancements. 10U.S. Environmental Protection Agency11/13/2012

AERMOD Modeling System Updates Near-term – Continued: –“Beta option” in AERMET addressing "low wind speed" issue based on review of 10th Modeling Conference comments input from AERMIC committee and other published literature. EPA evaluations demonstrating appropriateness and improved performance as compared to API/AECOM proposal. Potential changes to AERMOD related to “low wind speed” issue also being evaluated. –Considering updates incorporating EPA's ORD development of enhanced line-source characterization and algorithm focused on near-road environment. ORD delivered drafts of A-LINE (previously called AERLINE) to the Air Quality Modeling Group on 9/19/12. AQMG coordinated review and comment across OAR (e.g., OTAQ) and continuing interactions with ORD on this research effort. 11U.S. Environmental Protection Agency11/13/2012

AERMOD Modeling System Updates Longer-term (FY13+) : –Reviewing issues with building characterization and downwash algorithms, seeking ORD support for wind tunnel and related research. –Reviewing issues and options for NO 2 chemistry in AERMOD. –Potential enhancement to include buoyant line source option in AERMOD, as alternative to current BLP model. –Further evaluation of AERMOD-COARE and potential platform downwash option in AERMOD to address offshore sources, as an alternative to current OCD model, in coordination with Region 10. –Evaluation of prognostic meteorological data processing tool (MMIF) for application in AERMOD. MMIF would allow the use of meteorological models to generate the necessary representative meteorological data for near-field dispersion / NAAQS compliance demonstrations. 12U.S. Environmental Protection Agency11/13/2012

CALPUFF Modeling System Updates EPA’s regulatory CALPUFF version 5.8 Modeling System updated to include newer version of the post processing program, CALPOST, on August 27, 2012: –CALPOST version (level ) includes the "Method 8" IMPROVE equation revision per the Federal Land Managers' Air Quality Related Values Work Group (FLAG) revised October 2010 Phase 1 Report. – Updates to the regulatory CALPUFF version 5.8 to address known bug fixes –Met with Federal Land Managers and working to modify and test code updates for provision to TRC by the end of Next steps (FY13+) are to evaluate models (CALPUFF, CAMX, etc.) as eventual replacement for CALPUFF to deal with chemistry for PM2.5 & Ozone. 13U.S. Environmental Protection Agency11/13/2012

SO2 NAAQS Activities Reviewing 09/2012 beta release of EPRI funded variable emissions tool, EMVAP, and related programs for consideration as part of future state attainment demonstrations in determining enforceable limits: –Planning discussions with EPRI immediately following the CMAS conference in October – Updating SO2 SIP modeling guidance for attainment demonstrations (late 2012 / early 2013). 14U.S. Environmental Protection Agency11/13/2012

SO2 NAAQS Activities Review and comments on evaluations of AERMOD modeling of current SO2 sources, ongoing with updated reports by states and/or EPA presentations in future. 15U.S. Environmental Protection Agency11/13/2012

NO2 NAAQS Activities Released NO2 In-Stack Ratio (ISR) database on EPA’s SCRAM website on August 30, 2012: –Completed through small workgroup of EPA, state, and local agency modelers. – Continue working with API and their contractors on ARM2 as a modified NO2 Tier 2 method: –Reviewing documentation and evaluations, awaiting updates with specifics on how to implement within AERMOD. –Upon full receipt, EPA will independently verify evaluations and, as appropriate, write a guidance memorandum on how ARM2 may be used for permitting applications. 16U.S. Environmental Protection Agency11/13/2012

NO2 NAAQS Activities Engaging with stakeholders on evaluations of NO2 Tier 3 approaches of OLM and PVMRM (longer term). Advocating for new field studies to allow more full evaluation so these Tier 3 approaches could be characterized as refined methods as part of the planned regulatory update to Appendix W. 17U.S. Environmental Protection Agency11/13/2012

PM2.5 NAAQS Activities Completed technical memorandum demonstrating basis for surrogacy policy to address PSD requirements of potential secondary visibility index standards as part of proposed PM2.5 NAAQS. Completing draft PM2.5 Permit Modeling Guidance: –Public release by December 14 th with final PM NAAQS rule. –Allow for public comments on draft guidance document prior to “finalizing” in early Discussions on SCICHEM and CMAQ-APT with EPRI and contractors (Sage Management & Environ) during CMAS conference in October U.S. Environmental Protection Agency11/13/2012

Roadway Modeling Activities w/ OTAQ PM Hot Spot Conformity requirements take effect in December, requiring project level modeling for many new roadway projects: –Reviewed and commented on preliminary Hot Spot analysis submitted by state DOTs. –Reviewed CAL3QHCR model updates submitted by FHWA but significant concerns were noted with their submittal. –In parallel, AQMG is making updates to CAL3QHCR to meet conformity requirements and will be consistent with what EPA-FHWA has used in the PM hot-spot training. –Reviewed and commented on AERMOD and CAL3QHCR comparisons completed by FHWA. 19U.S. Environmental Protection Agency11/13/2012

Roadway Modeling Activities w/ OTAQ Planned updates to Conformity guidance for annual NAAQS occurring in the next 2 months. Review and comment to Region 9 on NEPA EIA modeling for I-710 freeway expansion project Central coordination w/ ORD on research efforts –As mentioned previously, reviewing formulation and documentation of their new line source model, A-LINE (formerly AERLINE). –Evaluation of the line source algorithm/model for potential implementation into AERMOD. Ultimate determination of what Appendix W updates are necessary to appropriate address dispersion modeling of mobile & related sources. 20U.S. Environmental Protection Agency11/13/2012

Planned Clarification Memorandum Meteorological data and use of AERMINUTE: –Recommend 0.5 m/s wind speed threshold option for 1-min ASOS wind data consistent with site-specific met guidance. –To be issued with the near-term AERMOD package update. GEP stack height changes in AERMOD: –Legal and policy basis for change. –Release late 2012 or early Monitoring in lieu of modeling under Section 10 of Appendix W: –Clarify key criteria to be met and issues to be addressed. –Release late 2012 or early U.S. Environmental Protection Agency11/13/2012

Planned Clarification Memorandum Further clarifications on Appendix W guidance regarding inventory of modeled sources and extent of modeling domain: –More detailed discussion and examples of “significant concentration gradient” criterion for identifying “nearby” sources for permitting under PM2.5 and 1-hour NAAQS. –Discussion of Appendix W guidance for extent of modeling domain and receptor placement and issues related to use of Significant Impact Levels (SILs) in compliance demonstrations –Further debunk Draft NSR Workshop Manual (aka “Puzzle Book”) as basis for NSR/PSD permit modeling. –Release early U.S. Environmental Protection Agency11/13/2012

Fugitives Source Characterization Continued review of the comments at the 10 th Modeling Conference (NMA and related) : –Aforementioned Response to Comments document and formal plan for Appendix W updates (late 2012 / early 2013). Continued investigation of comments related to “Low wind speed” issue: –AERMET minimum wind speed threshold option. –AERMOD “beta option” for addressing low wind speeds. –Additional evaluation of AERMOD with low wind speed databases and field study information. Further consideration of the final recommendations from the Haul Roads Workgroup. 23U.S. Environmental Protection Agency11/13/2012

Questions and Comments George M. Bridgers Tyler Fox U.S. Environmental Protection Agency11/13/2012

Action Items from Conference 255/2/2012U.S. Environmental Protection Agency Fact Checking Previously Proposed Timelines

Current Action Items: AERMOD Clarification memo on GEP stack height and on AERMINUTE/AERMET to establish minimum wind speed threshold Follow up on low wind speed and downwash issues with stakeholder community (including EPA’s ORD) to determine possible model formulation updates Consider near-term options for updates to NO2 Tier 2 ambient ratio method based on API sponsored approach, i.e., ARM2. Continue work with community on evaluation of NO2 Tier 3 techniques (OLM and PVMRM) and discuss potential for new field studies Work with modeling community on development of NO/NO2 in- stack ratio database 265/2/2012U.S. Environmental Protection Agency

Current Action Items: AERMOD Clarification memo on GEP stack height and on AERMINUTE/AERMET to establish minimum wind speed threshold Follow up on low wind speed and downwash issues with stakeholder community (including EPA’s ORD) to determine possible model formulation updates Consider near-term options for updates to NO2 Tier 2 ambient ratio method based on API sponsored approach, i.e., ARM2. Continue work with community on evaluation of NO2 Tier 3 techniques (OLM and PVMRM) and discuss potential for new field studies Work with modeling community on development of NO/NO2 in- stack ratio database 275/2/2012U.S. Environmental Protection Agency Soon to be released with AERMOD/AERMET update Threshold and beta u* additions focus of model updates and recent engagements with EPA-ORD Ongoing interactions with API and their contractors Some energy with WESTAR, engagements with industry, and A&WMA specialty conference ISR database released on SCRAM at end of summer… still no formal submissions by community

Current Action Items: CALPUFF Discussed ‘bug fixes’ with FLMs in early April and now working to address them in updated regulatory version of modeling system –Conduct assessment with update tool to determine implications –Document assessment and work with TRC (model developer) to formally release updated model code and documentation 285/2/2012U.S. Environmental Protection Agency

Current Action Items: CALPUFF Discussed ‘bug fixes’ with FLMs in early April and now working to address them in updated regulatory version of modeling system –Conduct assessment with update tool to determine implications –Document assessment and work with TRC (model developer) to formally release updated model code and documentation 295/2/2012U.S. Environmental Protection Agency Ongoing coordination with TRC, but OAQPS is moving forward with incorporating the appropriate bug fixes in the current release version (v5.8) of CALPUFF. Formal release scheduled for early 2013 depending on full delivery from contractor and completing proper evaluations and documentation.

Ongoing Agency Activities Emphasize flexibility in existing guidance (e.g., post- construction monitoring) and issue new guidance as necessary for new 1-hour NAAQS permitting and implementation and to address reactive pollutants Continue working with co-regulators and stakeholders especially through workgroups: –AERMOD implementation workgroup (AIWG) focusing on issues with model demonstrations of compliance for NO 2 and SO 2 –Technical Workgroup of stakeholders that assisted EPA in planning agenda and speakers for 10 th Modeling Conference with plans to continue for improved communication/coordination –Interagency Workgroup on Air Quality Models (IWAQM) focusing on next generation model(s) to meet Federal program needs 305/2/2012U.S. Environmental Protection Agency

Ongoing Agency Activities Emphasize flexibility in existing guidance (e.g., post- construction monitoring) and issue new guidance as necessary for new 1-hour NAAQS permitting and implementation and to address reactive pollutants Continue working with co-regulators and stakeholders especially through workgroups: –AERMOD implementation workgroup (AIWG) focusing on issues with model demonstrations of compliance for NO 2 and SO 2 –Technical Workgroup of stakeholders that assisted EPA in planning agenda and speakers for 10 th Modeling Conference with plans to continue for improved communication/coordination –Interagency Workgroup on Air Quality Models (IWAQM) focusing on next generation model(s) to meet Federal program needs 315/2/2012U.S. Environmental Protection Agency Ongoing… Some additional AWIG work over the summer Limited engagements over the summer… next call will be in mid-November Need for formal interactions on heels of CMAS…

Immediate Next Steps Post additional LRT evaluation reports to SCRAM by mid-May Release the draft PM2.5 Permit Modeling Guidance for comment and review Public comment period has been extended through June 15, 2012 Public comment summary & response to comment document under development (Joe Tikvart is assisting the AQMG) 325/2/2012U.S. Environmental Protection Agency

Immediate Next Steps Post additional LRT evaluation reports to SCRAM by mid-May Release the draft PM2.5 Permit Modeling Guidance for comment and review Public comment period has been extended through June 15, 2012 Public comment summary & response to comment document under development (Joe Tikvart is assisting the AQMG) 335/2/2012U.S. Environmental Protection Agency Unable to post due to deficiencies / issues in reports Well overdue… “very soon” It was and we ultimately received 38 well developed formal comments Release of Comment Summary document a few weeks back and Response to Comment document getting underway