Thomas A. Crane 2010Supplier Quality 1 Supplier Quality 1. Choose the Right Supplier Audit the Supplier’s Business Verify the Supplier’s Capability 2.

Slides:



Advertisements
Similar presentations
An Indispensable Quality Assurance Tool for Dairy Processing Plants.
Advertisements

EMS Checklist (ISO model)
Ensure Vendor/Engineer of Choice Product Quality
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
Supplier SQM Participation. 2 | MDT Confidential What is SQM? Stands for Supplier Quality Managment –Formally referred to as SPACE and SPICE Is a system.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Quality Management System
Management 11e John Schermerhorn
Chapter 5: Supply Chain Performance Measurement and Financial Analysis
Thomas A. Crane – 2009 Proactive Quality Management System 1 Proactive Quality Management System “A goal without a plan is just a wish.” Thomas A. Crane.
QMS Tips and Traps (ISO TS16949)
Management of Change Control. Overview Changes – Good or bad? Forced or voluntary? The Importance of Change Control Major Changes to both legacy company.
ISO 9000 Introduction Imran Hussain.
Auditing OEM Customer Specific Requirements under ISO/TS 16949
Release & Deployment ITIL Version 3
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
Guidelines for Carbon Fiber Tape Prepreg Specifictions W.T.McCarvill S.Ward August 6, 2002.
World Health Organization
Quality Control McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Introduction to ISO New and modified requirements.
Introduction to Software Quality Assurance (SQA)
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
B0H4M CHAPTER 16.
Value Analysis/ Flow Analysis
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
Management 11e John Schermerhorn Chapter 18 Control Processes and Systems.
North American Lighting and TQM Kevin Blatnik. My Background 1998: Graduated from EIU with BSIT 1998: Graduated from EIU with BSIT Went to work for Navistar.
S7: Audit Planning. Session Objectives To explain the need for planning To explain the need for planning To outline the essential elements of planning.
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
Audit Planning. Session Objectives To explain the need for planning To outline the essential elements of planning process To finalise the audit approach.
Presented by: Ken Imler Sr. Vice President RAQA Arrow International Working with Suppliers: Forming Strategic Alliances to Accelerate Compliance & Improve.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
Performance Appraisal Appraisal for: non repetitive jobs Key Result Area for: repetitive jobs.
A FSP is a Program designed to identify and control hazards in order to establish and maintain food safety. (Based on HACCP principles) 1 version 2 Dec.2009.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Operations Fall 2015 Bruce Duggan Providence University College.
Costing and accounting system Session 1-2. Types of inventory Direct material ▫Which represent direct material in inventory awaiting manufacture. Work.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Cascade of Specifications and CTQs* to Suppliers *CTQ.
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
ISO-9001:2015 Where we have been and where we are going.
Supplier Performance Development Process
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
PowerPoint Presentation to Accompany Management Third Canadian Edition John R. Schermerhorn, Jr. Barry Wright Prepared by: Jim LoPresti University of Colorado,
CEM515QUALITYASSURANCECEM515QUALITYASSURANCE SUPPLIER PARTNERSHIP.
November 6, 2013 Purchasing Controls & Supplier Quality Best Practices Beyond Compliance for the Medical Device Industry AdvaMed 2013 Bernie Liebler Technology.
Six Sigma Greenbelt Training
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
World Health Organization
Six-Sigma : DMAIC Cycle & Application
(Additional materials)
Supplier Partnership Supplier Partnership is the discipline the strategically planning for, and managing, all interactions with third party organization.
Global Supplier Quality Early Production Containment Training
SUPPLIER PARTNERSHIP 2.
DMAIC Analyze, Improve, Control
  Aptiv Global Supplier Quality Early Production Containment Training.
Lockheed Martin Canada’s SMB Mentoring Program
First Article Inspection
Advanced Product Quality Planning 2nd Edition
Global Supplier Quality Early Production Containment Training
Advanced Product Quality Planning 2nd Edition
Lean-Green belt six sigma program
Presentation transcript:

Thomas A. Crane 2010Supplier Quality 1 Supplier Quality 1. Choose the Right Supplier Audit the Supplier’s Business Verify the Supplier’s Capability 2. Measure Supplier Performance Measure the Supplier’s Quality Performance Measure the Supplier’s Service 3. Develop Supplier Relationship Supplier site visits to communicate concerns Offer suggestions for process capability CTQ control level improvements Encourage development of a continuous improvement program and use of Lean/Six Sigma tools Three aspects of a good Supplier Quality Program

Thomas A. Crane 2010Supplier Quality 2 Supplier Quality 1. Critical Suppliers Critical Suppliers provide parts or materials that are critical to the functionality of your finished product, or are critical to the safety of your employees or the safety of the end user of your product. 2. Major Suppliers 3. Minor Suppliers Not all Suppliers are equal. Some Suppliers are more business critical and require more attention to develop strategic relationships. One way to subdivide Suppliers is to evaluate the parts or materials they provide. Suppliers can be divided into three categories. Major Suppliers provide parts or materials that are important to the efficient production of you product. Parts or materials that have CTQs designated for process control purposes can cause lost productivity, down-time, and higher scrap costs when these parts or materials are out of spec. Minor Suppliers provide parts or materials that do not affect safety, functionality or production of your products. Parts or materials from minor suppliers are normally readily available stock parts or materials, or are available through multiple suppliers.

Thomas A. Crane 2010Supplier Quality 3 Supplier Quality The path to good supplier quality: Critical and Major Suppliers Identify potential suppliers Perform business audit Communicate specifications Sample parts/material approval Pilot run of production quantity Approve supplier Measure Supplier performance Develop Supplier Relationship Minor Suppliers Identify potential suppliers Communicate specifications Sample parts/material approval Run line trial with sample parts/material Approve supplier Measure Supplier performance

Thomas A. Crane 2010Supplier Quality 4 Supplier Quality Identify potential suppliers Choosing potential suppliers is motivated by a myriad of reasons, cost, service, location, leveraging of corporate buys, etc. Regardless of the motivation for adding a new supplier, it is essential to communicate as much as possible during the initial process of requesting quotations. The more information about the parts or material specification, SPC data and certification requirements, expected stocking levels, and packaging and delivery requirements that you can share with the potential supplier the more accurate their quote will be.

Thomas A. Crane 2010Supplier Quality 5 Supplier Quality Perform business audit For critical or major suppliers a business audit should be done before doing business and then on a periodic basis determined by the supplier’s performance. The business audit should include all aspects of the business including: Organization and Management Operational Goals (metric that support the goals) Financial Stability Growth Plan PricingSupplier/Customer Interface (Customer Focus) Management ResponsibilityDocumentation Procedures Change Control Quality PlanningTraceability, Inspection and Testing Process Control and SPCProcess Control Levels (L1, L2, L3 or L4) Metrology Corrective Action and Problem Solving Cost of Quality Technical Capability Handling Storage, Packaging, DeliveryTraining Continuous Process ImprovementMaterials Management Scheduling/Quick ResponseProductivity Facility/Equipment/Layout/CapacityPackaging Equipment and Tooling MaintenanceEquipment/Tooling Design and Qualification Sub-tier Supplier ResponsibilityReliability, Qualification and Audit Testing Employment PracticesEnvironmental and Worker Health & Safety A score card for the audit can be developed to aid in evaluation and development of improvement plans. Each of the categories are scored based on objective evidence shown during the audit. A minimum score can be established to help avoid potentially weak suppliers.

Thomas A. Crane 2010Supplier Quality 6 Supplier Quality Communicate Specifications CTQ Flow-down review and Drawing Updates: The clear communication of specifications and expectations are essential to the success of any supplier quality program. This process begins with your own internal review of CTQ flow-down (see appendix A), drawings, specifications, regulator requirements, and packaging and delivery requirements. These should all be reviewed internally to ensure they clearly convey all the requirements for parts or materials being ordered from the supplier. Review specifications with Supplier: After any updates or modifications have been completed, all the drawings, specifications, regulator requirements, and packaging and delivery requirements should be reviewed, in detail, with the supplier to ensure they are clearly understood. Requirements for SPC data for CTQs and material certifications should be included in the specifications. Review Service Requirements: Service requirements should be included in the specifications in order to make the expectations clear. Expected lead times, stocking levels, any special packaging or shipping requirements, and any lot traceability requirements need to be clearly stated. Verify that the service requirements are understood by the supplier. Review the Supplier Score Card Metrics: Explain the aspects of the Supplier Scorecard Metrics and verify that the supplier understands how their performance will be evaluated (see Measure Supplier Performance section below). Most suppliers will respond to performance metrics if they understand their importance. COMMUNICATE, COMMUNICATE, COMMUNICATE

Thomas A. Crane 2010Supplier Quality 7 Supplier Quality Sample parts/material approval Supplier should supply a minimum of 30 parts with capability data on any CTQs identified or material analysis with a sample of the material analyzed. Supplier should provide Gauge R&R data for measurements systems used to measure the parts or analyze the raw material. If a third party lab is used, then the lab name and address along with the Gauge R&R data from the lab should be provided. Audit the data submitted by measuring the parts or having the material analyzed. This is done to validate the supplier’s capability to measure parts. Perform a line trial with the sample parts or material to verify that they perform properly in your product and that they do not introduce any issues in your production processes. Communicate results to the Supplier. Pilot run of production quantity Order a production quality of parts from the supplier for a pilot run. Supplier should supply capability data for the production run (and/or material certifications) with the parts or material identified with a lot number. Track the use of the parts or material through your production and note any change in production efficiencies, down-time or increases in scrap. Communicate results to the Supplier

Thomas A. Crane 2010Supplier Quality 8 Supplier Quality Approve the Supplier Once the sample parts are approved and pilot run is successful the supplier should be added to the approved supplier list for the parts or material tested and approved All new suppliers should be monitored closely to make sure they can provide quality parts with quality service over an extended period of time. This may require more frequent calculation of their supplier score using the metrics described in the Measure Supplier Performance section below. Measure Supplier performance Measuring the supplier’s performance is a combination of both the quality level of the supplied product as well as the service level provided by the supplier. Quality: Part/Material level PPM Supplier Level PPM Supplier compliance to SPC data or material certification submittal requirements Responsiveness to Corrective Actions Requests and effectiveness to corrective actions taken Service: On-time delivery / Promises kept Order accuracy (item numbers and quantities correct) Compliance to packaging and/or shipping requirements A score card should be generated on a periodic basis and communicated to the suppliers. Corrective actions should be requested if one of the metrics fall below desired level.

Thomas A. Crane 2010Supplier Quality 9 Supplier Quality Develop Supplier Relationship You should develop a strategic relationship with critical suppliers and many of the major suppliers. If possible you should periodically visit the supplier and personally discuss their performance metrics (both good and bad). Encourage suppliers to apply Lean/Six Sigma tools to reduce waste and improve process stability and capability. Help them to understand the power of these tools and how to use them to improve the control levels on CTQs to at least an L2 level (see appendix A for details on control levels). Work with the suppliers to develop continuous improvements projects directed at PPM reduction, improvements to OTD and order accuracy, productivity projects that lead to improved productivity and reduced cost, and project to improve their cost of quality. Projects should be well defined, with stated results that are measurable, and have a well defined timeline and owners identified. Developing a personal relationship with suppliers provides quicker resolution to quality or service issues, as well as improved overall quality and service.

Thomas A. Crane 2010Supplier Quality 10 Supplier Quality - Appendix A CTQ Flowdown Quality Functional Deployment (QFD) Identify customer’s CTQ’s (VOC) Translate customer CTQ’s to product-performance CTQ’s Identify Low level Red X’s that impact Parts/Process CTQs Prioritize the Red X’s Assign current control levels L1, L2, L3, or L4 L1 and L2 control levels are desired for each CTQ CTQ Flow-down -- Identify What to Measure Marketing – Technology – Quality - Manufacturing CTQ flowdown is a form of Quality Functional Deployment (QFD). It is a process for making sure that the Voice of the Customer is reflected in the design and manufacturing of products. CTQ flowdown begins with the voice of the customer and the design process. Understanding the customer needs and expectations along with any regulatory requirements (captured and documented) is the first step. Translating those needs and expectations into product design and easy to understand specifications is the next step. (This is an essential step, both internally for your production and externally for Suppliers) Producing products that meet the design specifications and therefore meet the customer needs and expectations and all regulatory requirements is the final result. A robust Product Design Rationalization process is crucial. Technology design reviews with Quality and Manufacturing are essential for successful CTQ flowdown. CTQ control levels L1 – Mistake Proof (product, part, and/or process designed to ensure the CTQ is met without operator intervention) L2 – Early Warning (SPC is used to monitor part dimensions and/or process parameters to maintain control of CTQ within specification limits. Data can be reviewed for continuous improvement opportunities.) L3 – Operator Dependent (When L1 or L2 control level is too costly or improvement project is a lower priority, then L3 is acceptable if proper safeguards are in place. Clear control plans for process setup and operation, first piece and in-process inspections with data recorded, and frequent quality audits of procedures and records are needed for L3 control level to be effective. L4 – no quality plan (For a true CTQ, this level is never acceptable.)