North Mankato Load Serving study Xcel Energy Great River Energy.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

Intrastate Travel in the Upper Great Plains: A role for SATS? University of Nebraska at Omaha Aviation Institute July 2003.
Midwest Textbook Questions
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
T ransmission I mprovement For the Red River Valley & West Central Minnesota.
Goshen Area Bus Reconfiguration
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
The Mathematics of the Great U.S. Blackout August 14, 2003 Ralph Fehr, P.E. Engineering Consultant.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Local Area Planning Update to TRANSAC – December 16, 2014.
RIGO Update Xcel Energy Jason Standing Jeffrey Norman October 3, 2007.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Buffalo Ridge Incremental Generation Outlet (BRIGO) Transmission Study Presentation to National Wind Coordinating Committee June 22, 2005 W Grivna, PE.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Xcel Energy Projects From 2008 Reliability Assessment.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Entergy Transmission Planning Summit New Orleans, LA July 31, 2007
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
1 1 1 Central Maine Power Company Local System Plan Presentation Planning Advisory Committee Meeting October 21, 2010.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
Subtransmission Reliability Criteria
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
Greater Mankato Transit Redesign Study Study Overview and Initial Existing Conditions September 2011 In association with: LSA Design and Public Solutions.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
Electric Transmission Planning Local Area Planning Update Presentation to TRANSAC January 24, 2013.
1 Spare Transformer Equipment Program (STEP). 2 STEP Objectives Industry initiative to increase the number of available spare transformers for use following.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
June 3, 2010 Technical Advisory Group RMR Exit for Spencer 5 – Remedial Action Plans Jay Teixeira.
May 8, 2008 Technical Advisory Committee CenterPoint Energy Rothwood Substation Project Jay Teixeira Manager, Regional Planning.
About Minnesota By: Amelia
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Largest of the five Great Lakes of North America, this body of water borders Ontario to the north. States including Minnesota, Wisconsin, and Michigan.
Title Evaluating the potential for Bus Rapid Transit and MnPASS Express Lanes in the southwest metro Investigating options for improved bus service between.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
The Transportation Revolution Steam Power: 1807: Robert Fulton invents the steamship Impact: Water travel and shipping becomes easier, faster.
Local Area Planning Update to TRANSAC – December 21, 2016
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
Review of Distribution Network Protection
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
TONBRIDGE POWER GREEN LINE
Acadiana Load Pocket Project
Crescent City Study Kickoff
Presentation transcript:

North Mankato Load Serving study Xcel Energy Great River Energy

Study Area:

System Characteristics Major loads include Cities of Lesure and St. Peter Only two strong sources from Wilmarth. Long 69 kV lines.

Critical contingencies (2012): Contingency Wilmarth – Penelope Wilmarth – Eagle Lake Traverse – St. Peter Branch Overload Cleveland – Jamestown tap Wilmarth –Traverse Jamestown – Cleveland Overload 145 % 109 % 130 % Bus Eagle Lake - Cleveland – St. Thomas Cleveland – St. Thomas St. Peter – Cleveland – St. Thomas Voltage 91.5 % 88 % 86.5 %

Critical contingencies continued: Contingency Le Sueur – Le Sueur Tap Loss of Cleveland – Le Center Branch Overload Cleveland – Le Center Traverse – New Sweden Overload 102 % 104 % Bus Le Sueur – Montgomery Le Center – St. Thomas Voltage 88.6 % 90.8 %

Preferred Plan: Preferred Plan is option 2. Relatively inexpensive. Scope for future 115 kV line additions from Helena substation.

Other Concerns: SPS to trip the Helena – St. Thomas line for the loss of Helena – Wilmarth or Helena – Blue Lake 345 kV lines. The inservice date for this project depends on the inservice date of Helena 345 kV substation. The project schedules has to be coordinated with the Southwest Minnesota – Twin cities 345 kV line.

Questions?