Jeff Carpenter State Construction Engineer WSDOT Design-Build Contracting 2011 AASHTO Subcommittee on Construction Virginia Beach City, VI August 2, 2011.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

DESIGN BUILD NATIONAL PERSPECTIVE by Dwight Horne FHWA.
Oregon Jobs and Transportation Act Section 18
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Finally! – A Process that Looks at Environmental Risk Early J. S. Irving Environmental Compliance Idaho National Laboratory.
TH 55 Mill and Overlay Design-Build Project S.P
City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.
Ensure Vendor/Engineer of Choice Product Quality
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
A Match made in Heaven? Connecting you with a builder.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
Utah’s Use of CMGC & Project Delivery
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
DESIGN-BUILD CM Perspective Owner’s Expectation – DB is Master Builder Stakeholder’s Expectation – DB must satisfy their requirements DB’s Expectation.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
Project Delivery Method Selection Guidance ACEC/WSDOT Annual Meeting June 11, 2015 Jeff Carpenter Director, WSDOT Construction Division.
Procurement Engineering and Review Team (PERT) PEER REVIEW PROGRAM Patrick Marmo 2/7/2012 Independent Peer Review Program for Contractor’s Purchasing Systems.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Honoraria for Design Build Projects Methodology Assessment Matrix.
Energy | Transportation | Real Estate | Municipal | Government | Industry | Water | Institutions District Wide Acquisition & Relocation.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
CODES, STANDARDS AND GUIDELINES
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
CMM Level 2: Repeatable Copyright, 2000 © Jerzy R. Nawrocki Quality Management.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11,
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.
Do you have what it takes to win the next P3 or D-B Project? Steven Kramer, PE Vice President Jacobs.
Business Plan Vee See Construction Company, Inc. Marjorie L. Herter.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
DESIGN-BUILD Design Perspective DESIGN MANAGER RESPONSIBILITES/ATTRIBUTES Manage the Design Single Point of Communication Adaptable to changes.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Office of Major Project Development (OMPD) Overview November 2015.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
The following training presentation is for all 1Prospect employees and is taken upon joining the company team. Quality Management System (QMS) Training.
Light Rail Transit Project
Resident Engineer Training
The following training presentation is for all employees and is taken upon joining the company team. Quality Management System (QMS) Training Proprietary.
Enterprise Content Management Owners Representative Contract Approval
Sales Process March 2017.
PROJECT DELIVERY METHODS
Community Development Department
Controlling Project Cost and Schedule
Presentation transcript:

Jeff Carpenter State Construction Engineer WSDOT Design-Build Contracting 2011 AASHTO Subcommittee on Construction Virginia Beach City, VI August 2, 2011 Paula Hammond Secretary of Transportation J.C. Lenzi Assistant Secretary Engineering and Regional Operations

WSDOT Design Build Experience Began as ‘One-off’ Mega projects delivery tool Selection process has been primarily two step/short list with stipend Best Value determined as proposal price adjusted by technical score WSDOT moving to Strong Owner role, no longer Engineer of Record Adapting our design practices to Contract Standards

WSDOT – Design-Build “advantages” Cost Certainty Scope Control Can drive immediate innovation during procurement Lower owner personnel commitment Design-Build model works well on complex and larger projects

Roles and Responsibilities - Design Design Builder  Prepares and stamps the design – Engineer of Record  Owns risk of design errors – no change order for plan omissions or survey errors  Maintains files and design documentation  Accepts quantity/cost risk  Performs Construction QC/QA Owner  Prepares preliminary design approval document used to determine deviations if Design Builder makes changes  “ACCEPTS” the design – at the end of the project  Verifies that the Design Builder is meeting WSDOT standards with over-the- shoulder reviews and audits  Responsible for environmental permitting 4

Roles and Responsibilities - Construction Design Builder  Performs Quality Control  Performs Quality Assurance  Responsible for finding solutions to problems encountered  Responsible for environmental compliance  Accepts Constructability Risk of their own design  Accepts Schedule Risk  Certifies Materials Quality/compliance with Federal funding requirements  Initial Differing Site Condition Risk is assigned to DB via a project ‘deductible’ Owner  Provides Quality Verification  Over the shoulder review and comment of engineering solutions  Administration and payment of contract  Assumes responsibility for catastrophic risk * 5

Ongoing/Future Efforts Outreach/contact with industry –AGC/ACEC/WSDOT Design Build Team –WAPA Outreach/support/education to projects Incorporate Design Build in a Design Bid Build agency –Expanded use of DB on mid-sized projects Establishing a consistent selection process for DB projects Standardizing the contract template documents Introducing scalability – for use on small projects Increased use of DB to meet agency resource limitations