September 2004 United Nations Economic Commission for Europe1 The UNECE Convention on Environmental Impact Assessment (EIA) in a Transboundary Context.

Slides:



Advertisements
Similar presentations
Overview of the Basel Convention and Basel Protocol: History and Goals Ms. Donata Rugarabamu Senior Legal Officer Secretariat of the Basel Convention Regional.
Advertisements

Overview of the Basel Convention and Basel Protocol: History and Goals Laura Thompson Legal Expert Secretariat of the Basel Convention Regional Workshop.
Rule-Making Book II EU Administrative Procedures – The ReNEUAL Draft Model Rules 2014 Brussels, May th Herwig C.H. Hofmann University of Luxembourg.
1 Strategic Environmental Assessment and SFs Operational Programmes: An assessment Jonathan Parker DG ENV ENVIRONMENT EUROPEAN COMMISSION Aarhus Workshop.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Scoping in the EIA process Proposal Identification Screening
Sources of Law Dr Y Scannell. Different kinds of law International European Domestic or Irish law Common law – the law made by the courts throughout the.
December 2007 United Nations Economic Commission for Europe1 UNECE Protocol on Strategic Environmental Assessment (SEA) An Introduction.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Monitoring.
Making Aarhus work in international forums A workshop on promoting the application of the principles of the Aarhus Convention in international forums Geneva,
Convention on Environmental Impact Assessment in a Transboundary Context (Espoo, 1991) UNECE Secretariat Moscow, 21 September 2007.
EU: Bilateral Agreements of Member States. Formerly concluded international agreements of Member States with third countries Article 351 TFEU The rights.
Secretariat to the Espoo Convention and its Protocol on SEA
Strategic Environmental Assessment and environmental issues in programme evaluation Ivana Capozza Italian Evaluation Units Open Days Roma, July 5, 2006.
Environmental Impact Assessment (EIA): Overview
Jerzy Jendrośka Introduction to the Environmental Impact Assessment (EIA) and the Strategic Environmental Assessment (SEA) Directives INTERACTION BETWEEN.
Implementing the Second Pillar of the Aarhus Convention: Problems Identified in the National Implementation Reports Magda Tóth Nagy, Senior Expert Geneva,
UNECE and OSCE joint event, Almaty, May 2012
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
The Aarhus & Espoo Conventions Making implementation work for stakeholders.
Overview of the Rotterdam Convention. Sub-regional Consultation for DNAs 2 Overview of the Rotterdam Convention Structure of the presentation Part 1 -Introduction.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
0 Tadas Matulionis Lietuvos Energija AB Strategic planning manager Minsk, December 07, 2007 Environmental Impact Assessment of a New Nuclear Power Plant.
Espoo Convention on Environmental Impact Assessment in a Transboundary Context Workshop on “Making Aarhus work in international forums” Geneva, 23 February.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Jerzy Jendrośka Energy security and legal requirements for environmental protection, public involvement and transboundary co-operation Scientific support.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
CARTAGENA PROTOCOL ON BIOSAFETY NDA- DEAT BILATERAL MEETING 1 August 2003 Presenter : M. Mbengashe.
Inclusion of Persons with Disabilities in Development Cooperation Training course Brussels, 29 th & 30 th November 2012 Module 3: The CRPD as a key driver.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Convention on Environmental Impact Assessment in a Transboundary Context (Espoo, 1991) Wiek Schrage, Secretary to the EIA Convention Moscow, 21 September.
EU Member State experience in implementing the Espoo Convention ESTONIA 21 September 2007, Moscow.
Environmental Impact Assessment in the Slovak republic.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
Espoo Convention on Environmental Impact Assessment in a Transboundary Context Peter Croal CIDA February 27, 2012.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES Public Involvement EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE.
SPS Workshop Taipei, 5-6/12/2001 The Transparency Provisions of the SPS Agreement.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
The European SEA Directive Simon Marsden School of International Business, University of South Australia Module 1: Basics of SEA.
Cartagena Protocol on Biosafety Cartagena Protocol on Biosafety And India’s Obligations By Desh Deepak Verma Joint Secretary, Ministry of Environment and.
Environmental Dialogue between of Ministry of Natural Resources of Russia and the European Commission, DG Environment Workshop on The Espoo Convention.
SEA in the Czech Republic Prague, 24 September 2008.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Finland’s experience in implementing and applying the Espoo Convention Seija Rantakallio Councellor Moscow, 21 September.
Biosafety Clearing House Training Workshop date place.
IAIA Conference on international experience & perspectives in SEA, Prague, September 2005 IAIA Conference on international experience & perspectives.
INTERNATIONAL AND TRANSBOUNDARY ENVIRONMENTAL ASSESSMENT LAW OCTOBER 29, 2012.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Convention on Environmental Impact Assessment in a Transboundary Context (Espoo, 1991) Task Force on Public Participation in Decision-making Aarhus Convention,
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE The role of EIA and decision-making.
Peter Lukáč Ministry of Environment of the Slovak Republic Department of Environmental Assessment.
1 Legal Frameworks for Public and Stakeholder Engagement by Carl Bruch Asia Regional Workshop on Stakeholder Engagement in International Waters Management.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
process and procedures for assessments
EIA approval process, Management plan and Monitoring
Overview of public participation in strategic decision-making in the UNECE area David Aspinwall.
Environmental assessment system in Finland
14-16 September 2016, Wrocław, Poland
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Towards Modern Environmental Impact Assessment (EIA) in Uzbekistan
Jerzy Jendrośka Transboundary procedures
Nick Bonvoisin Secretary to the Convention on the
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
World Health Organization
Magdalena Bar Annual EELF Conference 2016
Meeting of PAP/RAC Focal Points, Split, Croatia, 8-9 May 2019
Ratification of the UNECE Protocol on Pollutant Release
Roles and Responsibilities
Presentation transcript:

September 2004 United Nations Economic Commission for Europe1 The UNECE Convention on Environmental Impact Assessment (EIA) in a Transboundary Context An Introduction

September 2004 United Nations Economic Commission for Europe2 Contents of the EIA Convention Presentation  Introduction  The Convention  Amendment & Protocol  History, including current status  Organigram  Further information  Main Procedural Steps  Summary  Flow chart  Detailed provisions  Work-Plan for the Implementation of the Convention

September 2004 United Nations Economic Commission for Europe3 Introduction – the Convention  The Convention on Environmental Impact Assessment (EIA) in a Transboundary Context stipulates the obligations of Parties to assess the environmental impact of certain activities at an early stage of planning  It also lays down the general obligation of States to notify and consult each other on all major projects under consideration that are likely to have a significant adverse environmental impact across national boundaries  The EIA Convention (or ‘Espoo Convention’) was adopted at Espoo (Finland) in 1991  The Convention entered into force on 10 September 1997

September 2004 United Nations Economic Commission for Europe4 Introduction – amendment & protocol  An amendment to the Convention was adopted in 2001  It clarifies that the public that may participate in procedures under the Convention includes civil society and, in particular, nongovernmental organizations  It allows States situated outside the UN/ECE region to become Parties to the Convention  A second amendment was adopted in 2004  Allows, as appropriate, affected Parties to participate in defining the scope of transboundary EIA  Provides for reviews of compliance  Revises the Appendix I (list of activities)  The Convention has been supplemented by a Protocol on Strategic Environmental Assessment, adopted 21 May 2003, at Kiev (Ukraine) and subsequently signed by 36 States and the European Community

September 2004 United Nations Economic Commission for Europe5 Introduction - history  Seminar on Environmental Impact Assessment, Warsaw Poland, 1987  Negotiations on the Convention 1988 – end 1990 (six meetings)  1991 signing of the Convention in Espoo (Finland)  September 1997 – Entry into Force of the Convention  May 1998 – 1 st Meeting of the Parties, Oslo  February 2001 – 2 nd Meeting of the Parties, Sofia  June 2004 – 3 rd Meeting of the Parties, Cavtat (Croatia)  Of 55 UNECE member states, currently 40 Parties (39 countries & the European Community) – see next slide

September 2004 United Nations Economic Commission for Europe6 Signed Ratified, etc. Ratified Convention & 1 st Amendment

September 2004 United Nations Economic Commission for Europe7 Introduction – organigram Meeting of the Parties Working Group on Environmental Impact Assessment Implementation Committee Secretariat Bureau The Convention is overseen by the Meeting of the Parties (MOP), which met in and The MOP is supported by its Bureau and by the Convention Secretariat. The MOP has established a Working Group on EIA and an Implementation Committee. (It also established an Ad hoc Working Group on the Protocol on Strategic Environmental Assessment but this has now completed its work.)

September 2004 United Nations Economic Commission for Europe8 Introduction – further information  Further information, including the text of the Convention, may be found at the Convention web site (

September 2004 United Nations Economic Commission for Europe9 Provisions  The following slides show:  The main procedural steps (2 slides)  A flow chart representation of these steps (2 slides)  The detailed provisions of the Convention for each of these steps (12 slides)

September 2004 United Nations Economic Commission for Europe10 Main Procedural Steps (1/2)  Application of the Convention (Articles 2.2 & 2.5, Appendices I & III)  Notification (Article 3.1)  Confirmation of participation (Article 3.3)  Transmittal of information (Article 3.6)  Public participation (Article 3.8)  Preparation of EIA documentation (Article 4, Appendix II) Determine whether a project should be subject to the Convention’s provisions The Party of origin notifies the affected Party (or Parties) The affected Party indicates whether it wishes to participate The affected Party provides information on the potentially affected environment The public in the affected Party is informed of the proposed project and may comment on or object to it The EIA documentation is prepared

September 2004 United Nations Economic Commission for Europe11 Main Procedural Steps (2/2)  Distribution of the EIA documentation for the purpose of participation of authorities and public of the affected country (Article 4.2)  Consultation between Parties (Article 5)  Final decision (Article 6.1)  Transmittal of final decision documentation (Article 6.2)  Post-project analysis (Article 7.1, Appendix V) The Party of origin provides the EIA documentation to the affected Party, which then distributes it The Party of origin and the affected Party consult on alternatives, mitigation measures, monitoring, mutual assistance and other matters A decision is made on the project taking into account the outcome of the EIA documentation and comments received That decision is provided to the affected Party, along with the reasons and considerations on which it was based The Convention provides for post-project analysis, as necessary

September 2004 United Nations Economic Commission for Europe12 Flow Chart of procedural steps (1/2)

September 2004 United Nations Economic Commission for Europe13 Flow Chart of procedural steps (2/2) Preparation of EIA documentation (Content of EIA documentation as Appendix II) (article 4.1) Transmittal of EIA documentation: The Party of origin shall the affected Party with the EIA documentation. The documentation will be distributed to the authorities and the public of affected Party. Comments to the Party of origin “within a reasonable time frame before the final decision is taken”. (article 4.2) Consultation: “After completion of the EIA documentation without undue delay” Parties shall enter into consultation. (article 5) Final decision: Final decision on planned activity taking into account EIA documentation, comments and outcome consultation. (article 6.1) Transmittal of final decision: Party of origin shall submit documentation related to the final decision to the affected Party. (article 6.2) [Ex post] [Post-project] analysis: At request of one Party, the concerned Parties shall determine whether an [Ex post] [Post-project] analysis shall be carried out. (article 7.1) Analysis undertaken (article 7.1) PPA follow-up: When, as a result of a PPA, a Party has reasonable ground that there are, or are likely to be, significant transboundary impacts, the other Party will be informed. The concerned Parties shall then consult on necessary actions. (article 7.2) Yes No No analysis undertaken

September 2004 United Nations Economic Commission for Europe14 General Provisions (Article 2)  2. Each Party shall take the necessary legal, administrative or other measures to implement the provisions of this Convention, including, with respect to proposed activities listed in Appendix I that are likely to cause significant adverse transboundary impact, the establishment of an EIA procedure that permits public participation and preparation of the EIA documentation described in Appendix II. Each Party to the Convention has to establish an EIA procedure for the activities listed in the appendix (see next slide). The procedure has to allow for public participation as well as preparation of the EIA report.

September 2004 United Nations Economic Commission for Europe15 List of Activities (abbreviated) (Appendix I) 1. Crude oil refineries, installations for gasification & liquefaction of coal/shale 2. Large thermal power stations, nuclear power stations, other nuclear reactors 3. Installations for production/enrichment of nuclear fuels, reprocessing of irradiated nuclear fuels or storage, disposal, processing of radioactive waste 4. Major installations for smelting cast-iron, steel & production of non-ferrous metals 5. Installations for the extraction, processing & transformation of asbestos 6. Integrated chemical installations 7. Construction of motorways, express roads, long-distance railway lines, large airports 8. Large-diameter oil and gas pipelines 9. Trading ports, large inland waterways & ports for inland-waterway traffic 10. Installations for incineration/chemical treatment/landfill of toxic & dangerous wastes 11. Large dams and reservoirs 12. Major groundwater abstraction activities 13. Large-scale pulp and paper manufacturing 14. Major mining, on-site extraction & processing of metal ores/coal 15. Offshore hydrocarbon production 16. Major storage facilities for petroleum, petrochemical & chemical products 17. Deforestation of large areas

September 2004 United Nations Economic Commission for Europe16 Notification (Article 3) 1. For a proposed activity listed in Appendix I that is likely to cause a significant adverse transboundary impact, the Party of origin shall, for the purposes of ensuring adequate and effective consultations under Article 5, notify any Party which it considers may be an affected Party as early as possible and no later than when informing its own public about that proposed activity. For such activities, the ‘Party of origin’ must inform any potentially ‘affected Party’ no later than it informs its own public.

September 2004 United Nations Economic Commission for Europe17 Confirmation of Participation (Art. 3) 3. The affected Party shall respond to the Party of origin within the time specified in the notification, acknowledging receipt of the notification, and shall indicate whether it intends to participate in the EIA procedure. The affected Party then indicates whether it wishes to participate in the EIA procedure for the activity.

September 2004 United Nations Economic Commission for Europe18 Transmittal of Information (Art. 3) 6. An affected Party shall, at the request of the Party of origin, provide the latter with reasonably obtainable information relating to the potentially affected environment under the jurisdiction of the affected Party, where such information is necessary for the preparation of the EIA documentation. The information shall be furnished promptly and, as appropriate, through a joint body where one exists. The affected Party then has to provide the Party of origin with relevant information on the potentially affected environment within its territory so that the EIA can take it fully into account.

September 2004 United Nations Economic Commission for Europe19 Public Participation (Art. 3) 8. The concerned Parties shall ensure that the public of the affected Party in the areas likely to be affected be informed of, and be provided with possibilities for making comments or objections on, the proposed activity, and for the transmittal of these comments or objections to the competent authority of the Party of origin, either directly to this authority or, where appropriate, through the Party of origin. The two Parties then have to make sure that the public in the affected Party have the opportunity to comment on the proposed activity and that these comments reach the competent authority in the Party of origin.

September 2004 United Nations Economic Commission for Europe20 Content of the EIA documentation (abbreviated) (Appendix II, to Art. 4) Information to be included in the EIA documentation shall, as a minimum, contain, in accordance with Article 4: (a) A description of the proposed activity and its purpose; (b) A description, where appropriate, of reasonable alternatives to the proposed activity and also the no-action alternative; (c) A description of the environment likely to be significantly affected by the proposed activity and its alternatives; (d) A description of the potential environmental impact of the proposed activity and its alternatives and an estimation of its significance; (e) A description of mitigation measures to keep adverse environmental impact to a minimum; (f) An explicit indication of predictive methods and underlying assumptions as well as the relevant environmental data used; (g) An identification of gaps in knowledge and uncertainties encountered in compiling the required information; (h) Where appropriate, an outline for monitoring and management programmes and any plans for post-project analysis; and (i) A non-technical summary including a visual presentation as appropriate (maps, graphs, etc.).

September 2004 United Nations Economic Commission for Europe21 Distribution of EIA documentation (Article 4) 2. The Party of origin shall furnish the affected Party, as appropriate through a joint body where one exists, with the EIA documentation. The concerned Parties shall arrange for distribution of the documentation to the authorities and the public of the affected Party in the areas likely to be affected and for the submission of comments to the competent authority of the Party of origin, either directly to this authority or, where appropriate, through the Party of origin within a reasonable time before the final decision is taken on the proposed activity. The Party of origin has to provide EIA documentation to the affected Party. The Parties then arrange distribution of the documentation to the public and authorities of the affected Party.

September 2004 United Nations Economic Commission for Europe22 Consultation between Parties (Art. 5) The Party of origin shall, after completion of the EIA documentation, without undue delay enter into consultations with the affected Party concerning, inter alia, the potential transboundary impact of the proposed activity and measures to reduce or eliminate its impact. Consultations may relate to: a) Possible alternatives to the proposed activity, including the no- action alternative and possible measures to mitigate significant adverse transboundary impact and to monitor the effects of such measures at the expense of the Party of origin; b) Other forms of possible mutual assistance in reducing any significant adverse transboundary impact of the proposed activity; and c) Any other appropriate matters relating to the proposed activity. The Parties shall agree, at the commencement of such consultations, on a reasonable time-frame for the duration of the consultation period. Any such consultations may be conducted through an appropriate joint body, where one exists. The two Parties work together to minimise or eliminate any adverse environmental impact. They examine alternatives and develop mitigation (and monitoring) measures.

September 2004 United Nations Economic Commission for Europe23 Final Decision (Article 6) 1. The Parties shall ensure that, in the final decision on the proposed activity, due account is taken of the outcome of the EIA, including the EIA documentation, as well as the comments thereon received pursuant to Article 3, paragraph 8 and Article 4, paragraph 2, and the outcome of the consultations as referred to in Article 5. The final decision on the proposed activity has to take account of comments received and the results of the consultations.

September 2004 United Nations Economic Commission for Europe24 Transmittal of final decision (Art. 6) 2. The Party of origin shall provide to the affected Party the final decision on the proposed activity along with the reasons and considerations on which it was based. The Party of origin then informs the affected Party of its decision, and how and why it was made.

September 2004 United Nations Economic Commission for Europe25 Post-project Analysis (Appendix V, to Article 7) Objectives include: (a) Monitoring compliance with the conditions as set out in the authorization or approval of the activity and the effectiveness of mitigation measures; (b) Review of an impact for proper management and in order to cope with uncertainties; (c) Verification of past predictions in order to transfer experience to future activities of the same type. The Convention also provides for a ‘post- project analysis’, if required by the Parties. The possible objectives of such an analysis are presented here. For additional procedural information, refer to Article 7 of the Convention.

September 2004 United Nations Economic Commission for Europe26 Work Plan for Implementation of the Convention 1. Compliance with and implementation of the Convention 2. Exchange of best practice 3. Subregional cooperation to strengthen contacts between the Parties 4. Capacity-building in Eastern Europe, the Caucasus and Central Asia (EECCA) 5. Examination of substantive relationship between the Convention and Protocol 6. SEA capacity-building needs analysis in EECCA 7. Production of a capacity development manual, and training, to support implementation of the SEA Protocol 8. Institutional and procedural activities This final slide summarizes the on-going activities to support effective implementation of the Convention. (The Work Plan was Decision III/9 of the 3 rd Meeting of the Parties to the Convention.)

September 2004 United Nations Economic Commission for Europe27 Convention on EIA in a Transboundary Context  EIA Convention Secretariat UN Economic Commission for Europe 