Introductions: Tom Boyd – Tonn and Blank Construction, LEED Green Associate Tom Boyd – Tonn and Blank Construction, LEED Green Associate Sr. Martha Ann.

Slides:



Advertisements
Similar presentations
AIA Honolulu, LEED-CI Gold Intergen, LEED-CI Certified
Advertisements

Healthy Building, Healthy Community Crystal Lake, Illinois.
LEED NC Credit Summary NUMBERS & NAMES Slide Editor: James A. Strapko LEED Source:
Patrik Lazzari, CIE, LEED AP
Specifying GREEN A presentation by Building Systems Design, Inc.
Sustainability in Construction: A LEED Primer
LEED-CI LEED for Commercial Interiors
Sustainability and Leadership in Energy and Environmental Design (LEED) Lessons Learned from The Fernald Preserve Visitors Center.
Green Building Leadership in Energy and Environmental Design (LEED)
Presented by: Jane Briggs and Karen Mitchell October 11, 2007 The New LEED Building at Shady Grove.
TRANSPORTATION DEMAND MANAGEMENT INSTITUTE (TDMI) – GLOBAL PERSPECTIVE ON MOBILITY MANAGEMENT PRESENT AND FUTURE European Conference on Mobility Management.
New River Gorge National River Climate Friendly Parks 2009 Action Planning Workshop November 4-5, 2009.
46 Blackstone Street LEED-NC v2.1 Platinum 46 Blackstone, LEED Platinum.
April 5-May 17, 2011 Each Tuesday, 6:30-8 pm Pulaski Tech BIC 3303 E Roosevelt Road Registrar: Linda K. Smith Executive Director, USGBC Arkansas Chapter.
Introducing Connecticut LEED Program for Green Buildings
Making the Case for Building “Green” Health Care Facilities O’Brien & Company Sponsored by the Business & Industry Resource Venture.
Energizing Brownfield Projects Terri Smith Environmental Liability Management, Inc.
LEED L EADERSHIP IN ENERGY AND ENVIRONMENT D ESIGN.
A SUSTAINABLE RESIDENTIAL DESIGN PROJECT Project 1 DS 413: Design Studio 413 May 9, 2012.
Tour Stop 1: Outside The Building. Community Connectivity Encourages A Walkable Neighborhood At least 10 community services, and high density residential.
LEED ND Rating System of Green Business Council – Leadership in Energy & Environmental Design One of many GBC systems – Building Design & Construction.
BECOMING GREEN Santa Margarita High School Academic Building.
Sustainable Core and Shell. Sponsored by: AIA The Corporate Realty, Design & Management Institute.
Basic Building blocks for Developing a Sustainability Program Florida Healthcare Engineering Association September 22, 2010.
Session One: Introduction to Green Buildings and LEED Introduction to the LEED Rating System.
April 5-May 17, 2011 Each Tuesday, 6:30-8 pm Pulaski Tech BIC 3303 E Roosevelt Road Registrar: Linda K. Smith Executive Director, USGBC Arkansas Chapter.
Kendal at Longwood Cottages Expansion Project Sustainable Development & LEED Certification.
Ripley Rasmus AIA LEED AP
A Sustainable Residential Design Project Project 16 DS 413: Design Studio 413 May 9, 2012.
Understanding Fundamental Concepts and Trends of Drafting
Certified Green Buildings: Why and How
1 Ohio School Facilities Commission Green Schools Initiative Presentation #2.
PRISHA PROPERTIES INDIA PVT LTD.
Green Building Design and LEED Certification ACMA 2008 Summer Conference 2008.
An Introduction to L E E D Leadership in Energy and Environmental Design 1UNT in partnership with TEA. Copyright © All rights reserved.
Learning by Design Using LEED to enhance teaching and learning.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
LEED: LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN Gibbs INTD 153 Design Studio I.
The Cost Implications of LEED A Presentation By Hanscomb Faithful & Gould September 29 th – 2005 Ms. Carin Rautenbach – Vice President, LEED AP Ms. Minna.
LEED New Construction & Major Renovations Rating System
NEW YORK BANKERS ASSOCIATION Pennsylvania Credit Union Association Kevin W. Poirot Vice President May 23, 2008 Building Green: What You Should Know.
The Role of Compact Storage in Green Building Design Program No.: CSGBD Provider Name: Spacesaver Corporation Provider No.: J197.
MARC 2009 Green Communities – Concurrent Session A brief presentation by Larry Crittenden Executive Director US Green Building Council - Detroit Regional.
LEED-NC Market Transformation As of All statistics exclude pilot projects 350 M gsf 50 States 13 Countries 323 Certified Projects 2805 Registered.
African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP.
ENVELOPE. LIGHTING.
Big Ten Sustainability Conference November 15-16, 2010 Energy Design & LEED Standards.
The Greening of the Rooftop Module 4 Green Building Rating Systems What Are They? How Do They Work?
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
Project 15 DS413: Design Studio 413 May 9, 2012.
Planning for LEED ® © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Leadership in Energy and Environmental Design LEED ® and its related.
MVP Sustainability Green LEED LEED TM and its effect on tile subcontractors.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
San Francisco’s Green Building Ordinance: The New LEED Gold Standard a BOMA Lunch Workshop October 8, 2008 Presented by: Steven Ring
Jeremy Curry, Jeffrey Williams, Gary McCleod, Matt Gorecki, Drew Lattuca.
MAPA Wednesday Webinar Everything you always wanted to know about LEED* *but were afraid to ask.
Fundamentals of LEED v4 for
Objectives of a Green Building
GLOBAL CONCERNS CLIMATE CHANGE GLOBAL WARMING.
It’s Green, But What Does it Mean ?
UNC – Coastal Studies Institute
INTD409 Interior Environmental Technology Fall 2016/17
2- INTD409 Interion Environmental Technology
2- INTD409 Interion Environmental Technology Fall 2014/15
LEED 2.2 for New Construction LEED 2.0 for Existing Buildings
INTD409 Interior Environmental Technology Spring2016/17
Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1.
Ali Amiri Doctoral student Aalto University
Need to Know these terms:
Leadership in Energy and Environmental Design (LEED)
Presentation transcript:

Introductions: Tom Boyd – Tonn and Blank Construction, LEED Green Associate Tom Boyd – Tonn and Blank Construction, LEED Green Associate Sr. Martha Ann – St. Francis Hospitals Sr. Martha Ann – St. Francis Hospitals

2009 LEED Programs LEED for New Construction LEED for New Construction LEED for Existing Buildings LEED for Existing Buildings LEED for Commercial Interiors LEED for Commercial Interiors LEED for Core & Shell LEED for Core & Shell LEED for Homes LEED for Homes LEED for Schools LEED for Schools LEED for Neighborhood Developments LEED for Neighborhood Developments

Pilot Programs in Development LEED for Laboratories LEED for Laboratories LEED for Multiple Buildings LEED for Multiple Buildings LEED for Healthcare LEED for Healthcare LEED for Retail LEED for Retail

Sustainable Sites PRc1 – Construction Activity Pollution Prevention SSc1 – Site Selection SSc2 – Development Density and Community Connectivity SSc3 – Brownfield redevelopment SSc4.1 – Alternative Transportation – Public Transportation Access SSc4.2 – Alternative Transportation – Bicycle Storage and Changing Rooms SSc4.3 – Alternative Transportation – Low Emitting and Fuel Efficient vehicles SSc4.4 – Alternative Transportation – Parking Capacity SSc5.1 – Protect or Restore habitat SSc5.2 – Maximize open space SSc6.1 – Storm Water Design Quantity Control SSc6.2 – Storm Water Deign – Quality Control SSc7.1 – Heat Island Effect – Non-roof SSc7.2 – Heat Island Effect - roof SSc8 – Light Pollution Reduction

Water Efficiency PRc1 – Water Use Reduction WEc1 – Water Efficient Landscaping WEc2 – Innovative Wastewater Technologies WEc3 – Water Use Reduction

Energy and Atmosphere PRc1 – Fundamental commissioning of building energy systems PRc2 – Minimum Energy Performance PRc3 – Fundamental refrigerant Management EAc1 – Optimize Energy Performance EAc2 – On-site renewable energy EAc3 – Enhanced commissioning EAc4 – Enhanced Refrigeration Management EAc5 – Measurement and Verification EAc6 – Green Power

Materials and Resources PRc1 – Storage and Collection of Recyclables MRc1 – Building Reuse - Maintain Existing Walls, Floors, and Roof MRc2 – Construction Waste Management MRc3 – Materials Reuse MRc4 – Recycled Content MRc5 – Regional Materials MRc6 – Rapidly Renewable Materials MRc7 – Certified Wood

Indoor Environmental Quality PRc1 – Minimum Indoor Air Quality Performance PRc2 – Environmental Tobacco Smoke (ETS) Control EAc1 – Outdoor Air Delivery Monitoring EAc2 – Increased Ventilation EAc3 – Construction Indoor Air Quality Management Plan During Construction EAc4.1 – Low Emitting Materials – Adhesives and Sealants EAc4.2 – Low Emitting Materials – Flooring Systems EAc4.3 – Low Emitting Materials – Composite Wood and Agrifiber Products EAc4.4 – Low Emitting Materials – Furniture and Furnishings EAc5 – Indoor Chemical and Pollutant Source Control EAc6.1 – Controllability of Systems – Lighting EAc6.2 – Controllability of Systems – Thermal Comfort EAc7.1 – Thermal Comfort Design EAc7.2 – Thermal Comfort Verification EAc8.1 – Daylight and Views - Daylight EAc8.2 – Daylight and Views - Views

Other Points available during LEED Certification Innovative in Design (ID) Innovative in Design (ID) Regional Priority (RP) Regional Priority (RP)

LEED 2009 for New Construction, Core & Shell, and Schools 100 base points; 6 possible innovation and design and 4 regional Priority points 100 base points; 6 possible innovation and design and 4 regional Priority points CERTIFIED POINTS CERTIFIED POINTS SILVER POINTS SILVER POINTS GOLD POINTS GOLD POINTS PLATINUM 80 POINTS + PLATINUM 80 POINTS +

How Do I Certify a Project?

The LEED certification process 1. Conduct a LEED project Charrette Goal is to develop a viable LEED credit strategy Goal is to develop a viable LEED credit strategy Choose a filing strategy Choose a filing strategy Assign team member responsibilities Assign team member responsibilities Use LEED checklist as a guideline Use LEED checklist as a guideline 2. Project Registration Register project on-line & pay fee Register project on-line & pay fee Members = $900 / Non-members = $1200 Members = $900 / Non-members = $1200 Complete project summary & LEED online checklist Complete project summary & LEED online checklist Project team gets access to online submittal Project team gets access to online submittal Templates & CIRs Templates & CIRs 3. Manage Documentation Through LEED online Project Administrator implements filing strategy Project Administrator implements filing strategy Sign up for LEED online Sign up for LEED online Refine Filing strategy Refine Filing strategy Download online submittal templates Download online submittal templates

The LEED certification process 4. Complete Documentation Work with team members to fulfill requirements Work with team members to fulfill requirements Upload documentation as design / construction progresses Upload documentation as design / construction progresses Refine Strategies Refine Strategies 5. File Documentation with GBCI File design prerequisites / credits at end of CD phase File design prerequisites / credits at end of CD phase File construction prerequisites / credits at end of construction phase File construction prerequisites / credits at end of construction phase Submit templates on-line for GBCI to review Submit templates on-line for GBCI to review 6. Certification Award Plaque awarded after successful review Plaque awarded after successful review