Dock Suitability LCDR Xochitl Castañeda Chief, Waterways Management Division Sector Houston-Galveston Prepared for Dredging Your Docks 2012 November 7,

Slides:



Advertisements
Similar presentations
Assigned to WFO Houston/Galveston MIC - Jeff Evans SRH - Melinda Bailey Co-Located with Galveston County Emergency Management Office 2K Budget for Travel.
Advertisements

Slide1 Managing Flood Risk U.S. Army Corps of Engineers Steven L. Stockton, P.E. Director of Civil Works U.S. Army Corps of Engineers 14 July 2009 Presentation.
April 22, 2014 Dennis Lombardi, Deputy Director, Port Commerce Department Port of NY & NJ Sandy 2012 Small Sea Changes: Big Coastal Impacts.
Michael R. Christensen, P.E. Deputy Executive Director – Development Port of Los Angeles Port of Los Angeles Emergency Preparedness and Tsunami Readiness.
Hurricane Katrina Update: PD&R Assistance Dana Bres, P.E. Research Engineer Affordable Housing Research and Technology Division Office of Research, Evaluation.
Tampa Bay Harbor Safety & Security Committee
Sector New Orleans NEW FINAL HURRICANE RNA RULE Regulated Navigation Area.
FEMA Overview. FEMA overview Federal disaster contracting Emergency Preparedness 2.
Cook Inlet Harbor Safety Committee Informational Meeting Enhancing the Marine Transportation System (MTS) in Cook Inlet.
Hurricane Katrina Lessons Learned Laurence I. Broun Departmental Emergency Coordinator Office of Law Enforcement, Security and Emergency Management May.
Returning to Our National Waterways Dabney Hegg U.S. Senate Committee on Commerce, Science and Transportation.
U. S. Coast Guard Role and Process for LNG Mr. Alan Moore LT Dan McLean
1 Ports and Harbors – Transitions and Challenges Ms. Doris J. Bautch Commissioner, U.S. Section of PIANC U.S. Maritime Administration Presented at the.
Port Heavy Weather Plan for Northeast and Eastern Central Florida.
U.S. COAST GUARD Presented by LCDR Marcella Granquist
WRC HURRICANE DAMAGE POTENTIAL SCALE GULF OF MEXICO HURRICANES PAST – PRESENT – FUTURE MMS ITM January 6, 2009 Jill F. Hasling, President Certified Consulting.
Coast Guard MSU Port Arthur  Vessel Groundings CFRs - Reporting Requirements Commercial Impacts  Captain of the Port Initiatives Encourage Hydrographic.
A Coastal Barrier Protecting the Houston/Galveston Region from Hurricane Storm Surge Center for Texas Beaches and Shores Texas A& M University at Galveston.
Hurricane Recovery Update MTAC November 2, HURRICANE RECOVERY TIME LINE OF EVENTS Hurricane Katrina Makes Landfall in Florida 6:30 P.M. Thursday,
Hurricane Isaac X X X ◘ Isaac began as a tropical wave on August 16 th off the coast of Africa & was classified as a tropical storm on August 21 st ◘
Galveston Hurricane. A Hurricane Learning Objectives Understand why the Galveston Hurricane caused a large amount of destruction. Explain the ways in.
Marine Transportation System Common Assessment & Reporting Tool (CART) Mr. Thomas Kalisz, USCG “The nation needs a coordinated, integrated approach to.
GCOOS Recreational Boaters Channel History The Port of Houston was officially opened in 1914 with some fanfare but it was several months later, in.
Building the GCOOS Maintenance of Observing Elements Ann Jochens GCOOS-RA Annual Meeting of the Parties & Board of Directors February 2009 Orlando,
Briefing at: Consequence Analysis Workshop October 30, 2012.
1 Marine Transportation System (MTS) Recovery "Our operational capabilities also include developing a national capacity for Marine Transportation System.
© Copyright 2013, State Impact. Image source: The Center for Land Use Interpretation photo archive. Used with permission.
DIVISION OF PORTS AND HARBORS PORTSMOUTH, NEW HAMPSHIRE Captain Geno J. Marconi, Port Director.
THE VULNERABILITY OF GULF OF MEXICO SHIPYARDS TO COASTAL FLOODING AS A RESULT OF STORM SURGE By Capt. Christopher Bowman.
Petrochemicals in harbor areas; safety supervision and emergency response Presented by Captain David Murk U.S. Coast Guard Senior Maritime Advisor to the.
Hydrographic Services Review Panel 2011 Hydrographic Services Review Panel 2011 CAPT Mark Ogle COMMANDER, SECTOR HAMPTON ROADS.
A PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC SERVICES (NCOP) 24 OCTOBER 2007 BY MPATLISENG RAMAEMA CHIEF DIRECTOR: MARITIME TRANSPORT REGULATION DEPARTMENT.
Public-Private Partnerships in Action: Emergency Response
Session 16: Distribution of Geospatial Data 1 Distribution of Geospatial Data in the Public Environment Hazard Mapping and Modeling.
Organizational Tabletop Exercise 1 Hurricane Scenario (Community-Based Organizations) Date | Location.
U.S. Coast Guard Unclassified
Coastal Texas Protection and Restoration Project
NOAA PORTS ® Partnerships MARACOOS Annual Meeting 12/15/2011 Darren Wright Maritime Services Program Manager.
Master / Pilot exchange
HURRICANES WHAT A DIFFERENCE A tropical storm becomes a hurricane when its winds reach what speed? 45 mph 64 mph 74 mph 80 mph 45 mph 64 mph 74 mph 80.
United States Coast Guard Marine Transportation Systems Management George Detweiler U.S. Coast Guard Washington, DC NOAA’s Hydrographic Services Review.
USACE Post-Hurricane Monitoring requirements Post-storm assessments of Corps Projects Damage estimates (economic & engineering) Extreme event data – forensic.
1 Maritime Targeting and Boarding Overview. 2 Objectives Notice of Arrival requirements Targeting Boardings & Examinations –Security Boardings - Targeted.
Harbor Safety Committee of the San Francisco Bay Region Established by state law to prevent oil spills in San Francisco Bay by planning “for the safe navigation.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Minerals Management Service Pipeline and Natural Disasters- Are we Prepared? Restoring Trust in Pipeline Safety A Conference for all Stakeholders November.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
Hurricanes …no two are the same… Bill Read Director National Hurricane Center.
Harbors Module NH2: Problem Identification, Inventory and Forecast, and Determination of Objectives and Constraints.
NMSZ Event Overview: Roles, Responsibilities, and the Marine Transportation System Recovery Unit (MTSRU) 22 April 2015 Semper Paratus United States Coast.
2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011.
Tug Escort Work Group Commented on and worked with a state senator’s staff on proposed state legislation that would require tug escorts for chemical tankers,
 MSU Port Arthur Maritime Industry Plan o Port Conditions  MSU Port Arthur Hurricane Plan o Hurricane/Severe Weather Response Operations  Sector Houston.
Harbor Maintenance and Dredging: A Legislative Update CAPT Bill Diehl, USCG (Ret.), P.E. President Greater Houston Port Bureau.
Marine Industry Day 2015 Waterways Management Division: (504) Vessel Traffic Center LMR: (504) Sector Command Center (24 hours): (504)
1 USCG UPDATE – Fall 2014 Intertanko North American Panel Houston, TX.
FREEMAN HURRICANE DAMAGE POTENTIAL SCALE GULF OF MEXICO HURRICANES PAST – PRESENT – FUTURE PUG 2009 February 2009 Jill F. Hasling, President Ben Maloney.
Authority: Who Does What?. Los Angeles – Long Beach Area Contingency Plan Marine Firefighting and Salvage Plan.
1 INTERTANKO NORTH AMERICAN PANEL Tanker Industry Topics Captain Brian Penoyer Sector Commander and Captain of the Port Coast Guard Sector Houston-Galveston.
Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 1, 2008.
TERMINATING THE INCIDENT. Incident Transition Transition is the phase between the end of the emergency and the initiation of restoration and recovery.
Central Houston, Inc. Houston Downtown Management District 909 Fanin, Suite 1650 Houston, Texas / Operations
Communications Coordination Group (CCG). MISSION To facilitate interagency coordination and collaboration to provide efficient and effective pre-planning.
Port Agent, Houston Pilots
2011 Hurricane Season Brief
Gulf Coast (and Florida) Transportation Recovery With Dale McClung, Director of Design Solutions September 13, :15 PM.
Hurricane Port Conditions & Preparedness
USCG Roles & Responsibilities During a Ship Fire
EHCMA Hurricane Workshop
Presentation transcript:

Dock Suitability LCDR Xochitl Castañeda Chief, Waterways Management Division Sector Houston-Galveston Prepared for Dredging Your Docks 2012 November 7, 2012

TOPICS Lone Star Harbor Safety Committee Hurricane Rita & Hurricane Ike Groundings at dock MSIB MSIB Conclusions

Lone Star Harbor Safety Committee A public forum to address navigation safety-related matters involving the ports of Houston, Galveston, Texas City, and Freeport including the associated waterways of the Gulf Intracoastal Waterway and offshore lightering zones. Regional expertise and insight to address such issues as vessel traffic management, anchorage management, communications, security, significant/heavy weather preparations, maritime traffic disruption/restoration, process improvements, and any other related topics dealing with the MTS.

LONE STAR HSC Membership

LONE STAR HSC Dredging Subcommittee Provide a forum to discuss, communicate, and as necessary make recommendations regarding dredging issues as related to safety within the Houston, Texas City, Galveston area waterways

Houston/Galveston Complex Ports of Houston, Galveston, and Texas City Home to the world’s 2nd largest petrochemical complex

Grounding at Dock A vessel is ordered in with no dock restrictions and given instructions for loading cargo The vessel is moored in good order The vessel loaded all of the cargo despite grounding on their bow (3M) Pilot attempts to get vessel U/W

A Busy Port

Possible Factors Surveys were current and IDed the area of shoaling- Facility did not tell vessel about the area of shoaling Construction of a pier required mooring further up the dock Mound possibly caused by tugs assisting vessels across the channel Vessel did not use a lead line and possibly did not get off the vessel to check drafts

Hurricane Rita

September 24, 2005 near Sabine Pass, TX 4th-most intense Atlantic hurricane ever recorded Most intense tropical cyclone ever observed in the Gulf of Mexico

Hurricane Rita Source: HOU/GAL VTS (2005)

Hurricane Rita 9/22/ Port Closed 9/24/ VTC Powers Up and Begins Damage Assessment 9/25/ Survey Boats at Various Locations begin Conducting Surveys 9/26/ Local Transits of Light Boats Begin 9/26/ Daylight Transit (35 ft) Begin. 9/29/ Channel Open to Project Depth Time Lapse: 1D 20H 2D 19H 3D 11.5H 3D 15.5H 6D 22.5H Source: HOU/GAL VTS (2005)

Post-Rita Response USCG, USACE, and NOAA surveyed federal channels to locate shoaling and obstructions due to Hurricane Katrina, several survey vessels were already mobilized in close proximity to the HGC and able to quickly perform post-storm surveys pre- and post-hurricane surveys were compared to help provide a critical analysis of the waterways prior to allowing ship traffic to re-enter the HGC, and used to request emergency funding for the dredging of channels and the removal of obstructions

Post-Rita Response In 2005, however, pre-hurricane surveys in the HGC were not completed for all waterfront facilities, and post-hurricane surveys were completed only by a small number of waterfront facilities Fortunately, little shoaling occurred in the HGPC as a result of Hurricane Rita, no underwater obstructions were detected, and facilities suffered only minor damage

Post-Rita Response Federal Responders do not conduct surveys at non-federal government facilities and that the responsibility to survey a facility’s docks and moorings rests with the facility itself, Dredging Subcommittee developed a proactive navigation preparedness initiative in the form of a “Best Practice Guidelines” for waterfront facilities.

MSIB 07-07

Recommends Recommends Annual survey conducted by the waterfront facility prior to the start of hurricane season, and Establishment of a plan to have an emergency post storm survey of docks and moorings completed as soon as possible

MSIB Purpose of Surveys Assist the USCG in determining whether or not vessels can safely arrive at a facility’s dock or mooring, Provide valuable documentation of damage or loss for insurance companies, and May support an emergency declaration and access to Federal financial assistance.

MSIB Noted a significant number of dockside groundings Cited reporting requirements (CG-2692) Facilities should conduct periodic surveys and report survey info to Pilots, Vessel Agents and arriving Vessels

Implementation Distribution of the Best Practices for Surveying Guidelines to waterfront facilities (out soon) Choose a hydrographic surveyor

Hurricane Ike

September 13, 2008 at Galveston, TX Strong Category 2 Storm at landfall, projected storm surge comparable to Category 4 Direct impacts to Ports of Houston, Galveston, and Texas City

MSIB 06-08

Hurricane IKE

Hurricane Ike Source: NOAA/AOML/Hurricane Research Division Surface Winds (Kts) Maximum Sustained

Hurricane Ike Survey vessels pre-staged based on Port Coordination Team (PCT) meetings Part of “Lessons Learned” from Hurricane Rita

Port of Houston Galveston-TX City Pilots Port of Texas City Port of Galveston Port of Freeport Offshore Port American Waterways Operators West Gulf Maritime Houston Pilots Harbor Tugs Oil Refineries Oil Terminals Chemical Carriers Non-VTS Users Port Coordination Team PCT

PCT Goals 1) Communicate, communicate, communicate 2) Coordinates port wide posture changes in response to all threats/all hazards 3) Ensures Port reopening and prioritization of maritime traffic optimizes timely supply of critical commodities to facilities 4) Assists Federal/State/Local responders with local knowledge, expertise and supplies

Hurricane Ike 9/11/ Port Closed 9/13/ Post-storm Waterways and Infrastructure Assessments Extensive surveys, to include aerial assessments, initial centerline surveys, aids to navigation assessments, and waterside facility assessments. Port Coordination Team (PCT) efforts with port stakeholders are essential for a quick and efficient assessment of all COTP waterways. Partnering with industry to restore navigation on the COTP zone waterways is essential in the process of reopening this economically critical port. 9/15/ VTS Houston-Galveston Resumes Full Operations 9/15/ Shallow Draft Vessel (≤ 12ft) Begin Transits in HSC & GICW (MM350 to MM342 w/in COTP Zone Houston-Galveston) – Within 48hrs 9/15/08 Daylight Transits (38ft - Port of Freeport) 9/17/08 Daylight Transits (38ft - Sea Buoy to Shell / 30ft - Shell to Turning Basin; 30ft - Port of Galveston; 16ft - Port of Texas City) – Within 96hrs 9/23/08 HSC Open to Project Depth Source: Sector HOU/GAL (2008)

Hurricane Ike Approximately 65-75% of terminals had conducted pre-storm surveys – Ports of Houston, Galveston, Texas City Percentage is a significant improvement compared to pre-Rita levels Terminals with recent surveys sent to “top of the line” – Priority with regards to Facility Inspections to render re-opening status.

Conclusions Lone Star HSC initiative to encourage terminals to conduct pre-storm surveys aided in the quick re- opening of the Houston Ship Channel Post-Ike Port Coordination Team – Strong relationships, cooperative communication – Expedite economically vital port recovery Many terminals still do not understand they are responsible for post-storm surveys of their facilities

Questions? Waterways Management Division (713)