Paula J. Trigg, County Engineer Public Works and Transportation Committee April 30, 2014 PRESERVATION PROJECTS 2014-2019 PROPOSED HIGHWAY IMPROVEMENT PROGRAM.

Slides:



Advertisements
Similar presentations
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Advertisements

Highway Maintenance and Preservation Needs
Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.

January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Paula J. Trigg, County Engineer Public Works and Transportation Committee February 26, CONSTRUCTION PROGRAM PREVIEW.
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Steve Varnedoe Condition Assessment & Funding Needs for North Carolina’s Highway System North Carolina Department of Transportation Report to the Joint.
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
City of Lake Elmo · New Village Workshop-Focus on Infrastructure· January 20, 2007 PAVEMENT MANAGEMENT REPORT PREPARED: NOVEMBER 16,
MODULE 2 By Vit Troyan. TRANSPORTATION: Right-of-Way Traffic Operations Street Maintenance One-Call Centers.
Town of Westerly Pavement Improvement Plan  Determine current pavement condition.  Identify and prioritize needed repairs.  Coordinate with RIDOT.
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS PROPOSED HIGHWAY.
Mississippi DOT Roadsides, Drainage & Vegetation Management Standards.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 4, 2014 FUNDING AND REVENUE PROPOSED HIGHWAY IMPROVEMENT PROGRAM.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 29,
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 3, 2013.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
UGPTI COUNTY ASSET INVENTORY TOOLKIT KICKOFF WEBINAR Dale Heglund, Brad Wentz, Tim Horner Upper Great Plains Transportation Institute 9/12/15.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Trail Funding Sources & General Information
Asset Management Cindy VanDyke Office of Planning Georgia Department of Transportation.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 1, 2013.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
Paving for Progress Aaron D. Granquist, Project Manager, HR Green, Inc. Doug Wilson, Capital Improvement Project Manager, Cedar Rapids Handouts and presentations.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 13 (Some of these pictures show bicyclists not wearing.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Public Works Department FY Budget Challenges February 16, 2010.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW DIANA RADCLIFFE, TEBM, ROADWAY PRESERVATION, DIV OF MAINTENANCE.
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
KING COUNTY BRIDGES AND ROADS TASK FORCE Roads Services Division Financial Review September 16, 2015.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Review and Comment on Draft 2009 Ten-Year State Highway Operation and Protection Plan Presented to California Transportation Commission February
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
Huston, Texas | June Jing Zhang, AICP, PTP, LCI, LEED AP ND AccommodatingCyclists in Accommodating Cyclists in Highway Maintenance Projects -- an.
Public Works Infrastructure Update Public Works Department April 5, 2016.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
The Gainesville Area Chamber Infrastructure Investment Initiative
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Transportation Services Department
Capital Improvement Program
Construction Management & Inspection
Highway 169 Bridge Replacement & Pavement Resurfacing
Pavement Performance Measures In Georgia
Pavement Improvement Plan 2009
Walker Street Reconstruction Project 25% Design Public Hearing
Monterey County Project Report for Measure X Expenditures
Presentation transcript:

Paula J. Trigg, County Engineer Public Works and Transportation Committee April 30, 2014 PRESERVATION PROJECTS PROPOSED HIGHWAY IMPROVEMENT PROGRAM 1

PRESENTATION SCHEDULE: YEAR HIGHWAY IMPROVEMENT PROGRAM PWTC 2014 Meeting DatePresentation Topic February 26 Preview 2014 Construction April 2 Overview/Source of Projects April 30 Preservation Projects May 7 Modernization and Expansion Projects May 28 Funding and Revenue June 4 Project Listings June 25 Draft Program Document 2

FIVE YEAR HIGHWAY IMPROVEMENT PROGRAM 3 LCDOT’s management philosophy sets system priorities: 1.Preservation 2.Modernization 3.Expansion

PRIORITY ONE: PRESERVATION 4 Developing a set of projects ARGUS Pavement Management Software Keeping tabs on the system Asset Inventories $1.6 billion to build

DEVELOPING THE PROJECT SET 5 ARGUS Pavement Management System Today is an overview of ARGUS

PAVEMENT MANAGEMENT GOAL: 6 Make cost effective decisions For given 5 year budget levels: Where repairs are needed What repair strategies to use When the repairs should be done

PAVEMENT MANAGEMENT SYSTEM COMPONENTS: 7 County highway database Automated pavement testing Repair strategies with costs Pavement aging prediction Optimization program

COUNTY HIGHWAY DATABASE 8 Contains information on: Surface type Surface width Section area Traffic volumes Percentage of trucks

AUTOMATED PAVEMENT TESTING 9 About 870 lane miles in system County is divided into quadrants One quadrant is tested each year Entire county is covered in four years

AUTOMATED PAVEMENT TESTING 10 First: Laser Road Surface Tester (RST) measures… Cracking Rutting Ride quality

AUTOMATED PAVEMENT TESTING 11 Second: Dynaflect deflection tester measures strength and condition of… Pavement Subgrade

REPAIR STRATEGIES AND COSTS 12 Two Groups of Roadway Priorities: (starting with program analysis) Four lane roads: 53 miles Two lane roads: 247 miles

REPAIR STRATEGIES AND COSTS 13 Microsurfacing Five resurfacing strategies Three “3R” strategies Three reconstruction strategies Associated per-square-yard costs

PAVEMENT AGING PREDICTION COSTS 14

ARGUS SUMMARY 15 does… Pavement Management System does… Assess the present condition of the system Estimate future road conditions Identify and rank road projects Maximize the condition of the system within the given budget

ARGUS SUMMARY 16 does not… Pavement Management System does not… Replace professional judgment Provide certain detailed project-specific information

LCDOT ARGUS RESULTS 17 Started in 1986 System condition has improved from a rating of 68 to 84 (on 100 scale) Area of backlog and failing pavement has been reduced from 55% to 9%

2014 – 2019 PROPOSED HIGHWAY IMPROVEMENT PROGRAM 18 The following charts to appear in Section 2 Preservation Projects

TRAFFIC VOLUMES 19

DEFINITIONS OF PAVEMENT CONDITION 20 Good (80 – 100) Sections may require crack sealing or a thin overlay. These sections do not require immediate attention. Pavement in this category is generally less than 12 years old. Satisfactory (70-79) Sections may require resurfacing or other rehabilitation in the near future. Pavement is generally years old. Failing (60-69) Will require some type of improvement in the near future to preserve the usability of the surface and avoid the need for reconstruction. This is pavement that is approaching the end of its useable life. Backlog (10-59) May require surface and base course reconstruction to restore roadway serviceability. Some may require total reconstruction, including reconstruction of the subgrade. Pavement in this category is generally more than 15 years old.

CURRENT PAVEMENT CONDITION = 84 21

PAVEMENT CONDITIONS 22

ARGUS OPTIMIZES IMPROVEMENTS 23

MULTIPLE TREATMENTS EVALUATED 24

SYSTEM RECOMMENDATIONS

SYSTEM PRESERVATION PROJECTS

2015 PROJECTS 27 Street NameFromToProject Type 21st StreetIL Route 131Kenosha RoadResurfacing Buffalo Grove RoadIL Route 83Lake Cook RoadResurfacing Center StreetIL Route 83US Route 45Resurfacing Cedar Lake RoadIL Route 134IL Route 120Reconstruction Lewis AvenueYork House RoadSunset AvenueResurfacing Lewis AvenueDugdale RoadArgonne DriveResurfacing Miller RoadKelsey RoadIL Route 59Resurfacing Miller RoadIL Route 59US Route 12Resurfacing Petite Lake RoadIL Route 59Fairfield RoadReconstruction Quentin RoadLong Grove RoadLake Cook RoadResurfacing Rollins RoadWashington AvenueWilson RoadResurfacing Rollins RoadWilson RoadFairfield RoadResurfacing 2015 Micro-surfacingVarious Surface Treatment

2016 PROJECTS 28 Street NameFromToProject Type 9th StreetKenosha RoadLewis AvenueResurfacing 9th StreetLewis AvenueIL Route 137Resurfacing Aptakisic RoadBuffalo Grove RoadPrairie RoadResurfacing Aptakisic RoadPrairie RoadWeiland RoadResurfacing Aptakisic RoadWeiland RoadIL Route 21Resurfacing Deep Lake RoadWisc State LineNorth AvenueResurfacing Deep Lake RoadGrass Lake RoadGelden RoadResurfacing Deep Lake RoadGelden RoadIL Route 132Resurfacing Fremont Center RoadIL Route 60Gilmer RoadFull Depth Reclamation Grass Lake RoadIL Route 83Deep Lake RoadResurfacing Greenleaf AvenueWashington StreetIL Route 120Resurfacing Hunt Club RoadIL Route 173Wadsworth RoadResurfacing Kilbourne RoadRussell RoadIL Route 173Resurfacing 2016 Micro-surfacingVarious Surface Treatment

2017 PROJECTS 29 Street NameFromToProject Type 22nd StreetIL Route 43US Route 41Resurfacing Duffy LaneRiverwoods RoadI-94 Tollway BridgeResurfacing Ela RoadIL Route 22IL Route 12Resurfacing Ela RoadIL Route 12Cuba RoadResurfacing Everett RoadSt. Mary's RoadRiverwoods RoadResurfacing Fairfield RoadRollins RoadIL Route 134Resurfacing Grass Lake RoadDeep Lake RoadUS Route 45Resurfacing Hainesville RoadWashington StreetIL Route 120Resurfacing Hunt Club RoadIL Route 132Dada DriveResurfacing Hunt Club RoadDada DriveWashington StreetResurfacing Hunt Club RoadWashington StreetGages Lake RoadResurfacing Hunt Club RoadGages Lake RoadIL Route 120Resurfacing 2017 Micro-surfacingVarious Surface Treatment

2018 PROJECTS 30 Street NameFromToProject Type Deep Lake RoadNorth AvenueIL Route 173Resurfacing Fairfield RoadIL Route 132Monaville RoadResurfacing Gelden RoadDeep Lake RoadGrass Lake RoadResurfacing North AvenueDeep Lake RoadUS Route 45Resurfacing Rollins RoadGrand AvenueWashington AvenueResurfacing Russell RoadKilbourne RoadIL Route 131Resurfacing St. Mary's RoadIL Route 176IL Route 60Resurfacing 2018 Micro-surfacingVarious Surface Treatment

2019 PROJECTS 31 Street NameFromToProject Type Almond RoadGages Lake RoadFairfield LaneResurfacing Deerfield RoadRiverwoods RoadWilmot RoadResurfacing East County Farm RdWinchester RoadBull Creek DriveResurfacing Engle DriveIL Route 83Nathan Hale DriveResurfacing Fairfield RoadIL Route 134IL Route 120Resurfacing Fairfield RoadIL Route 120IL Route 60Resurfacing Genoa AvenueNathan Hale DriveGranada BoulevardResurfacing Granada BoulevardGenoa AvenueIL Route 132Resurfacing Hunt Club RoadMilburn RoadStearns School RoadResurfacing Nathan Hale DriveEngle DriveGenoa AvenueResurfacing St. Mary's RoadIL Route 60Everett RoadResurfacing Wilson RoadRollins RoadIL Route 134Resurfacing Yorkhouse RoadIL Route 131Lewis AvenueResurfacing 2019 Micro-surfacingVarious Surface Treatment

KEEPING TABS ON THE SYSTEM: ASSET INVENTORIES 32 Pavement and bike facilities Guardrail, bridges and railroad crossings Signals and signs Drainage and stormwater facilities More…

PROGRAM RESURFACES ABOUT 15 MILES PER YEAR 33

MANY ROADS INITIALLY BUILT IN THE 1950S 34

INVENTORY: LANE MILES 35

INVENTORY: CULVERTS/CONDITIONS 36

AGE OF HIGHWAY BRIDGES 37

AGE OF BRIDGE DECK SURFACE 38

AGE OF BIKE AND PEDESTRIAN BRIDGES 39

BRIDGES: SUFFICIENCY RATINGS 40

STORMWATER MANAGEMENT FACILITIES 41

BY THE NUMBERS INVENTORY: NON-PAVEMENT ASSETS 42 15,664 Storm sewer structures 721 Culverts 206 Miles of storm sewer pipe 43,552 Feet of fencing 16,942 Feet of retaining wall 55 Miles of 4’ paved shoulder 22 Miles of guardrail 26 Landscape areas (48 acres) April 2014

INVENTORY: SIGNS 43 *signs installed and maintained by LCDOT | April 2014

INVENTORY: RAILROAD CROSSINGS 44

INVENTORY: SIGNAL CONTROLLERS 45

PRIORITY ONE: PRESERVATION 46 Developing a set of projects ARGUS Pavement Management Software Keeping tabs on the system Asset Inventories

PRESENTATION SCHEDULE: YEAR HIGHWAY IMPROVEMENT PROGRAM PWTC 2014 Meeting DatePresentation Topic February 26 Preview 2014 Construction April 2 Overview/Source of Projects April 30 Preservation Projects May 7 Modernization and Expansion Projects May 28 Funding and Revenue June 4 Project Listings June 25 Draft Program Document 47